CENTRAL RAILWAY SOLAPUR DIVISION

OFFICE OF ADSTE/ANG
AHMEDNAGAR (CR)

No.: ANG/CONST/Corres/Rem -1 DATE :- 18.01.2024

ADSTE/CONST/ANG,
SUB:- Kind attention in new commissioning’s in DD-MMR section.
In connection with above subject, following observations are to be considered please:
Sr.No STN Description Remark
There is a flaw in circuit while clearing UP home calling-on signal,
resulting Diado Single block instruments gets stuck and following Up
1 AKR train from ANG will not get proper LSS so PLC will be served every
time. Circuit alternation required accordingly to avoid unnecessary
detention of trains.
DL PC UPS is not provided till date because of which data base of
2 AKR data logger system gets corrupted many times and staff is unable to
retrieve the data for failure analyses.
BPAC for the BAP-PDGN section is still pending for commissioning,
3 BAP TDC : 19.01.24
kindly look into this matter.
SR indications on VDU is to be attend, as it must be available during
4 BAP
SR Pick-up condition in both the directions.
LCPR indications will not be appearing on VDU, as soon as Line
Clear is received on SGE double line block instrument in both the
5 BAP
directions. It is visual only after clearing of respective advance
starter.
While performing movement over Sh 5 and Sh 13, simultaneously,
6 BAP
route section of Sh 5 gets stuck, every time.
In case of failure of any point (115,116, 117 & 118), S 1 calling-on
7 BAP
signal didn’t get clear, if concerned point position is in fail condition.
While performing route cancellation of both the Advance starter
8 BAP signals during operation of EUUYN cancellation only, counter will not
increase for both the signals.
Dn Sdg str signal S3/Sh3, during operation of EUUYN cancellation
and EUYN cancellation for S3 cancellation, counter will not increase
9 KPG
in both the cases, whereas for Sh 3 cancellation counter increases
accordingly.
For OV 5 release with Dn home S2 clear, timer circuit gets initiated
10 KPG
with 206 AT only whereas it must be initiated with 206 T drop also.
BSLB board in Dn direction is placed properly at site but in VDU
11 KPG
indication, location of its symbol is required to be update.
Construction of Gate lodge is under progress It is requested to start
construction of relay room and power room, along with the work and
12 LC 30
drawing for which is already given, so as to avoid any kind of delay in
commissioning.
Telecom equipment room building plan is sanctioned at all levels for
13 ANG ANG. It is requested to start the work soon as it is required for
various smooth commissioning.
Hence you are requested to kindly attend the issues as soon as possible, for smooth working.

SHIRISH Digitally signed by


SHIRISH KANOJIA

KANOJIA 10:54:26 +05'30'


Date: 2024.01.18

ADSTE/ANG
C /- Sr.DSTE/SUR for inf please.
C/- Dy.CSTE/Const/BSL for inf and na please.