No. 1 RECEPTION AREA 1 2 WORKER ENTRY 2 3 SPD ROOM 3 4 SPD CORRIDOOR 4 5 FORMULATION CORIDOOR 5 6 PACKING CORIDOOR 6 7 STORE - 01 7 8 DISPATCH 8 9 F/FLOOR FORMULATION CORIDOOR 9 10 F/FLOOR SPD CORIDOOR 10 11 BOILER SHATTER IN SIDE 11 12 5/FLOOR CARAMEL SHUTTER 12 13 CARAMEL FILTER ROOM 13
Approved By:______________________ RODA BOX INSTALLED DETAILS
Sr. AREA DEFINE RODA BOX NO. REMARK
No. 1 RECEPTION ENTRY GATE 1 2 RECEPTION ENTRY GATE 2 3 NR. RECEPTION AREA 3 4 NR. RECEPTION AREA 4 5 WORKER ENTRY ROOM 5 6 RECE AREA IN SIDE 6 7 RECE AREA IN SIDE 7 8 RECE AREA OUT SIDE 8 9 DISPATCH AREA IN SIDE 9 10 DISPATCH AREA IN SIDE 10 11 NR. LAB ENTRY ROOM(F/FLOOR) 11 12 NR. LAB ENTRY ROOM(F/FLOOR) 12 13 NR. LAB ENTRY ROOM(F/FLOOR) 13 14 NR. A/C OFFICE STAIRCASE 14 15 5/FLOOR CARAMEL SHUTTER OUT SIDE 15 16 5/FLOOR CARAMEL SHUTTER OUT SIDE 16 17 5/FLOOR CARAMEL SHUTTER IN SIDE 17 18 5/FLOOR CARAMEL SHUTTER IN SIDE 18 19 NR. BOILER SHATTER IN SIDE 19 20 NR. BOILER SHATTER IN SIDE 20 21 DISPATCH SHUTTER OUT SIDE 21 22 DISPATCH SHUTTER OUT SIDE 22 23 BOILER SHUTTER OUT SIDE 23 24 BOILER SHUTTER OUT SIDE 24 25 SPD SHUTTER OUT SIDE 25 26 SPD SHUTTER OUT SIDE 26 Approved By:______________________