engine room machinery layout & arrangement

SAMPLE: PRODUCT /CHEMICAL TANKER


50,000 DWT

VENKAT KRISHNA

Chief Engineer
TANK TOP 6
PORT
PLATFORM

12
4
5
9

AFT

10 11

8
2

STARBOARD

13

BOTTOM BOTTOM
FLOOR FLOOR

E/R

BILGES 5

TANKS &
COFFERDAM
8
TANK TOP PLATFORM LAYOUT DETAILS
POSITION DESCRIPTION REMARKS
1. ENGINE ROOM BILGE SUCTION PORT SIDE
2. ENGINE ROOM BILGE SUCTION STARBOARD SIDE
3. BILGE HAT SUCTION MAIN ENGINE FLYWHEEL BILGE
4. AFT BILGE SUCTION AFT OF ENGINE ROOM
5. LUBRICATING OIL TANK (SUMP) FOR MAIN ENGINE (LOCATED BELOW MAIN ENGINE)
6. HIGH SEA CHEST PORT SIDE (SEA WATER SUCTION)—PART OF BOTTOM FLOOR
7. LOW SEA CHEST STARBOARD SIDE (SEA WATER SUCTION)
8. COFFERDAM LOCATED ON BOTTOM FLOOR ALL AROUND AND UNDER VARIOUS
TANKS
9. FUEL OVERFLOW TANKS FOR HFO, MDO, MGO OVERFLOWING FROM STORAGE TANKS
10. EMERGENCY SEA CHEST INDEPENDENT SEA WATER SUCTION FOR EMERGENCY FIRE PUMP
11. OILY BILGE TANK FOR STORING OIL MIXED WATER WASTE IN E/R—TO BE PUMPED
TO INCINERATOR FOR DISPOSAL
12. BILGE HOLDING TANK FOR STORING WASTE WATER IN E/R—TO BE PUMPED THROUGH
OILY WATER SEPERATOR
BOTTOM FLOOR PLATFORM

11
3

12

14

7
1
9

10
13 8

BOTTOM FLOOR PLATFORM LAYOUT DETAILS


POSITION DESCRIPTION REMARKS
1. MAIN ENGINE FOR PROPULSION, MOUNTED ALONG CENTRELINE OF SHIP
2. VARIOUS SEA WATER PUMPS COOLING FW PP, MSW PP, FIRE GS PP, SCRUBBER PP ETC.
3. HIGH SEA CHEST SEA WATER SUCTION FOR VARIOUS SERVICES
4. FUEL TRANSFER PUMP HFO, MGO, MDO TRANSFER PUMPS TO SETTLING/SERVICE TANKS
5. EMERGENCY ESCAPE TRUNK FOR EVACUATING ENGINE ROOM IN EMERGENCY
6. 15 PPM OILY WATER SEPERATOR FOR TRANSFERRING ENGINE ROOM BILGES TO 15 PPM OILY WATER
PUMP SEPERATOR
7. MAIN ENGINE LUB. OIL PUMPS 2 NOS. PUMPS FOR MAIN ENGINE LUBRICATION
8. SEA CHEST FILTER LOW & HIGH SEA CHEST STRAINERS TO FILTER SEA WATER
COMING FROM SEA.
9. BILGE TRANSFER PUMP TO TRANSFER E/R BILGES TO BILGE HOLDING TANK
10. STAIRCASE TO MOVE UP AND DOWN BOTTOM TO & FROM MIDDLE PLATFORM
11. SLUDGE PUMP FOR TRANSFERRING E/R SLUDGE TO OILY BILGE TANK
12. HFO STORAGE TANKS (P & S) FOR STORAGE OF FUEL BUNKERED
13. EJECTOR PUMP FOR EVAPORATOR (FRESH WATER GENERATOR)
14. PROPELLER SHAFTING PROPELLER SHAFT, INTERMEDIATE SHAFT BEARING ETC.
5

10
3
2

17

20

19 7

21

16
8
18

14
15
13 12
11

2ND DECK OR 9

MIDDLE PLATFORM
2ND DECK OR MIDDLE PLATFORM LAYOUT DETAILS
POSITION DESCRIPTION REMARKS
1. 15 PPM OILY WATER SEPERATOR FOR DISPOSING E/R BILGE WATER TO OVERBOARD AT 15PPM
2. SEWAGE TREATMENT PLANT FOR PROCESSING SHIPBOARD SEWAGE & DISPOSAL
3. SEWAGE HOLDING TANK TREATED SEWAGE AND GRAY WATER TANK
4. PURIFIER ROOM ROOM CONTAINING FUEL OIL HEATERS, PURIFIERS (HFO, LO, DO),
FUEL SUPPLY PUMPS TO MAIN ENGINE & AUX. ENGINES
5. HFO SETTLING & SERVICE TANKS STORAGE OF FUELS
6. LSFO SETTLING & SERVICE TANKS STORAGE OF FUELS
7. FUEL OIL STORAGE TANKS HFO & DIESEL OIL STORAGE TANKS
8. HYDRAULIC POWER PACK ROOM FOR CARGO PUMPING SYSTEMS (PRODUCT & CHEMICAL
TANKERS)
9. MGO STORAGE TANKS STORAGE OF MARINE GAS OIL
10. COFFERDAM PROVIDED ALL AROUND ALL FUEL OIL TANKS
11. FRESH WATER COOLER FOR COOLING FRESH WATER
12. MAIN ENGINE J.W. PREHEATER FOR HEATING & WARMING COOLING WATER FOR MAIN ENGINE
13. FRESH WATER GENERATOR FOR PRODUCTION OF FRESH WATER
14. VARIOUS EQUIPMENTS M.E. LUB. OIL COOLER, JACKET WATER PUMPS, J.W. COOLER
15. HOT WELL (CASCADE TANK) FOR AUX. AND EXHAUST GAS BOILERS.
16. SOOT DRAIN TANK COLLECTING WASHING WATER OF EXHAUST GAS BOILER
17. EMERGENCY ESCAPE FOR EMERGENCY EVACUATION OF ENGINE ROOM
18. FEED WATER PUMP FOR BOILER SUPPLYING WATER TO BOILER FOR PRODUCING STEAM
19. AUX. ENGINE (GENERATOR ENGINE) 3 NOS. AUX. ENGINES FOR POWER GENERATION ON BOARD
20. STAIRWAYS FOR MOVING UP TO TOP PLATFORM & GOING DOWN TO BOTTOM
PLATFORM.
21. MAIN ENGINE FOR PROPULSION
2

3
1

20
15 17

13

14
18

21 6
19

16
12

9
10 8 7
11

1ST DECK OR TOP


PLATFORM
1ST DECK OR TOP PLATFORM LAYOUT DETAILS
POSITION DESCRIPTION REMARKS
1. ENCINE CONTROL ROOM ECR MAIN CONTROL STATION FOR ENGINE ROOM
2. LUBRICATING OIL STORAGE TANKS MAIN ENGINE AND AUX. ENGINE LUB. OIL STORAGE TANKS
3. FUEL OIL STROGE TANKS HFO SETTLING AND SERVICE TANKS
4. REFRIGERATION & A.C. UNIT FOR PROVISION REFRIGERATION & AIR CONDITIONING OF
ACCOMMODATION
5. FRESH WATER HYDROPHORE, FRESH WATER SUPPLY TO ACCOMMODATION & OTHER SERVICES
CALORIFER & STERILIZER UNIT IN ENGINE ROOM & DECK, HOT WATER SUPPLY & WATER
FILTRATION UNITS.
6. FUEL OIL STORAGE TANKS FOR STORING FUEL & DIESEL OILS (CONTINUED FROM BOTTOM &
MIDDLE PLATFORMS)
7. MAIN AIR COMPRESSOR & AIR FOR STARTING MAIN ENGINE & AUX. ENGINES. COMPRESSED AIR
BOTTLES IS STORED AT 30 BAR IN AIR BOTTLES.
8. CYLINDER OIL DAY TANK FOR MAIN ENGINE CYLINDER LUB. OIL SUPPLY WHILE RUNNING
9. CYLINDER LUB. OIL STORAGE TANKS FOR MAIN ENGINE CYLINDER LUBRICATION
10. WORKSHOP FOR CARRYING OUT MAINTENANCE ACTIVITIES IN E/R, WELDING
ETC.,
11. STORE SPARES FOR SHIP ARE STORED IN THIS COMPARTMENT
12. W.O. INCINERATOR FOR DISPOSING WASTE OIL, GARBAGE ETC.,
13. AUXILIARY BOILER FOR PRODUCING STEAM FOR SERVICES IN E/R
14. SPARES FOR MAIN ENGINE LARGE SPARES LIKE CYLINDER LINER, CYL. HEAD, EXHAUST VALVES
STORED IN THIS PLATFORM.
15. EMERGENCY ESCAPE FOR EVACUATING ENGINE ROOM IN CASE OF EMERGENCY
16. WORKING AIR COMPRESSOR & AIR COMPRESSOR AND AIR BOTTLE FOR SUPPLYING COMPRESSED AIR
BOTTLE AT 7 BAR TO VARIOUS SERVCIES & CONTROL SYSTEMS.
17. VALVE REMOTE CONTROL SYSTEM VRCS UNIT FOR REMOTELY CONTROLLING CONTROL VALVES ON
DECK (HYDRAULIC UNIT)
18. EXHAUST PIPE EXHAUST PIPE FROM MAIN ENGINE LEADING TO EXHAUST GAS
ECONOMISER FOR WASTE HEAT RECOVERY SYSTEM (TO PRODUCE
STEAM FROM HEAT OF EXHAUST GASES GOING TO ATMOSPHERE).
19. STAIRCASE STAIRWAY FOR MOVING DOWN TO MIDDLE PLATFORM.
20. STAIRCASE STAIRWAY LEADING TO UPPER DECK OUTSIE ENGINE ROOM.
21. STAIRCASE STAIRWAY LEADING UP TOWARDS CASING AND FUNNEL