You are on page 1of 2

BILL OF QUANTITIES Cost Breakdown:

NOTE: BASED ON KEYPLAN ATTACHED

item description Unit Qty Total Unit Cost Amount

area hallway @ 2.8


A sq.m 199.40368
ht.soffit to ffl
a. chb laying 4" , lintel
beams intended @ sq.m 4,687.31 1,301.00 6,098,195.62
hallway ,31flrs level

a.' chb laying 4" , lintel totalarea of beam (400


B sq.m 17
beams intended @ sq.m 6,865.16 1,301.00 8,931,574.20 x 600)@hallway
interior part. ,31flrs level

A.SUB-TOTAL 15,029,769.82

total area of door s @


C sq.m 31.2
b . Plastering works 26 sets , 1m x 2.1ht.
smooth finish @hallway, sq.m 9,374.63 390.00 3,656,104.98
31 levels

T A-(B+C) Estimated Qty @ hallway 151.20368

B
interior partition with
A sq.m 120.554
beam @ 2.8 slab soffit
b' . Plastering works
total area of
smooth finish @interior sq.m 13,730.32 390.00 5,354,825.42 B sq.m 12.92
beam(500x600)
partition 31 levels T (A-B) Estimated Qty 107.634

interior partition w/o


A sq.m 113.8228
beam @ 2.8 slab soffit

B.SUB-TOTAL 9,010,930.41 T A Estimated Qty 113.8228


24,040,700.23 (T+T) Qty for interior partition
A+B TOTAL 221.4568
SUMMARY OF BILL OF QUANTITIES-BASED BID ADDENDUM

wt% in Proposed deductive Pro-rata of


NO. Item Description Amount wt% Prelim breakdown wt% deduc. qty
prelim amount preliminaries

1.0 General Requirements 73,735,100.00


22.48%

mobilization 400,000.00
tel/elec/water 19,484,000.00

safety/sanitation/cleaniness 4,803,300.00

site supervision 9,386,000.00


demobilization 400,000.00
34,473,300.00

2.0 site works 14,316,257.50 4.36% 5.63% 4,151,617.77


3.0 structural works 85,305,100.35 26.01% 33.55% 24,737,901.71
4.0 masonry works 53,213,143.00 16.22% 20.93% 15,431,451.30 15,029,769.82 28.24% 4,358,531.52
others conc. Toppings/tilling
5.0 12,357,037.48 3,583,457.23
3.77% 4.86%
6.0 wall finishes 33,317,544.00 10.16% 13.10% 9,661,862.25 9,010,930.41 27.05% 2,613,108.83
7.0 ceiling 11,130,512.50 3.39% 4.38% 3,227,773.29
8.0 steelworks/door/ceiling 3,749,260.00 1.14% 1.47% 1,087,260.02
9.0 toilet accessories 148,900.00 0.05% 0.06% 43,179.99
metal works 12,160,860.42 3.71% 4.78% 3,526,567.21
waterproofing 9,936,103.00 3.03% 3.91% 2,881,402.62
misc. 11,528,951.75 3.51% 4.53% 3,343,317.97
others 7,101,230.00 2.17% 2.79% 2,059,308.64
100.00% 100.00% 73,735,100.00
Total Direct Cost (labor &
A. 254,264,900.00
Mat.)
A+1 Grand Total 328,000,000.00 24,040,700.23 6,971,640.35