PROJECT: VISTA GL TAFT

SUBJECT: STP TANK (INTERIOR PAINTING)


ADDITIONAL WORKS

GCRC EVALUATION
ITEM AREA DESCRIPTION
QTY UNIT UNIT COST
1. Application of concrete neutralizer
2. (1 coat) Application of Boysen
Permacoat Flat White for primer
3. Full application of Boysen Masonry
A Wall 86.78 sqm. 265.00
Putty
4. (2coats) Application of Boysen
Permacoat Semi-gloss approved color
for topcoat
1. Application of concrete neutralizer
2. (1 coat) Application of Boysen
Permacoat Flat White for primer
3. Full application of Boysen Masonry
B Ceiling and Beams 115.93 sqm. 265.00
Putty on areas necessary
4. (2coats) Application of Boysen
Permacoat Semi-gloss approved color
for topcoat
1. (1 coat) Application of Boysen
Epoxy Primer
C Epoxy Flooring 2. (3 coats) Application of Boysen 80.65 sqm. 600.00
Epoxy Enamel approved color for
top coat
TOTAL
C EVALUATION DAAA EVALUATION
TOTAL AMOUNT QTY UNIT UNIT COST TOTAL AMOUNT

PhP22,996.70 sqm. 265.00

PhP30,721.45 sqm. 265.00

PhP48,390.00 sqm. 540.00