PIPELINE SCHEMATIC DIAGRAM FOR NORTH EAST GAS GRID PHASE-III OF IGGL REFERENCE DRAWINGS / DOCUMENTS
S.NO. TITLE NO.
K SILIGURI-GANGTOK PIPELINE SECTION (SGPL) 1 PIPELINE ROUTE MAP C221052-SGPL-PP-RM-2001 K
12", 7.14/8.38mm THK. 600# X 195.2 KM (APPROX), API 5L x 70 PSL-2 2 P&ID - SILIGURI C221052-SGPL-PC-PID-1001
INTERMEDIATE PIGGING STATION (IP/SGPL/01)
DISPATCH TERMINAL (DT / SGPL)
CITY: MAYNAGURI SECTION-11 TOWN: LAVA 3 P&ID - SV
C221052-SGPL-PC-PID-1002-06
C221052-SGPL-PC-PID-1008-10
TEHSIL: MAYNAGURI (FOR PART- D1 & D2) TEHSIL: KALIMPONG-1 4 P&ID - RT C221052-SGPL-PC-PID-1011
DISTRICT: JALPAIGURI DISTRICT: KALIMPONG 5 C221052-SGPL-PC-PID-1007
P&ID - IP
STATE: WEST BENGAL STATE: WEST BENGAL
CH: 0+000 CH: 128+000 NOTES:-
FUTURE SCOPE
12"
KOD
METERING
5. FOR FURTHER DETAIL OF ALL TYPES OF CROSSING ALIGNMENT SHEET
12" & SURVEY REPORT SHALL BE REFERRED.
12"
SKID
FUTURE SCOPE
(CH: 359+605)
CH: 104+000
CH: 59+800
(APPROX)
(APPROX)
G
PIPELINE DETAILS
PIPE SIZE & THK.
S.No. ROUTE DESCRIPTION MATERIAL LENGTH
SPREAD-2A SPREAD-2B SPREAD-2C RATING (mm)
(LENGTH = 59.8KM) (LENGTH = 44.2KM) (LENGTH = 45.4KM) 1. DT TO IPS (LAVA) 12"x600# API 5Lx70 7.14 / 8.38 128.000 KM
PSL-2
PART-C PART-D1 PART-D2 API 5Lx70
2. IPS (LAVA) TO RT (GANGTOK) 12"x600# 7.14 / 8.38 67.236 KM
(BY OTHERS) (CURRENT PROJECT SCOPE) (CURRENT PROJECT SCOPE) PSL-2
F
F
PIG RECEIVER
IJ Ch. 195+236 Km D
12" x 12"
D
GOOV-12"
SV/SGPL/06 SV/SGPL/07 SV/SGPL/08 U/G A/G
KICKER LINE
GOOV-12" D5 31.10.22 RE-ISSUED FOR BID ARV. MC HK
D4 07.07.22 ISSUED FOR BID RA MC HK
D3 16.05.22 ISSUED FOR CLIENT APPROVAL JK MC HK
12" D2 02.05.22 RE-ISSUED FOR CLIENT REVIEW JK MC HK
D1 05.04.22 RE-ISSUED FOR CLIENT REVIEW RA MC HK
NEW TO CUSTMER C
C1 31.03.22 ISSUED FOR CLIENT REVIEW RA MC HK
C (PROJECT SCOPE)
CH: 149+400
(APPROX)
CH: 195.236
(APPROX)
SPREAD-2C SPREAD-2D INDRADHANUSH GAS GRID LIMITED
(LENGTH = 45.836KM)
PMC:
PART-D2 PART-E
(CURRENT PROJECT SCOPE) (BY OTHERS) VCS QUALITY SERVICES PVT. LTD.
B
B WEST BENGAL SIKKIM
PROJECT:
CROSSING DETAIL (FOR ALL PARTS)
NORTH EAST GAS GRID PHASE-III OF IGGL
PIPELINE ROUTE WIDTH CONSTRUCTION
Sr.No. CROSSING (M) METHOD
1. RAILWAY Ch. 06+844.00 Km 49.95 HDD TITLE:
9. NH-717B 54 NOS. OF NH-717B AT MULTIPLE CHAINAGE - HDD 6. NH-37D Ch. 03+432.00 Km 27.96 HDD A1 C221052 C221052-SGPL-PP-SCM-2001 D5
7 6 5 4 3 2 1