AT A GLANCE TELECOM FAILURES OVER SC DIVISION DATE :- 30.10.

2021

As per TLC/PCOR controller CMS Locations failures On 31.10.21 : - NIL


Passenger Amenities failures
IN RT Faulty
S. Station/ Nature
NO Company Circuit of fault Remarks Informed
Date Time Date Time section
As per Tech/WL, at WL station on PF-1 03CIB's PF-2: 04CIB's PF-3: 03CIB's PF-4: all CIB's not working. No
response from Partonics staff. Spoken with karim/patronics spare materials required. He will receive
1 Patronics CIB's 27.09.21 16.00hrs _ _ WL Not working. spare materials within 2 or 3 days and he will attend. As on 24.10.2021 company staff on job. As on _
30.10.2021, company staff on job.

ERC AC CLASS TV Display not working. No response from company staff. As per SSE/T/CR/KZJ, failure not
2 FLY ENTERPRISES ERC 03.08.21 17:40 _ _ KZJ Not working. attending by company staff even after several reminders as on 06.10.21. NO AMC. As on 30.10.21 Sent to _
SC for repair.
As per Tech/MCI, at MCI station 02 no.s of ERC not working. Same informed to SSE/T/BPA. As per him
3 No AMC ERC 09.10.2021 17.30hrs MCI Not working. HDMI cables problem and No AMC. 30mts of HDMI cable to be replaced. Reminded on 30.10.21 _

At KZJ/stn Stand by IPIS system CPU not working. Infd to company staff. As per SSE/T/CR/KZJ, company
4 EEC 02nd IPIS 17.07.2021 18.00hrs _ _ KZJ Not working. staff not responding as on 06.10.21. NO AMC. As on 30.10.21 still pending _

As per SSE/T/BIDR, at BIDR CCTV room out of 02 monitors, 01 monitor not working. Informed company
Sun data com Pvt
5 Ltd CCTV Monitor 08.08.21 13.00hrs _ _ BIDR Not working. staff/Mr.Krishna. As on 26.10.21, as per SSE/T/BIDR even after several reminders failure not attended by 9885078999
company staff. Reminded on 30.10.21
As per JE/T/PRLI, 01 near RPF side not working. Informed Mr. Shanteshwar/AM/RCIL. Reminded on
6 RCIL CCTV 30.08.21 20.00hrs _ _ PRLI Not working. 25.10.21. As per SSE/T/UDGR on 30.10.21, still pending.

As per JE/T/DKJ, at DKJ IPIS System not working due to software problem. Mr.Ajay/Company staff not
7 Annai Enterprises IPIS System 26.10.21 17.00hrs 30.10.21 16.20hrs DKJ Not working. responding. As per SSE/T/DKJ, software corrupted, same attened by company staff and restored.

As per Commercial Control/SC, At SKZR on PF-01, 10 No's of CIB's not working. Same informed to
8 IDDS/Delhi CIB's 27.10.21 10.25hrs _ _ SKZR Not working. SSE/T/SKZR & Company staff. As per SSE/T/SKZR Control crads are sent by Courier from IDDS/DELHI
company. Cards not yet received as on 30.10.21

IPAS Connections in SC Division


1 In Personal department total IPAS connections available 117 NIL
2 In Accounts department total IPAS connections available 118 NIL
3 At Way stations total connections are avaialble- 48. NIL

M.Praveen Kumar
JE/T/TR/SC
1. CONTROL FAILURES REPORTED TO HQ:00, U/U- 00 of SC DIVISION DATE :- 30.10.2021
DATE TIME DATE TIME FAULTY NATURE OF
CIRCUITS Remarks
IN IN RT RT SECTION FAULT
CTO-1 - - - - - - Normal
CTO-2 - - - - - - Normal
CTO-3 - - - - - - Normal
CTO-4 - - - - - - Normal
CTO-5 - - - - - - Normal
CTO-6 - - - - - - Normal
Block - - - - - - Normal
BPAC - - - - - - Normal
OFC - - - - - - Normal
6Quad - - - - - - Normal
IB Phone - - - - - - Normal
CMS - - - - - - Normal
FOIS - - - - - - Normal
Auto phones - - - - - - Normal
RC - - - - - - Normal
Data logger /COA - - - - - - Normal
Railnet - - - - - - Normal
CUG - - - - - - Normal
COIS/PAM - - - - - - Normal
.
2. SURVEILLANCE CAMERAS POSITION OVER SC DIVISION DATE : 30.10.2021
SL.no. Station Available DATE TIME Date of AMC/ DATE TIME Remarks Status
IN IN Make Installation Warranty RT RT
1 SC 86 - - _ _ _ - - NIL working normal
2 HYB 41 - - _ _ _ - - NIL working normal
3 VKB 6 - - _ _ _ - - NIL working normal
4 BIDR 6 - - _ _ _ - - NIL working normal
5 WL 8 - - _ _ _ - - NIL working normal
6 KMT 8 - - _ _ _ - - NIL working normal
7 KZJ 9 - - _ _ _ - - NIL working normal

PASSENGER AMENITIES FAILURES


IN RT
STATION/ GEAR AT Date of AMC/
POSITION DIVISION CONTROL FAULT/ TOTAL Make Remarks Remarks
SECTION Nos Installation Warranty Date Time Date Time

Passenger amenities _ _ _ _ _ _ _ _ NIL NORMAL


Public addressing system _ _ _ _ _ _ _ _ NIL NORMAL
CIB's _ _ _ _ _ _ _ _ NIL NORMAL
TIB's _ _ _ _ _ _ _ _ NIL NORMAL

5. EC SOCKETS TESTING REPORT POSITION - SC DIVISION DATE -2 DATE : 30.10.21

No of sockets Cable
Sec. incharge Total length of Total Tested on No of LC gates No.of EC markers Cable
S.No Section the section in sockets in No of LC tested Sockets REMARKS RCIL Cable exposes Route path
SSE/SE/JE kms section 30.10.21 Available defective available or checked
not
1 TAA-MABD 6 6 6 1 1 NIL SAI, TECH/MABD _ NIL P/A OK
SSE/T/WL
2 YGL-CLE 7.65 8 8 2 2 NIL TECH/YGL - NIL YES OK
3 RGP-IPG 9 10 10 3 3 NIL RAJUNAIK, TECH/RGP _ NIL P/A OK
4 SSE/T/BG ZN-RGP 12.75 16 16 1 1 NIL PARAMESHWAR, SR.TECH VEERANNA NIL YES OK
5 ALER-PBP 9 10 10 3 3 NIL TECH/ALER RAVIKIRAN NIL YES OK
6 PPY-MLMG 6 6 6 1 1 NIL RAMYA, TECH/KMT KHASIM NIL YES OK
7 KRA-CMW 15 15 10 5 5 NIL JE/T/DKJ, TECH/DKJ - NIL YES OK
SSE/T/KMT
8 KMT-PNDP 10 11 11 1 1 NIL CHOWDARY, TECH/KMT - NIL YES OK
9 GUU-DKJ 13 13 13 3 3 NIL KISHORE, TECH/DKJ ISHAQ NIL YES OK
10 JOA-LTRR 12 12 5 - - NIL ASHANK, TECH/PRLI - NIL YES OK
11 SSE/T/UDGR GTU-PRLI 24 23 15 1 1 NIL NISHANTH, TECH/PRLI - NIL YES OK
12 BHLK-KCP 14 14 8 1 1 NIL ANAND, TECH/BHLK - NIL YES OK
13 JPTN-JPTN 'B 4 3 3 - - NIL DURGAPRASAD, TECH/JPTN - NIL YES OK
SSE/T/MDR
14 MTMI-MACU 10 10 9 - - NIL TECH/MTMI - NIL YES OK
15 SSE/T/BIDR KMPU-KUKT 16 16 6 - - NIL JE/T/HMBD, TECH/KUKT - NIL P/A OK
16 SSE/T/N/KZJ KOLR-PTKP 10 9 9 3 3 NIL SURESH, TECH/PDPL VENKATESH NIL N/A OK
17 SSE/T/BIDR MRF-SSPD 13.42 13 6 1 1 NIL TECH/SSPD - NIL YES OK
18 SSE/T/BDCR BDCR-BTPD 10 12 12 1 1 NIL VENKATESH, TECH/BDCR - NIL P/A OK
19 SSE/T/CR/KZJ KZJ-PQL 9 8 8 3 3 NIL SSE/T/C/KZJ, TECH/KZJ - NIL YES OK
TOTAL 215 171

M.Praveen Kumar
JE/T/TR/SC
5 .BSNL 64KBPS channels DATE: - 30.10.2021
Tested BY
SL NO CHANNELS No of CHANNELS REMARKS
General Shift Night Shift
1 SC-KDM 1
2 SC-BIDR 1
3 SC-BDCR 1
4 SC-MDR 1
5 SC-PRLI 1
6 SC-YP 1 Lakshmi Anil Kumar
Tech/TR/SC TECH/TR/SC
Working normal
7 SC-BKL 1
8 SC-KRA 1
9 SC-WL 1
10 SC-JPTN 1
11 SC-UDGR 1
TOTAL 11
6. BSNL 2MBPS Protection channels :SC DIVISION
1 SC-KMT 1
2 SC-GDCR 1
3 SC-KZJ 1
4 SC-MUGR 1
5 SC-HMBD 1
6 SC-BPA 1 Lakshmi Anil Kumar
Tech/TR/SC TECH/TR/SC
Working normal
7 SC-BG 1
8 SC-MRTD 1
9 SC-VKB 1
10 SC-WD 1
TOTAL 10
7. RCIL 2MB protection path
CONTR
OL TIME OF STAFF AT TEST STAFF AT
CIRCUIT ID STATUS
SECTI TESTING ROOM RAILTEL/ NMS
ON

SC:TJ-II N5:2/5,SKP: 2/5 :VKB:2/1- WD:2/1, SC:TJ-II N1


CTO-1 WORKING E1
6/21-VKB:3/1
OK
SKP-WD VKB-
PRLI,
PROTECTION E1 WD:2/2-SC:TJ-II N5 2/6 SC:TJ-II N2 6/1-PRLI: FC:3/2 OK

CTO-2 WORKING E1 SC: N4 5/7,SKP 2/1:SC:TJ-II N4 5/7,ZN:FC 3/1 OK


SKP-SC-ZN
PROTECTION E1 1.SKP-SC SKP: 2/2, SC TJ-II N6:2/2, OK

SC-ZN- KZJ :SC:TJ-II 6/19,ZN: 3/14, KZJ:2/7:SC-KZJ-


ZN-KZJ-DKJ,
PTKP:SC:TJ-I N5 2/17, KZJ:2/14
CTO-3 KZJ- WORKING E1
PTKP:3/18:SC-KZJ-DKJ:SC: TJ-
OK
PTKP
I6/19,KZJ:15(WRI), DKJ:3/1

KZJ-SC :KZJ:2/6,SC:TJ-II 6/22, PTKP-SC :PTKP:3/11,


ZN-KZJ DKJ-
CTO-3
PTKP
PROTECTION E1 SC:TJ-I 6/5 OK
DKJ-SC :DKJ:3/15,SC:TJ-I 6/8
20.30hrs to Anil Kumar NMS/ Bhanu
23.30hrs TECH/T/TR/SC
PTKP-BPA SC-PTKP-BPA SC:TJ-II 6/16,PTKP: 3/10, BPA:2/11
CTO-4
PDPL-NZB
WORKING E1
SC-PDPL-NZB SC: N2 6/16 PDPL:3/7 NZB:2/3
OK

BPA-SC: BPA:2/13,SC:TJ-II N5 2/11


PROTECTION E1
NZB-SC: NZB:2/14, SC: STM16 5/13
OK

1.SC-BPA-MAGH-BPQ SC: TJ-II N5 2/28 ,BPA:2/3,


BPA-BPQ
CTO-5
MAGH-GDCR
WORKING E1 MAGH:2/11,BPQ:3/16 OK
2 SC:N2 3/8, MAGH:3/13-GDCR:5/1

1 BPQ-SC: BPQ: 3/19 ,SC:TJ-II N5 2/13


PROTECTION E1
2 SC-GDCR -BSNL
OK

DKJ-KI, SC-DKJ-KI :SC:TJ-II N2 6/10, DKJ: 2/18, KI:3/1:SC :TJ-II


CTO-6
DKJ-MUGR
WORKING E1
6/9 DKJ:2/13-MUGR:6/1 OK

1) BZA-SC BZA:3/2:SC TJ-II STM-16:5/20


PROTECTION E1
2) MUGR-SC--BSNL
OK

M.Praveen
Kumar
JE/T/TR/SC
08.TELECOM FAILURE POSITION DATE : - 30.10.2021
Failures reported to HQ-00, U/U reported to HQ- 00.
Sl Control Station / Circuit Action taken by Testroom staff Action taken by Section staff Time of Time
no. jurisdiction section faulty occurrence Rectified
1 CTO -1,2,3,4,5,6 _ _ NORMAL _ _
2 RC _ _ NORMAL _ _
3 TPC _ _ NORMAL _ _
4 LC Gate Phones _ _ NORMAL _ _
5 BLOCK _ _ NORMAL _ _
6 BPAC _ _ NORMAL _ _
CTO-3&4 (SC-KZJ-- Autoprotection Observed CTO-3&4 (Sc-KZJ-PTKP-BPA) autoprotection path failed. Informed NMS/RCIL and complaint booked, 10.30hrs of
7 PTKP-BPA) path Doc.no.04RLY23102021, 01Rly26102021, 03Rly26102021. 23.10.2021
_
As per NMS/RCIL, OFC maintenace block at MAGH Byp-1 station by FE/RCIL for shifting OFC hut to new
building.Informed SSE/T/SKZR, SSE/T/NW/SC, TPC control, Signal Control/SC. All circuits shifted and found 14.20hrs of 16.00hrs of
8 MAGH BBYP-1 OFC hut shifting working normal. 30.10.2021 30.10.2021
OFC

As per NMS/RCIL, OFC maintenance block at YP station by FE/RCIL for shifting of OFC hut to new building.
Informed SSE/T/MDR, JE/T/MDR, SSE/T/NW/SC, TPC control, Signal control/SC. All circuits shifted and found 18.15hrs of 20.45hrs of
9 YP OFC hut shifting working normal. 30.10.21 30.10.2021

10 6Quad _ _ NORMAL _ _
11 Group phone _ _ NORMAL _ _
12 IB Phone _ _ NORMAL _ _
13 Hotline _ _ NORMAL _ _
14 AXLE COUNTER _ _ NORMAL _ _
15 VHF Communication _ _ NORMAL _ _
16 GSM Communication _ _ NORMAL _ _
17 OFC huts( J/I ) NIL
18 BSNL 2Mbps channels _ _ NORMAL _ _
SC-KDM (Ckt ID: 1000017340) BSNL 64kbps channel failed. Informed SSE/T/WL.. DOC.No 1053717726 Complaint 21.30hrs of
19 SC-KDM given again on 21.05.21. Complaint no : 1053717726 11.05.21 _

SC-WL(Ckt ID: 1000017336) BSNL 64kbps channel failed. Informed SSE/T/WL. Complaint booked to BSNL, 11.00hrs of
20 SC-WL
Doc.no.1054220495 03.07.21
_
BSNL 64Kbps channels BSNL 64Kbps
channels SC-JPTN(Ckt ID: 1000017339) BSNL 64kbps channel failed. Informed SSE/T/MDR. Complaint booked to BSNL, 13.10hrs of
21 SC-JPTN Doc.no.1055373334. 29.10.21 _

SC-KRA(Ckt ID: 1000017338) BSNL 64kbps channel failed. Informed SSE/T/KMT. Complaint booked to BSNL, 13.10hrs of
22 SC-KRA Doc.no.1055373335. 29.10.21 _

MKDI BSNL phone not working due to Non-payment of Bills. Letter given to Sr.DOM regarding non-payment of 10.00hrs of
23 MKDI
bills. On 27.08.20, Letter given to Sr.DOM regarding Non payment of Bills. 22.06.20
_

17.00hrs of
24 VHGN As per SSE/T/SKZR BSNL Phone at VHGN-9403410250 signal strength is very poor. 23.12.20 _

17.40hrs of
25 BDCR BDCR BSNL phone not working disconnected due to non paymnet of bills BSNL NO- 08744-242682
07.10.20
_

17.00hrs of
26 SRUR As per SSE/T/SKZR at SRUR station BSNL phone-08738-247239 not working. Infd to BSNL staff
20.01.21
_

As per Dy.SS/LGD, BSNL phone at LGD station not working. Informed SSE/T/BD/SC, SSE/T/EXCH/SC. As per 09.30hrs of
27 LGD
SSE/T/EXCH there is no feasibility in cable, hence FCT to be provided. Same informed SSE/T/BD/SC. 19.12.20
_

As per JE/T/BIDR, HBU, KCP BSNL phones not working due to BSNL cable cuts . Informed BSNL JTO/BHLK, 13.00hrs of
28 HBU,KCP JTO/KMNR for early restoration. On 02.04.21, a/c message given by Dy.SS/HBU regarding HBU BSNL phone failure. 23.01.21 _

14.00hrs of
29 MDR stn As per JE/T/MDR, MDR stn BSNL phone-(08749-274229) not working, due to non payment of bills. 20.02.21 _
BSNL phones BSNL phone
22.00hrs of
30 PRLI As per COMM/Control at PRLI booking office BSNL Phone not working ,due to non payment of bills 20.02.21 _

As per JE/T/JMKT, at KZJ'E' Cabin BSNL phone not working. Informed BSNL Staff and complaint booked. As per 08.30hrs of
31 KZJ'E'
them, BSNL Cable cut. 28.02.21
_

19.00hrs of
32 UDGR,LTRR,PNF As per SSE/T/UDGR at UDGR,LTRR,PNF stations BSNL Phone not working due to non payment of bills
17.05.21
_

As per SSE/T/UDGR, at HER station BSNL Phone not working due to BSNL cable problem. As per BSNL staff, not 19.00hrs of
33 HER
feasible to attend the cable problem. 17.05.21
_

As per TECH/KZJ RLY hospital injection room BSNL no--0870-2546124 N/W due to non payment of bills. 20.00hrs of
34 KZJ RLY hospital
29.05.2021
_

As per Tech/MABD, at MABD station BSNL enquiry phone not working due to non payment of Bills. 13.30hrs of
35 MABD 14.07.21 _
As per JE/T/MABD, at NKD station BSNL enquiry phone no.08718-221290 not working due to non payment of Bills. 19.00hrs of
36 NKD 22.09.21 _

As per JE/T/BPA CUG NO-7815915262 of MMZ stn not working. Telephone instrument problem. Same infd to 18.00hrs of
37 MMZ CUG PHONE
SSE/T/Stores 12.09.21
_

As per JE/T/BPA CUG NO-6281977106 of RLW stn not working. Telephone instrument problem. Same infd to 18.00hrs of
38 RLW CUG PHONE SSE/T/Stores 12.09.21 _
CUG Phone
12.40hrs of
39 JMKT CUG PHONE As per JE/T/JMKT, At KMTP CUG phone now not workng. 14.09.21 _
As per Dy.SS/CKX, At CKX stn CUG Phone not working. Same informed to JE/T/PRLI. As per him Instrument 09.50hrs of
40 CKX CUG PHONE Problem. 22.09.21 _
41 CMS/PAM/COIS/FOIS _ _ NORMAL _ _
42 Data logger/COA _ _ NORMAL _ _
43 RAILNET/Wi-Fi _ _ NORMAL _ _
44 Disaster management _ _ NORMAL _ _
45 Auto Phones _ _ NORMAL _ _
46 Battery Retentivity
Note: New PUCOM mux commissioned at Testroom/SC, BDCR'A cabin, Koyagudem. 3 stations connected through NMS & CTO,TPC,RC,EC,H/L phones,Datalogger circuits made through and found working normal.

M.Praveen Kumar
JE/T/TR/SC
10. EC Faulty section details Date: 30.10.21
Section Date of Faulty Total Kms of
Sl. no Faulty Sec. T/J's done P/J's done L/I Cleared Remarks INFD TO
SSE/SE Failure Quad/ckt section
1 19.04.20 TDU-MVH EC quad __ __ __ __ Heavy Noise
2 24.11.20 VKB-GDQ EC quad __ __ __ __ Heavy Noise
SSE/T/VKB SSE/T/VKB
3 24.09.21 CT-SUH EC quad __ __ __ __ Heavy Noise
4 24.09.21 CTF-VKB EC quad __ __ __ __ Heavy Noise
5 SSE/T/BIDR 17.09.21 KCP-KMNR EC quad __ __ __ __ Heavy Noise SSE/T/BIDR
6 17.09.21 SC RRI-MLY EC quad __ __ __ __ Heavy Noise
7 SSE/T/BD/SC 02.12.20 HYB-HSJ EC quad __ __ __ __ Heavy Noise SSE/T/BD/SC
8 08.07.21 MLYÇ'-MLY'G EC quad __ __ __ __ Heavy Noise
9 SSE/T/SNF 18.10.21 HFZ-LPI EC quad __ __ __ __ Heavy Noise SSE/T/SNF
10 17.09.21 BN-PGDP EC quad __ __ __ __ Heavy Noise
11 17.09.21 ALER-WP EC quad __ __ __ __ Heavy Noise
SSE/T/BG SSE/T/BG
12 04.10.21 GT-BN EC quad __ __ __ __ Heavy Noise
13 04.10.21 ALER-PBP EC quad __ __ __ __ Heavy Noise
14 27.07.21 IPG-GNP EC quad __ __ __ __ Heavy Noise
SSE/T/C/KZJ SSE/T/C/KZJ
15 19.10.21 GNP-NSKL EC quad __ __ __ __ Heavy Noise
16 17.09.21 PPZ-MCI EC quad __ __ __ __ Heavy Noise SSE/T/BPA
17 07.10.20 MCI-MMZ EC quad __ __ __ __ Heavy Noise SSE/T/BPA
18 01.08.21 BPA-RECH EC quad __ __ __ __ Heavy Noise SSE/T/BPA
19 01.08.21 RECH-RLW EC quad __ __ __ __ Heavy Noise SSE/T/BPA
SSE/T/BPA
20 01.08.21 RLW-ASAF EC quad __ __ __ __ Heavy Noise SSE/T/BPA
21 27.07.21 RGPM-RDM EC quad __ __ __ __ Heavy Noise SSE/T/BPA
22 18.08.21 RDM-PPZ EC quad __ __ __ __ Heavy Noise SSE/T/BPA
23 18.08.21 MMZ-BPA EC quad __ __ __ __ Heavy Noise SSE/T/BPA
24 09.02.21 KZJ-WL EC quad __ __ __ __ Heavy Noise
25 09.11.20 WL-CLE EC quad __ __ __ __ Heavy Noise
26 09.11.20 CLE-YGL EC quad __ __ __ __ Heavy Noise
SSE/T/WL SSE/T/WL
27 28.06.21 NKD-YGL EC quad km.no.403/2-4 Joint opened on
28 27.07.21 INK-KDM EC quad - - - - 29.06.21
Heavy Noise
29 27.07.21 TAA-MABD EC quad - - - - Heavy Noise
30 KRMR-GDRA EC quad __ __ __ __ Heavy Noise
31 GDRA-LPJL EC quad __ __ __ Heavy Noise
32 LPJL-KRLA EC quad __ __ __ __ Heavy Noise
33 SSE/T/KRMR 07.10.20 KRLA-MTPI EC quad __ __ __ __ Heavy Noise SSE/T/KRMR
34 MTPI-MRTD EC quad __ __ __ __ Heavy Noise
35 MRTD-ARMU EC quad __ __ __ __ Heavy Noise
36 ARMU-NZB EC quad __ __ __ __ Heavy Noise
37 17.09.21 TPY-BTPD EC quad __ __ __ __ Heavy Noise
38 09.02.21 CMW-TPY EC quad __ __ __ __ Heavy Noise
SSE/T/BDCR SSE/T/BDCR
39 06.10.21 MUGR-CSPS EC quad __ __ __ __ Heavy Noise
40 17.09.21 MUGR-AWM EC quad __ __ __ __ Heavy Noise
41 27.07.21 HSP-OPL EC quad __ __ __ __ Heavy Noise
42 SSE/T/N/KZJ 27.07.21 JMKT-BGSF EC quad __ __ __ __ Heavy Noise SSE/T/N/KZJ
43 17.09.21 RGPM-RDM EC quad __ __ __ __ Heavy Noise
44 04.08.21 CKN-BKL EC quad __ __ __ __ Heavy Noise
45 04.08.21 YP-GNN EC quad __ __ __ __ Heavy Noise
SSE/T/MDR SSE/T/MDR
46 17.09.21 MAPA-JPTN EC quad __ __ __ __ Heavy Noise
47 17.09.21 BKL-MTMI EC quad __ __ __ __ Heavy Noise
48 07.09.21 BY pass-II-RJRT EC quad __ __ __ __ Heavy Noise
SSE/T/SKZR SSE/T/SKZR
49 07.09.21 PRPI-MCW EC quad __ __ __ __ Heavy Noise

TOTAL Monthly Summary


TOTAL NO OF NO OF
Date POSTS SOCKETS
TESTED Month No of POSTS Sockets Tested

01.10.2021 15 15 JANUARY 4802 4055


02.10.2021 34 34 FEBRUARY 0 0
03.10.2021 125 96 MARCH 5225 4493
04.10.2021 195 172 APRIL 5294 4292
05.10.2021 229 177 MAY 4880 4145
06.10.2021 182 151 JUNE 4605 3993
07.10.2021 163 147 JULY 5356 4573
08.10.2021 251 221 AUGUST 5149 4330
09.10.2021 201 176 SEPTEMBER 5127 4378
10.10.2021 214 193 OCTOBER
11.10.2021 120 102 NOVEMBER
12.10.2021 173 114 DECEMBER
13.10.2021 122 105
14.10.2021 126 105
15.10.2021 32 17
16.10.2021 240 202
17.10.2021 159 144
18.10.2021 183 136
19.10.2021 380 310
20.10.2021 370 322
21.10.2021 134 116
22.10.2021 93 79
23.10.2021 190 167
24.10.2021 115 109
25.10.2021 207 174
26.10.2021 183 150
27.10.2021 217 200
28.10.2021 165 149
29.10.2021 286 254
30.10.2021 215 171

Total 5319 4508

12. Help line no's tested at concerned station's


DATE OF TESTING DATE OF TESTING
SL. NO LOCATION BSNL NO. RLY.NO Remarks
1st fortnight TESTED BY 2nd fornight TESTED BY
BSNL Phone not working due to
1 PARLI 02446-222800 81921
non payment of bills
2 BIDR 08482-226329 81806 NIL
3 VKB 08416-252013 81027 13.10.21 SSE/T/VKB 24.10.21 TECH/VKB NIL
4 TDU 08411-272010 81019 NIL
5 MQR 08441 - 287499 81182 NIL
86739, 86170 ,
6 SC 040-27700868 86140 NIL

7 HYB 040-23200865 81500 NIL


8 BMT 040-27765898 81244 NIL

9 KZJ 0870-2576430/226 82660 20.10.21 TECH/KZJ BSNL Phone N/W. Due to non
payment of bills

10 WL 0870-2426232 82751 17.10.21 Sr.TECH/WL NIL


22.10.21

11 MABD 08719-240038 82980 BSNL Phone N/W. Due to non


payment of bills
12 DKJ 8790994074 80742 NIL
13 KMT 08742-256025 82984 NIL

14 MDR 08749-274229 80940 11.10.21 Tech/MDR 29.10.21 TECH/MDR BSNL Phone N/W. Due to non
payment of bills
BSNL Phone N/W. Due to non
15 BDCR 08744-242682 80633 08.10.21 TECH/BDCR 24.10.21 TECH/BDCR payment of bills

16 PDPL 08728-222046 82931 NIL M.Praveen


Kumar
BSNL Phone N/W. Due to non
17 RDM 08728-255107 80480 07.10.21 Tech/RDM
payment of bills JE/T/TR/SC
18 MCI 08736-250081 80550 16.10.21 JE/T/RDM 26.10.21 TECH/MCI NIL
19 BPA 08735-222064 80280 NIL
20 SKZR 08738-235161 80132 NIL
21 BG 08685-242534 82816
13.FOIS summary Date:-30.10.2021
No of Locations Total No. of BSNL Total No of Total No of RCIL 64 Kbps Total No.of RCIL 2Mbps
64 kbps BSNL 2mbps
72 71 9 5 41

Sl. FOIS Location Channel failures Date/Time of Reason Remarks Date/ Time
no Up/down failure of RT
INFORMED SSE/T/KMT
15.30HRS BSNL channel down. CKT ID(1000469634)COMPLAINT
1 UP SPSG-DKJ
06.09.2023 BOOKED DOC.NO.1055027918

12.30HRS Informed SSE/T/C/KZJ


2 UP FKSG-OPL Local leads problem at FKSG End _
05.05.21

FCIJ-PDPL Channel down. Due to modems faulty at


12.00hrs of
3 FCIJ-PDPL PDPL. MODEM replaced at PDPL,ROUTER AT FCIJ END Informed SSE/T/N/KZJ. _
04.05.21
DN PROBLEM(Not getting ON)

12.00hrs of Informed to BSNL staff. Local leads problem at KZJ


4 FCIJ-KZJ 04.05.21 ROUTER AT FCIJ END PROBLEM(Not getting ON) _

11.00 OF
5 UP SKP-MPCT 11.06.2021 Channel down. Informed SSE/T/VKB. Infd to JTO/TDU _

09.00hrs of
7 UP SC-BPA
26.10.21 SC-BPA Channel down. Informed SSE/T/BPA _

10 UP SPSG-DKJ
16.00hrs of SPSG-DKJ Channel down. SPSG-BSNL (ckt id : 1000469634) Doc.no.1055312643. Informed
_
26.10.21 SSE/T/KMT.

M.Praveen Kumar
JE/T/TR/SC
14. Joint inspection of EC sockets
Sl. by Telecom staff along with RCIL staff Date:-30.10.2021
SECTION BLOCK RAILWAY RCIL REM
DATE
INCHARGE SECTION STAFF STAFF ARKS
N
1
o 02.10.21 MABD-TAA TECH/MABD ISHAQ NIL
2 04.10.21 TAA-KDM TECHMABD ISHAQ NIL
3 08.10.21 INK-KDM TECH/KDM ISHAQ NIL
4 13.10.21 TAA-MABD TECH/MABD ISHAQ NIL
5 14.10.21 TAA-MABD JE/T/MABD ISHAQ NIL
SSE/T/WL
6 16.10.21 KDM-INK TECH/KDM ISHAQ NIL
7 20.10.21 YGL-CLE
RAJESWARI, TECH/YGL
RAMESH NIL
8 22.10.21 KDM-INK TECH/KDM RAMESH NIL
9 27.10.21 KAM-TAA
RAMESH, SR.TECH/KDM
ISHAQ NIL
10 28.10.21 YGL-NKD TECH/NKD RAMESH NIL
11 03.10.21 RMY-TDU TECH/TDU SANGAREDDY NIL
12 05.10.21VKB-GDQ DN TECH/VKB PRAVEEN NIL
13 05.10.21 TDU-MVH TECH/NAW SANGAREDDY NIL
14 06.10.21 CTF-VKB Tech/VKB Prem NIL
15 16.10.21 GGD-CTF Tech/VKB Prem NIL
16 SSE/T/VKB 19.10.21 CTF-VKB TECH/VKB Prem NIL
17 19.10.21 VKB-SSPD TECH/VKB Praveen NIL
18 19.10.21 KQT-SEM TECH/SEM RCIL NIL
19 22.10.21 TDU-MVH Tech/NAW SANGAREDDY NIL
20 28.10.21 TDU-RMY TECH/TDU ANANTH NIL
21 29.10.21 DRR-RMY TECH/TDU Ananth Reddy NIL
22 03.10.21 BKL-CKN TECH/BKL SUDHAKAR NIL
23 04.10.21MTMI-MAPA SSE/T/MDR GOPI NIL
24 04.10.21 YP-GNN UP TECHYP SRINIVAS NIL
25 05.10.21MAPA-JPTN TECH/JPTN GOPI NIL
26 05.10.21 MTMI-MDR TECH/MTMI SUDHAKAR NIL
27 06.10.21MTMP-MACU Tech/MACU GOPI NIL
28 SSE/T/MDR 06.10.21 BKL-MTMI Tech/BKL SUDHAKAR NIL
29 09.10.21RRPM-JPTN TECH/JPTN GOPI NIL
30 18.10.21MACU-RRPM TECH/MTMP GOPI NIL
31 20.10.21 TNGM-YP
BALASWAMY, SR.TECH/MDR
SRINIVAS NIL
32 20.10.21 BKL-MTMI
UMARANI, TECH/BKL
SUDHAKAR NIL
33 23.10.21 GNN-CVVBASHA/TECH/GNNSRINIVAS NIL
34 28.10.21 YP-GNN UP TECH/YP SRINIVAS NIL
35 04.10.21 SNF-HSJ TECH/SNF HOMYA NIL
SSE/T/SNF
36 04.10.21 TLPR-LPI TECH/LPI PREM NIL
37 04.10.21 PCZ-KRA TECH/DKJ KASEEM NIL
38 06.10.21 PNDP-CKN Tech/KMT SUDHAKAR NIL
39 07.10.21 KRA-SYI
MANIKYAM, TECH/DKJ
RAMULU NIL
40 07.10.21 KMT-PNDP
CHOWDARY, SR.TECH/KMT
SUDHAKAR NIL
41 08.10.21 DKJ-PCZ TECH/DKJ KHASHIM NIL
42 09.10.21 GUU-MABD Tech/DKJ ISHAQ NIL
43 09.10.21MLMG-KMT Tech/KMT KHASHIM NIL
SSE/T/KMT
44 10.10.21 DKJ-GUU TECH/DKJ Ishaq NIL
45 14.10.21 KRA-CMW TECH/DKJ RAMULU NIL
46 19.10.21 PPY-DKJ TECH/DKJ Kasim NIL
47 20.10.21KMT-MLMG SSE/T/KMT AMARNATH NIL
48 23.10.21 MABD-GUU TECH/DKJ Ishaq NIL
49 30.10.21PPY-MLMG
RAJUNAIK, TECH/RGP
KHASIM NIL
50 30.10.21 GUU-DKJ
KISHORE, TECH/DKJISHAQ NIL
51 04.10.21 RLW-ASAF TECH/BPA SRINIVAS NIL
52 16.10.21 MCI-MMZ JE/T/RDM SRINIVAS NIL
SSE/T/BPA
53 25.10.21 MCI-PPZ TECH/RDM SRINIVAS NIL
54 26.10.21RDM-RGPM TECH/RDM RAJESH NIL
55 04.10.21 SC-MLY TECH/LGD NIRJANAN NIL
56 SSE/T/BD/SC 20.10.21 MLY-CHZ
SANDHYA, TECH/MLY
NIRJANAN NIL
57 25.10.21AMQ-MLY C TECH/AMQ NAVEEN NIL
58 05.10.21MAGH-VHGN TECH/MAGH AJAY NIL
59 05.10.21SRUR-MKDI TECH/SRUR RCIL STAFF NIL
60 08.10.21MAGH-RJUA TECH/MAGH AJAY NIL
61 09.10.21 RJUA-PRPI TECH/MAGH AJAY NIL
62 10.10.21 MAGH-BPQ Sr.TECH/MAGH AJAY NIL
63 16.10.21 SKZR-VEM TECH/SKZR SHANKAR NIL
64 SSE/T/SKZR 19.10.21MAGH-VHGN TECH/MAGH Ajay Kumar NIL
65 20.10.21 MCW-PRPI TECH/GDCR AJAY NIL
66 24.10.21MAGH-RJUA TECH/MAGH AJAY NIL
67 26.10.21GDCR-MCW TECH/GDCR AJAY NIL
68 27.10.21MAGH-VHGN
SUNNY, TECH/MAGH AJAY NIL
69 28.10.21WIRR-VHGN TECH/GDCR AJAY NIL
70 29.10.21 VEM-SRUR TECh/SKZR Shanker NIL
71 05.10.21BDCR-BTPD TECH/BDCR RAMULU NIL
72 06.10.21 PGP-AWM Tech/MUGR Mohan NIL
73 08.10.21 GLE-PGP TECH/BDCR MOHAN NIL
74 16.10.21 BDCR-GLE TECH/BDCR MOHAN NIL
SSE/T/BDCR
75 19.10.21 TPY-BTPD TECH/BDCR Ramulu NIL
76 20.10.21 PGP-AWM TECH/BDCR MOHAN NIL
77 20.10.21 CMW-TPY TECH/BDCR RAMULU NIL
78 28.10.21 BDCR-GLE TECH/BDCR MOHAN NIL
79 08.10.21 JMKT-BGSF JE/T/JMKT VEKNKAT NIL
80 08.10.21 KZJ-PQL Sr.Tech/KZJ VEERANNA NIL
81 10.10.21 RGP-IPG TECH/RGP Veerana NIL
SSE/T/C/KZJ
82 18.10.21 NSKL-PQL TECH/NSKL VEERANNA NIL
83 20.10.21 KZJ-PQL TECH/KZJ VEERANNA NIL
84 29.10.21 NSKL-GNP TECH/KZJ Veeranan NIL
85 09.10.21 PBP-ZN JE/T/BG Ravi NIL
86 09.10.21 PGDP-BG Tech/ZN NIRJANAN NIL
87 19.10.21 ALER-PBP TECH/RGP Ravikiran NIL
88 27.10.21 BG-WP JE/T/BG, TECH/BGRavikiran NIL
SSE/T/BG
89 28.10.21 BN-PGDP TECH/BG NIRJANAN NIL
90 28.10.21 LA-WP TECH/LA RAVI NIL
91 30.10.21 LA-PBP
PURUSOTHAM, TCM/LA
RAVIKIRAN NIL
92 30.10.21 ZN-RGP
PARAMESH, SR.TECH/ZN
VEERANNA NIL
93 18.10.21 KZJ-KMTP TECH/KZJ SAI NIL
94 19.10.21 OPL-HSP Sr.TECH/KZJ Sai NIL
95 19.10.21KYOP-KOLR TECH/PDPL RCIL NIL
96 23.10.21 PDPL-STBD JE/T/PDPL RAJESH NIL
SSE/T/N/KZ
97 J 25.10.21PDPL-RGPM TECH/PDPL RAJESH NIL
98 28.10.21 KMTP-HSP TECH/KZJ SAI NIL
99 29.10.21 PTKP-BGSF TECH/JMKT Venkatesh NIL
### 30.10.21KOLR-PTKP
SURESH, TECH/PDPL
VENKATESH NIL
M.Prave
en
Kumar
JE/T/TR/S
C
Quad no. Contract
Block
Having Insulation value Agency
Sl. Section Date of
Officer SSE/T BLOCK Section insulation in Mohms 6Q/4Q Circuit Target date Name REMARKS
no length in Meggering
less than < <10 MΩ (Mobile
Kms
10 Mohms number)
Work under progress as per SSE/T/C/KZJ as on 14.06.21 As on 15.09.21, as per SSE/T/C/KZJ work under progress,
1 C/KZJ PQL-NSKL 6.13 1,4,6 02.04.21 1M 6Q 25.06.21 4.5km cable laying done. As on 29.10.21, as per SSE/T/C/KZJ, work under progress.

ADSTE/KZJ As per JE/T/BG, 03No's of cable joints operated for Tele 6Qd cable between GT-BN section for L/I at Km.no.217/32-34,
2 BG GT-BN 11 1-May 11.08.21 6Q 217/6-8 & 216/6-8. Cable fault found towards GT side 02Kms. Further localisation work under progress. As on
29.10.21 500mtrs trench work under progress

Cut & damaged by Engg Contractor at KM.No 308/13 & 309/19. Cable to be laid by S&T cnstruction.As on 13.10.19,
cable laying Completed, LBs to be erected. As per SSE/T/N/KZJ on02.03.2020, UP line side cable shifted to DN line
side,Location box errection and Termination work progress from S&T construction. 02kms cable to be replaced. As per
3 PTKP-KOLR 9 3,6/1 20.12.19 5,5 6Q EC,DM 30.06.21 SSE/T/N/KZJ on 25.05.21. 02 NO's of T/J in section. As on 14.06.21 work under progress as on 14.06.21. As on
29.10.21, as per JE/T/PDPL work not started.
N/KZJ
As per JE/T/PDPL on 08.03.21, At kmno:-301/21-23 to 302/14-16 showing fault. As per SSE/T/N/KZJ on 25.05.21. 02
4 KOLR-PDPL(IB) 25.01.19 IB 31.07.21 NO's of T/J in section. As on 29.10.21, as per SSE/T/N/KZJ work under progress.
As per SSE/T/N/KZJ Work be started.As on 04.07.21 work will start in next week. As on 29.10.21, as per SSE/T/N/KZJ
5 DSTE/KZJ OPL-HSP 13.02.20 6Q work under progress.

6 WL-CLE 1,2,5,6 25.03.21 6Q 30.06.21 As on 24.10.21, as per SSE/T/WL work under progress, cable laying done. Terminations pending.
As per SSE/T/WL as on 14.06.21 due to no response from zonal contractor work not yet started. On 28.06.21 Joint
7 CLE-YGL 3 25.03.21 6Q 30.06.21 opened at km no ,394/1. As on 11.10.21, as per SSE/T/WL work under progress. As on 29.10.21, Shifting work
S/WL proposed.
8 TAA-KDM 5,6 04.03.21 6Q As on 29.10.21, as per SSE/T/WL-II, 3Joints opened.
As on 24.10.21, as per SSE/T/WL work under progress. Water stagnated due to lakes overflow, after water
9 TAA-MABD 1 10.03.21 6Q 30.06.21 clearance it will be attended.
10 BPA RDM-RGPM 10 1,3 27.11.18 6,7 6Q (T) Spare & EC 30.06.21 As per SSE/T/BPA as on 29.10.21 work under progress.
ADSTE/BPA As per SSE/T/SKZR on 03.06.21, shifted 360mts of 6-Quad cable between SKZR-VEM section in view of low insullation
11 SKZR VEM-SRUR 10 2,5 28.02.21 from 194/16 to 194/28. As per SSE/T/SKZR as on 29.10.21 work under progress.
12 SSPD-MRF 26.09.20 As per SSE/T/BIDR as on 29.10.21 work not started.
13 BIDR KOHR-ZB 13.02.21 As per SSE/T/BIDR as on 29.10.21 work not started.
14 ADSTE/VKB MTV-BIDR 18 14.11.20 As per SSE/T/BIDR as on 29.10.21 work not started.
15 SEM-MQR
VKB As per SSE/T/VKB as on 29.10.21, work not yet started due to rains. Contractor not responding.
16 MQR-CT
17 BDCR AWM-MUGR As per SSE/T/BDCR as on 29.10.21 work under progress
18 GUU-MABD Q2,Q5 19.03.21 10M 6Q 14.06.21 As per SSE/T/KMT as on 29.10.21 4pits opened, work under progress.
As per SSE/T/DKJ/KMT on 14.06.21, 01No T/J in section work under progress. As per SSE/T/KMT as on 12.10.21 work
DKJ/KMT Block, EC, BPAC, not started. Cable to be diverted, temporarily work stopped due to RUB work. As on 29.10.21, half section completed
19 ADSTE/KMT KMT-MLMG 9.5 All Quads 12.02.21 <10M 6Q 14.06.21
LC

As per SSE/T/MDR on 25.05.21, 02 No's of T/J's in section. As per SSE/T/MDR as on 12.10.21 work not started. As on
20 MDR TNGM-MDR 25.10.21, 4 no of joints opened for L/I , testing work under progress.
JIO signal Failures Dt: - 30.10.2021
IN-Time RT-Time
DIV/ Complaint received
2 Location RM Fault REMARKS
Unit from JIO no. DATE DATE
NIL

WI-FI working status


Available
Provided
DIV/ population SSE/JE
Date during Failure Station Failure Time Right Time REMARKS
Unit upto Juridiction
19-20
05.02.20
Wifi (TATA TRUST) not working. POA Switch
16.00hrs of faulty. Informed Manager/RCIL & AM/RCIL. As
LPJL SSE/T/KRMR _ per Manager/RCIL will be replaced in a week.
15.01.21

Rail-wire Wi-Fi not working. Informed FE/RCIL.


13.00hrs of As per Manager/RCIL will be replaced in a
GUU SSE/T/DKJ _
07.03.21 week.
08.20hrs of Rail-wire Wi-Fi not working. Informed FE/RCIL.
PBP SSE/T/BG _
11.07.21
15.00hrs of Rail-wire Wi-Fi not working. Informed FE/RCIL.
PNDP SSE/T/KMT _
04.08.21
Rail-wire Wi-Fi not working. Informed FE/RCIL.
14.15hrs of
JOA SSE/T/UDGR _
17.10.21

13.00hrs of Rail-wire Wi-Fi not working. Informed FE/RCIL.


NPL SSE/T/SNF _
04.10.21
18.00hrs of Rail-wire Wi-Fi not working. Informed FE/RCIL.
KRA SSE/T/KMT _
07.10.21
18.00hrs of Rail-wire Wi-Fi not working. Informed FE/RCIL.
PPY SSE/T/KMT _
07.10.21

6-Quad cable fault position


FAULTY SECTION/ IN RT Dept responsible/
Date DIV Section RM Fault REMARKS
STN TIME- DATE TIME-DATE Cause
NIL

COA failure
FAULTY SECTION/ IN RT Dept responsible/
Date DIV Section RM Fault REMARKS
STN TIME- DATE TIME-DATE Cause
NIL
DATE: 30.10.2021

SUPERVISOR SUPERVISOR ACTUAL TECH TECH TECH GRAND PERCENT


SL.NO OFFICER SECTION SE/JE SSE
QUATERLY MONTHLY TOTAL 1ST 2ND 3RD TOTAL AGE

1 JE/T/VKB GGD-TDU(EX) 101 101 92 51 10 254 251.5%


SSE/T/VKB
ASTE/ VKB

2 JE/T/CT TDU-CT-WD 101 102 88 62 54 306 303.0%


3 JE/T/BIDR VKB-KCP 143 87 64 33 8 21 213 149.0%
4 SSE/T/UDGR JE/T/PRLI KCP(EX)-PRLI 119 27 69 82 27 13 218 183.2%
5 JE/T/HMBD KHNP(EX)-SLTP 94 29 42 37 16 124 131.9%
HSJ-HFZ &
6 JE/T/SNF 25 25 43 13 16 97 388.0%
SNF-AMQ(EX)
SSE/T/SNF
ASTE/SC

HFZ-GGD(EX),
7 JE/T/LPI 56 51 51 60 21 15 198 353.6%
TLPR-RBCS(IN)
GT(EX)-HSJ
8 SSE/T/BD/SC 43 32 28 9 28 97 225.6%
SSE/T/BD/SC & MLY-AMQ
9 JE/T/HYB HSJ(IN)-HYB 7 7 7 7 21 300.0%
10 JE/T/BG GT-WP 45 64 44 25 47 15 195 433.3%
ADSTE/

SSE/T/BG
KZJ

11 SE/T/ZN WP(EX)-IPG 57 42 38 23 16 119 208.8%


12 SSE/T/C/KZJ JE/T/C/KZJ KZJ-IPG(EX) 33 25 8 13 25 8 79 239.4%
13 JE/T/JMKT KZJ-BGSF 41 30 17 22 38 107 261.0%
SSE/T/N/KZJ PDPL-STBD-
DSTE/ KZJ

14 JE/T/PDPL 57 48 43 44 69 204 357.9%


BGSF(EX)
15 SE/T/WL KZJ(EX)-NKD(EX) 41 40 60 25 16 9 150 365.9%
SSE/T/S/WL
16 JE/T/MABD NKD(IN)-MABD 30 24 31 30 27 8 120 400.0%
17 SSE/T/KRMR JE/T/KRMR STBD(EX)-NZB 45 0

18 JE/T/RDM RGPM(EX)-MMZ(EX) 34 36 32 18 26 112 329.4%


ADSTE/ BPA

SSE/T/BPA
19 JE/T/BPA MMZ-ASAF(EX) 35 35 18 8 18 79 225.7%
20 SSE/T/SKZR ASAF- WIRR(EX) 56 56 46 22 30 48 202 360.7%
SSE/T/SKZR BPQ-WIRR
21 JE/T/MAGH 55 55 53 52 54 7 221 401.8%
MAGH-GDCR
22 SSE/T/BDCR CMW-MUGR 115 98 110 88 46 342 297.4%
ADSTE/KMT

23 JE/T/MDR CKN-KI 80 88 95 49 19 31 282 352.5%


SSE/T/MDR
24 - MTMI-MACU 51 47 19 51 18 135 264.7%
MABD-MLMG-DKJ-
25 SSE/T/DKJ - 77 74 65 77 10 5 231 300.0%
CMW
26 SSE/T/KMT - MLMG-CKN(EX) 29 48 19 21 11 11 110 379.3%
27 Grand Total 1570 1229 1186 891 569 341 4216 268.5%
% of EC Testing
Derailment On .10.2021
ART/SC Informed to Officer Informed to STAFF
Accident/
Buzzer time Derailment Nature of Unusal
Section/ Time Time Mode of Time Communication provided Communication ART/SC Left ART/SC/Reache
Time Dep Desg Time Infd Desg Name Time Informed Remarks
Station ordered Reached Transport reached Time Removed Time time d Time
S.No SSE/TELE/SECTION WOMEN TECH EC SECTION NO. OF LENGTH OF DATE OF EC TESTING
SOCKETS SECTION

1 TUSHARA TECH-III
SSE/T/BD/SC 01.10.21, 13.10.21,
2 SANDHYA MLY-CHZ 7 6.5
20.10.21.25.10.21
3 CTF-GGD 9 9 04.10.21
4 CTF-VKB 11 12
SSE/T/VKB FARIDA BEGUM TECH-III 05.10.21, 16.10.21
5 VKB-GDQ 8 9
23.10.21 25.10.21
6 MWY-DRR 9 9 07.10.21
7 TPY-CMW 10 10
SSE/T/DKJ SAROJA TECH-I
8 DKJ-PCZ 7 7
9 PPY-MLMG 10 10 30.10.2021
10 SSE/T/KMT RAMYA PNDP-KMT 10 10
11 MLMG-KMT 10 10 09.10.21
12 UMA DEVI/BKL MTMI-MDR 6 5 20.10.21, 27.10.21
SSE/T/MDR (BKL-MTMI)
13 RATNA KUMARI/MDR BKL-CKN 13 13
14 PPZ--MCI 10 10
15 DHANA LAXMI TECH-I/RDM RGPM-RDM 10 9.6
16 RDM-PPZ 5 4.6 09.10.21, 13.10.21
SSE/T/BPA
17 RDM-RGPM 10 10
LAVANYA TECH-I/RDM 04.10.21 MCI-PPZ
18 MMZ-MCI 10 10
25.10.21 PPZ-MCI
19 N. RAMA DEVI TECH/KMTP KMTP-HSP 7 7
20 SSE/T/N/KZJ AKHILA TECH-III/JMKT PDPL-RGPM 7 7
21 N. RAMA DEVI TECH/KMTP KZJ-KMTP 8 10
22 KDM-INK 6 6 16.10.21, 22.10.21
BHAVANI TECH-III/KDM
23 TAA-MABD 6 6
24 BKL-MTMI 12 12
SSE/T/WL UMA DEVI TECH-III/KZJ
25 KZJ-WL 9 10.4 20.10.21
Raja Saritha,
26 Swapna SR.TECH/WL CLE-YGL 8 8 Raja saritha, 20.10.21
27 PRANITHA SR.TECH/KZJ NSKL-PQL 9 9
28 SSE/T/C/KZJ V.RAMA DEVI TECH/GNP GNP-IPG 10 10
29 Swathi TECH/GNP GNP-IPG 10 10
Joint Inspection Of EC Sockets by Telecom Staff along with TRD/OHE Staff Date:- 30.10.2021

No of
Total No.of EC
Section sockets Tested by Telecom
S.no. Section Sockets in Date Sockets Tested by TRD/OHE staff
Incharge tested staff
section defective

1 _ _ _ _ _ NIL _ _
Summary of Section having Quad cable low insulation
Cumulative No.of low Cumulative No.of low
Total No.of
BLOCK No.of Block insulation insulation Block
Sl.No DIVN Sections
sections having low Block sections to be sections attended
insulation attended during during the current
available
current month year

SC 148 28 1 19

6 Quad Cable Low insulation Sections to be attended as on 30.10.21 (FY- 20 - 21)

Target Date
Sl.no Officer SSE/T BLOCK Section Cable Date Identified of Rectified on work done during Last week Zonal contractor
Completion

1 N/KZJ PTKP-KOLR(Te) 6Q(T) 31.10.2021 31.10.2021 to be attended work not started Naga Lakshmi enterprises
2 N/KZJ KOLR-PDPL (IB) 6Q(IB) 01.06.20 31.10.2021 to be attended work not started Naga Lakshmi enterprises

At Km.no.354/1-3 location box


DSTE/KZJ provided and cable to be terminated.
At Km.no.350/1 trench opened for
3 N/KZJ OPL-HSP (Tel) 6Q (T) 13.06.20 31.10.2021 to be attended operation of joint. Due to water Naga Lakshmi enterprises
stagnation unable to operate joint.
Further restoration work under
progress.

At Km.no.276/1-276/25-27 low
insulation cleared, At Km.no.276/25-
4 ADSTE/BPA BPA RDM-RGPM (IB)(9.42km) 6Q (IB) 01.06.20 31.10.2021 to be attended 27 joint operated and low insulation Naga Lakshmi enterprises
cleared. Further restoration work
under progress.

5 SSE/T/BIDR SSPD-MRF 6Q(T) 26.09.20 30.11.2021 to be attended work not started Naga Lakshmi enterprises

6 ADSTE/VKB SSE/T/BIDR KOHR-ZB 6Q(T) 13.02.21 31.10.2021 to be attended work not started Naga Lakshmi enterprises

7 SSE/T/BIDR MTV-BIDR 6Q(T) 25.02.21 31.10.2021 to be attended work not started Naga Lakshmi enterprises