You are on page 1of 3

DATA HASIL PERHITUNGAN

A total = A1+A2+A3 = 1,3127694 m2


Q total = (Q1+Q2+Q3) = 0,770145924 m2/s
A. Koefisien Manning (n)
A 1,3127694 P = 2z + b = 2,03 + 4,9 = 5,5
R= = = 0,238685
P 5,5

A 2 /3 1/ 2
n= R S
Q
1,3127694 2 1 R = jari-jari hidraullik
n=¿ × 0,238685 3
× 0,04 2 = 0,131178
0,770145924
A = luas penampang total
P = keliling basah = 2z+b

B. Desain E minimal Saluran Drainase Penampang Trapezoidal


(Q/b)2
yc=
g√
3

(0,770145924 /4,9)2
=
√ 3

(0,4752855102)2
9,81

=

3

9,81
3 0,22589631621
=
√ 9,81
= 0,136049 (subkritis)
y > y c , aliran subkritis
y < y c , aliran superkritis

y konstruksi = y k = y c + 0,1 y c
= 0,136049 + 0,1(0,136049)
= 0,1496539
m= y / √ 3 = 0,2598/√ 3 = 0,149996
2
Q2 b' = 3 0,770145924 (10,1) = 0,781446
AC =

3

g √ 9,81

b ' =a+b = 5,2 + 4,9 = 10,1


9,81 x 0,781446
V C = √ g AC /b ' =

v 2c
√9,81
=0,8839943439

Emin= y C
2g
0,88399434392
¿ 0,136049 x = 0,0054187027
2(9,81)
C. Desain Saluran Drainase Kecil Penampang Segi Empat
Q = 0,1 m3/s
S = 0,0005
n = 0,02
A 1 1
R= = y = x 0,240468 = 0,120234
P 2 2
b=2 y = 2 x 0,240468 = 0,480936
A=by=2 y 2 = 2 x 0,2404682 = 0,115649718

A 2 /3 1/ 2
n= R S
Q
2 y2
n = ¿
Q
2 y2
0,02 = ¿
0,1
y = 0,240468
(Q/b)2
yc=
g √
3

(0,1/0,480936)2 = 0,0663862614
=

3

9,81
y > y c , aliran subkritis
y konstruksi = y k = y c + 0,1 y c
= 0,0663862614+ 0,1 (0,0663862614)
= 0,07302488754

You might also like