SPDC JV Daily Gas Production and Utilisation Data ( MMscf/d) - Provisional
Gas Produced Gas Utilised Gas Flared
DATE Total Gas Produced Domestic Sales Total Gas Utilised Gas Flared
BP13 Target Actual NGL / (NGC + Gas Re- BP Target Actual BP Target
AG NAG Fuel Gas LNG LPG, JV IPP Others) Injection Gas-Lift Actual % Flared Daily Incident Report/Remarks
• BELEMA GP on standby - was manually shut down at 0900 hrs on 20/02/13, Soku GP not available• Nembe 1F/S Completed PV/RV Statutory Inspection. Standby for O/u. AWGP,Nembe 1,2/3/4, SBar/1 on standby; F/Ss S/D on Low Pipeline Pressure
(26/03) . • SOKU GP manually shut down on 20/02 for mtc activities / leak along the EGGS-1 gas export line
01-Apr-13 218 1,156 1,374 34 1,017 166 8 22 1,247 126 9

• BELEMA GP on standby - was manually shut down at 0900 hrs on 20/02/13, Soku GP not available• Nembe 1F/S Completed PV/RV Statutory Inspection. Standby for O/u. AWGP,Nembe 1,2/3/4, SBar/1 on standby; F/Ss S/D on Low Pipeline Pressure
(26/03) . • SOKU GP manually shut down on 20/02 for mtc activities / leak along the EGGS-1 gas export line
02-Apr-13 247 1,352 1,599 35 1,216 181 15 25 1,471 128 8

• BELEMA GP on standby - was manually shut down at 0900 hrs on 20/02/13, Soku GP not available• Nembe 1F/S Completed PV/RV Statutory Inspection. Standby for O/u. AWGP,Nembe 1,2/3/4, SBar/1 on standby; F/Ss S/D on Low Pipeline Pressure
(26/03) . • SOKU GP manually shut down on 20/02 for mtc activities / leak along the EGGS-1 gas export line
03-Apr-13 249 1,387 1,636 37 1,217 211 15 26 1,506 130 8

• BELEMA GP on standby - was manually shut down at 0900 hrs on 20/02/13, Soku GP not available• Nembe 1F/S Completed PV/RV Statutory Inspection. Standby for O/u. AWGP,Nembe 1,2/3/4, SBar/1 on standby; F/Ss S/D on Low Pipeline Pressure
(26/03) . • SOKU GP manually shut down on 20/02 for mtc activities / leak along the EGGS-1 gas export line
04-Apr-13 237 1,391 1,628 37 1,223 194 15 30 1,500 128 8

• BELEMA GP on standby - was manually shut down at 0900 hrs on 20/02/13, Soku GP not available• Nembe 1F/S Completed PV/RV Statutory Inspection. Standby for O/u. AWGP,Nembe 1,2/3/4, SBar/1 on standby; F/Ss S/D on Low Pipeline Pressure
(26/03) . • SOKU GP manually shut down on 20/02 for mtc activities / leak along the EGGS-1 gas export line
05-Apr-13 249 1,391 1,640 38 1,224 213 16 28 1,519 121 7

• BELEMA GP on standby - was manually shut down at 0900 hrs on 20/02/13, Soku GP not available• Nembe 1F/S Completed PV/RV Statutory Inspection. Standby for O/u. AWGP,Nembe 1,2/3/4, SBar/1 on standby; F/Ss S/D on Low Pipeline Pressure
(26/03) . • SOKU GP manually shut down on 20/02 for mtc activities / leak along the EGGS-1 gas export line
06-Apr-13 249 1,369 1,618 38 1,223 212 11 38 1,522 96 6

• BELEMA GP on standby - was manually shut down at 0900 hrs on 20/02/13, Soku GP not available• Nembe 1F/S Completed PV/RV Statutory Inspection. Standby for O/u. AWGP,Nembe 1,2/3/4, SBar/1 on standby; F/Ss S/D on Low Pipeline Pressure
(26/03) . • SOKU GP manually shut down on 20/02 for mtc activities / leak along the EGGS-1 gas export line
07-Apr-13 260 1,334 1,594 38 1,224 181 14 41 1,499 95 6

• BELEMA GP on standby - was manually shut down at 0900 hrs on 20/02/13, Soku GP not available• Nembe 1F/S Completed PV/RV Statutory Inspection. Standby for O/u. AWGP,Nembe 1,2/3/4, SBar/1 on standby; F/Ss S/D on Low Pipeline Pressure
(26/03) . • SOKU GP manually shut down on 20/02 for mtc activities / leak along the EGGS-1 gas export line
08-Apr-13 234 1,328 1,561 41 1,209 167 0 36 1,453 108 7

• BELEMA GP on standby - was manually shut down at 0900 hrs on 20/02/13, Soku GP not available• Nembe 1F/S Completed PV/RV Statutory Inspection. Standby for O/u. AWGP,Nembe 1,2/3/4, SBar/1 on standby; F/Ss S/D on Low Pipeline Pressure
(26/03) . • SOKU GP manually shut down on 20/02 for mtc activities / leak along the EGGS-1 gas export line
09-Apr-13 259 1,274 1,533 38 1,205 133 0 42 1,418 115 7

• BELEMA GP on standby - was manually shut down at 0900 hrs on 20/02/13, Soku GP not available• Nembe 1F/S Completed PV/RV Statutory Inspection. Standby for O/u. AWGP,Nembe 1,2/3/4, SBar/1 on standby; F/Ss S/D on Low Pipeline Pressure
(26/03) . • SOKU GP manually shut down on 20/02 for mtc activities / leak along the EGGS-1 gas export line
10-Apr-13 263 992 1,255 37 852 190 0 39 1,118 137 11

11-Apr-13 276 859 1,135 39 702 213 0 30 984 150 13 · Nembe 2, 3, 4F/Ss open up planned for today. • Nembe 1F/S & S/Bar MPF Opened Up 1800hrs 11th April 2013, following the completion of leak repair on the 24" NCTL at Sego and line de-isolation.

12-Apr-13 273 566 839 37 395 209 10 21 671 168 20

13-Apr-13 339 539 878 31 394 204 16 40 687 191 22

Nembe 2, 3, 4 Stations tripped on low pumpline pressure at 2300hrs, 0115hrs(15/04/13) and 2255hrs 14th April 2013 respectively. Solar Turbine was started up and loaded @ 2313hrs on 14/04/13; it tripped earlier in the day @ 1539hrs. Station tripped on
14-Apr-13 326 564 890 30 398 210 15 46 699 191 22 high level surge at 2200hrs on 14/04/13 - EP3 stopped on load

15-Apr-13 259 721 981 34 538 207 15 30 825 156 16 Ekul 1, 2 & Belema F/Ss manually shutdown at 1015hrs, 1315hrs and 1315hrs respectively on 15/04/14 for Pipe Line to carry out repairs on NCTL. Nembe 1, 2, 3, 4 FSs and SBar MPF manually shut down 15th April 2013 for NCTL repair work

16-Apr-13 236 1,288 1,524 34 1,066 230 15 19 1,364 160.547 10.533 Ekul 1, 2 & Belema F/Ss manually shutdown at 1015hrs, 1315hrs and 1315hrs respectively on 15/04/14 for Pipe Line to carry out repairs on NCTL. Nembe 1, 2, 3, 4 FSs and SBar MPF manually shut down 15th April 2013 for NCTL repair work

Ekul 1, 2 & Belema F/Ss manually shutdown at 1015hrs, 1315hrs and 1315hrs respectively on 15/04/14 for Pipe Line to carry out repairs on NCTL. Nembe 1, 2, 3, 4 FSs and SBar MPF manually shut down 15th April 2013 for NCTL repair work. East
17-Apr-13 187 1,289 1,477 38 1,118 195 15 16 1,382 94.809 6.421 facilities outage on 17/04/13 due to fire on the 24/28" TNP right of way

18-Apr-13 177 1,348 1,525 38 1,153 221 4 18 1,434 90.467 5.933 Ekul 1, 2 & Belema F/Ss manually shutdown at 1015hrs, 1315hrs and 1315hrs respectively on 15/04/14 for Pipe Line to carry out repairs on NCTL. Nembe 1, 2, 3, 4 FSs and SBar MPF manually shut down 15th April 2013 for NCTL repair work.

19-Apr-13 202 1,656 1,859 34 1,480 226 - 28 1,769 89.974 4.841 Ekul 1, 2 & Belema F/Ss manually shutdown at 1015hrs, 1315hrs and 1315hrs respectively on 15/04/14 for Pipe Line to carry out repairs on NCTL. Nembe 1, 2, 3, 4 FSs and SBar MPF manually shut down 15th April 2013 for NCTL repair work.

20-Apr-13 195 1,845 2,040 41 1,658 225 - 15 1,938 102.188 5.008 Ekul 1, 2 & Belema F/Ss manually shutdown at 1015hrs, 1315hrs and 1315hrs respectively on 15/04/14 for Pipe Line to carry out repairs on NCTL. Nembe 1, 2, 3, 4 FSs and SBar MPF manually shut down 15th April 2013 for NCTL repair work.

21-Apr-13 201 1,905 2,106 40 1,733 225 - 16 2,014 92.442 4.389 Ekul 1, 2 & Belema F/Ss manually shutdown at 1015hrs, 1315hrs and 1315hrs respectively on 15/04/14 for Pipe Line to carry out repairs on NCTL. Nembe 1, 2, 3, 4 FSs and SBar MPF manually shut down 15th April 2013 for NCTL repair work.

22-Apr-13 222 2,045 2,267 40 1,884 219 - 31 2,174 93.250 4.113 Ekul 1, 2 & Belema F/Ss manually shutdown at 1015hrs, 1315hrs and 1315hrs respectively on 15/04/14 for Pipe Line to carry out repairs on NCTL. Nembe 1, 2, 3, 4 FSs and SBar MPF manually shut down 15th April 2013 for NCTL repair work.

23-Apr-13 218 2,098 2,316 42 1,941 206 - 35 2,224 92 4 Ekul 1, 2 & Belema F/Ss manually shutdown at 1015hrs, 1315hrs and 1315hrs respectively on 15/04/14 for Pipe Line to carry out repairs on NCTL. Nembe 1, 2, 3, 4 FSs and SBar MPF manually shut down 15th April 2013 for NCTL repair work.

24-Apr-13 210 2,043 2,253 41 1,857 220 - 31 2,150 103 5 Ekul 1, 2 & Belema F/Ss manually shutdown at 1015hrs, 1315hrs and 1315hrs respectively on 15/04/14 for Pipe Line to carry out repairs on NCTL. Nembe 1, 2, 3, 4 FSs and SBar MPF manually shut down 15th April 2013 for NCTL repair work.

25-Apr-13 220 2,090 2,310 42 1,939 208 - 34 2,223 87 4 Ekul 1, 2 & Belema F/Ss manually shutdown at 1015hrs, 1315hrs and 1315hrs respectively on 15/04/14 for Pipe Line to carry out repairs on NCTL. Nembe 1, 2, 3, 4 FSs and SBar MPF manually shut down 15th April 2013 for NCTL repair work.

26-Apr-13 257 2,041 2,298 90 1,881 213 - 33 2,216 82 4 Ekul 1, 2 & Belema F/Ss manually shutdown at 1015hrs, 1315hrs and 1315hrs respectively on 15/04/14 for Pipe Line to carry out repairs on NCTL. Nembe 1, 2, 3, 4 FSs and SBar MPF manually shut down 15th April 2013 for NCTL repair work.

27-Apr-13 221 2,039 2,259 87 1,850 215 - 22 2,174 85 4 Ekul 1, 2 & Belema F/Ss manually shutdown at 1015hrs, 1315hrs and 1315hrs respectively on 15/04/14 for Pipe Line to carry out repairs on NCTL. Nembe 1, 2, 3, 4 FSs and SBar MPF manually shut down 15th April 2013 for NCTL repair work.

28-Apr-13 235 2,097 2,332 81 1,925 217 - 29 2,253 80 3 Ekul 1, 2 & Belema F/Ss manually shutdown at 1015hrs, 1315hrs and 1315hrs respectively on 15/04/14 for Pipe Line to carry out repairs on NCTL. Nembe 1, 2, 3, 4 FSs and SBar MPF manually shut down 15th April 2013 for NCTL repair work.

29-Apr-13 181 2,205 2,385 37 2,018 217 - 28 2,301 85 4 Ekul 1, 2 & Belema F/Ss manually shutdown at 1015hrs, 1315hrs and 1315hrs respectively on 15/04/14 for Pipe Line to carry out repairs on NCTL. Nembe 1, 2, 3, 4 FSs and SBar MPF manually shut down 15th April 2013 for NCTL repair work.

30-Apr-13 192 2,185 2,377 36 2,009 204 - 30 2,279 98 4 Ekul 1, 2 & Belema F/Ss manually shutdown at 1015hrs, 1315hrs and 1315hrs respectively on 15/04/14 for Pipe Line to carry out repairs on NCTL. Nembe 1, 2, 3, 4 FSs and SBar MPF manually shut down 15th April 2013 for NCTL repair work.

Total 7,093 44,396 #DIV/0! 51,489 1,264 39,549 0 0 6,132 183 883 1,600 #DIV/0! 3,477 242