You are on page 1of 1

15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

PIPELINE SCHEMATIC DIAGRAM FOR NORTH EAST GAS GRID PHASE-III OF IGGL REFERENCE DRAWINGS / DOCUMENTS
S.NO. TITLE NO.
K SILIGURI-GANGTOK PIPELINE SECTION (SGPL) 1 PIPELINE ROUTE MAP C221052-SGPL-PP-RM-2001 K

12", 7.14/8.38mm THK. 600# X 195.2 KM (APPROX), API 5L x 70 PSL-2 2 P&ID - SILIGURI C221052-SGPL-PC-PID-1001
INTERMEDIATE PIGGING STATION (IP/SGPL/01)
DISPATCH TERMINAL (DT / SGPL)
CITY: MAYNAGURI SECTION-11 TOWN: LAVA 3 P&ID - SV
C221052-SGPL-PC-PID-1002-06
C221052-SGPL-PC-PID-1008-10
TEHSIL: MAYNAGURI (FOR PART- D1 & D2) TEHSIL: KALIMPONG-1 4 P&ID - RT C221052-SGPL-PC-PID-1011
DISTRICT: JALPAIGURI DISTRICT: KALIMPONG 5 C221052-SGPL-PC-PID-1007
P&ID - IP
STATE: WEST BENGAL STATE: WEST BENGAL
CH: 0+000 CH: 128+000 NOTES:-

MATCH LINE A-A


J PIPELINE NEW ( NOTE-4 ) ( NOTE-4 ) 1. THIS PIPELINE SCHEMATIC HAS BEEN DEVELOPED BASED ON SURVEY J
A/G U/G
(BY OTHERS) (PROJECT SCOPE) PIG LAUNCHER DATA & DFR DOCUMENT PROVIDED BY IGGL.
Ch. 128+000 Km IJ
12" x 12" 2. LOCATION OF INTERMEDIATE PIGGING SATION (IPS), SECTIONALIZE
VALVE (SV) ARE SHOWN TENTATIVE HERE . EXACT LOCATION OF SV &
GOOV-12" IPS SHALL BE FINALIZED AT SITE BASED ON AVAILABILITY OF LAND,
12"
READILY ACCESSIBILITY, TERRAIN FEATURE ETC.
12" GOOV-12"
IP-03 3. BOUNDARY TO BOUNDARY LENGTH HAS BEEN SHOWN IN SCHEMATIC.
KICKER LINE
12"
24" BGPL GAIL PIPELINE

12" 4. FACILITIES SHOWN INSIDE STATIONS ( DT,SV,IP,RT ) ARE TENTATIVE,


P&ID SHALL BE REFER FOR FURTHER DETAIL

FUTURE SCOPE
12"
KOD

METERING
5. FOR FURTHER DETAIL OF ALL TYPES OF CROSSING ALIGNMENT SHEET
12" & SURVEY REPORT SHALL BE REFERRED.
12"

SKID
FUTURE SCOPE
(CH: 359+605)

CH: 104+000 (APPROX)


CH: 56+000 (APPROX)
I 12" 12" I
LEGEND:-

CH: 16+000 (APPROX)

CH: 32+000 (APPROX)

CH: 80+000 (APPROX)


12" METERING
SKID
FUTURE SCOPE : ACTUATED BALL VALVE
KICKER LINE KICKER LINE
: SV STATION
GOOV-12" GOOV-12"
U/G A/G : MANUAL VALVE
IJ IJ
PL / PR : PIG LAUNCHER/RECEIVER H
GOOV-12" 12 x 12" 12" x 12" GOOV-12"
H PIG LAUNCHER PIG RECEIVER : PROPOSED UNDER GROUND (UG) P/L
A/G U/G SV/SGPL/01 SV/SGPL/02 SV/SGPL/03 SV/SGPL/04 SV/SGPL/05
Ch. 0+000 Km Ch. 128+000 Km
: PROPOSED ABOVE GROUND (AG) P/L
NOTE-4
: PROPOSED FUTURE SCOPE
AG : ABOVE GROUND
UG : UNDER GROUND
P/L : PIPELINE
TOP : TAP-OFF POINT
SGPL : SILIGURI-GANGTOK PIPELINE G

CH: 104+000
CH: 59+800
(APPROX)

(APPROX)
G
PIPELINE DETAILS
PIPE SIZE & THK.
S.No. ROUTE DESCRIPTION MATERIAL LENGTH
SPREAD-2A SPREAD-2B SPREAD-2C RATING (mm)
(LENGTH = 59.8KM) (LENGTH = 44.2KM) (LENGTH = 45.4KM) 1. DT TO IPS (LAVA) 12"x600# API 5Lx70 7.14 / 8.38 128.000 KM
PSL-2
PART-C PART-D1 PART-D2 API 5Lx70
2. IPS (LAVA) TO RT (GANGTOK) 12"x600# 7.14 / 8.38 67.236 KM
(BY OTHERS) (CURRENT PROJECT SCOPE) (CURRENT PROJECT SCOPE) PSL-2

F
F

RECEIPT TERMINAL (RT/SGPL)


TOWN: RANIPOOL TOTAL PIPELINE LENGTH - 195+236 KM (APPROX)
TEHSIL: PAKYONG
DISTRICT: EAST DISTRICT
STATE: SIKKIM E
E CH: 195+236KM
PIPELINE SCHEMATIC DIAGRAM FOR PART -D1 & D2
CH: 144+000 (APPROX)

CH: 168+000 (APPROX)

CH: 181+400 (APPROX)


( NOTE-4 )

( SCOPE BATTERY LIMIT SHOWN IN BLUE


COLOUR FOR PART-D1 & PART-D2)
MATCH LINE A-A

PIG RECEIVER
IJ Ch. 195+236 Km D
12" x 12"
D
GOOV-12"
SV/SGPL/06 SV/SGPL/07 SV/SGPL/08 U/G A/G
KICKER LINE
GOOV-12" D5 31.10.22 RE-ISSUED FOR BID ARV. MC HK
D4 07.07.22 ISSUED FOR BID RA MC HK
D3 16.05.22 ISSUED FOR CLIENT APPROVAL JK MC HK
12" D2 02.05.22 RE-ISSUED FOR CLIENT REVIEW JK MC HK
D1 05.04.22 RE-ISSUED FOR CLIENT REVIEW RA MC HK
NEW TO CUSTMER C
C1 31.03.22 ISSUED FOR CLIENT REVIEW RA MC HK
C (PROJECT SCOPE)
CH: 149+400
(APPROX)

B1 24.03.22 ISSUED FOR INTERNAL REVIEW RA MC HK


REV. DATE DESCRIPTION PREP. CHKD. APPD.
CLIENT:

CH: 195.236
(APPROX)
SPREAD-2C SPREAD-2D INDRADHANUSH GAS GRID LIMITED
(LENGTH = 45.836KM)
PMC:
PART-D2 PART-E
(CURRENT PROJECT SCOPE) (BY OTHERS) VCS QUALITY SERVICES PVT. LTD.
B
B WEST BENGAL SIKKIM
PROJECT:
CROSSING DETAIL (FOR ALL PARTS)
NORTH EAST GAS GRID PHASE-III OF IGGL
PIPELINE ROUTE WIDTH CONSTRUCTION
Sr.No. CROSSING (M) METHOD
1. RAILWAY Ch. 06+844.00 Km 49.95 HDD TITLE:

Ch. 12+414.00 Km 38.71 HDD


PIPELINE SCHEMATIC DIAGRAM
2. RAILWAY
WIDTH CONSTRUCTION (SILIGURI-GANGTOK PIPELINE SECTION)
Sr.No. CROSSING PIPELINE ROUTE (M) METHOD 3. RAILWAY Ch. 48+878.00 Km 30.0 HDD
SCALE: N.T.S. TOTAL NO. OF SHTS: 1 OF 1 A
7. NH-31 Ch. 50+563.00 Km 9.63 HDD 4. RIVERS 6 NOS. OF RIVERS AT MULTIPLE CHAINAGE - HDD
A
SIZE JOB NO. DRAWING NUMBER REV.
8. NH-717A 73 NOS. OF NH-717A AT MULTIPLE CHAINAGE - HDD 5. NH-717 Ch. 03+090.00 Km 18.27 HDD

9. NH-717B 54 NOS. OF NH-717B AT MULTIPLE CHAINAGE - HDD 6. NH-37D Ch. 03+432.00 Km 27.96 HDD A1 C221052 C221052-SGPL-PP-SCM-2001 D5