Calculation description:
Reporting method: Basique
The estimated building construction cost data shown below is based on 'per gross internal floor area' costs of services, sub-
structure and frame construction. The cost of constructions and glazing is based on the 'per surface area' cost data from the
constructions and glazing database. Surface finish costs are also calculated from actual building surface areas and entered
surface finish per area costing data.
Is the user's responsibility to ensure that input data is checked and the basis for the calculations is understood.
Construction
Super Structure Cost Cost (GBP)
Area (m2)
Surface Area
Glazing Cost Cost (GBP)
(m2)
PV Electrical 0,00
Surface Area
Surface Finish Costs Cost (GBP)
(m2)