Scope:
This work Instruction describes the minimum standard for surface preparation and coating of Carbon
Steel and Stainless Steel.
General Requirements:
3- Valve will be fully assembled Functionally tested, and Hydro tested to final Assembly
and Test requirements prior to painting.
Once Valve has been fully assembled and tested, it must be disassembled before painting.
2. Be sure that all Identifying marks Heat numbers etc will not be undetectable.
4. Apply Krylon Auto Primer. Make sure Valve is completely covered. Let dry 15 minutes.
5. Apply Krylon Industrial Blue Paint. Cover all areas completely. Let dry 30 minutes minimum.
QWI12.001 A
Surface Preparation and Painting Page 2 of 3
Type & Temp Surface preparation Application Final color & Thickness
• As per Customer
As Per Customer As per Manufacturer
• As per Customer
As per Customer • As per Manufacturer
Color: Grey • Thickness: TBD
• As per Customer
As per Customer
As per Customer
• As per Customer
As per Customer As per Manufacturer As per Customer
As per Customer • As per Manufacturer
• As per Customer • Thickness: TBD
As per Customer
• As per Customer
• As per Customer
As per Customer
• As per Customer
• As per Customer
As per Customer As per Manufacturer As per Customer • As per Manufacturer
• As per Customer • Thickness: TBD
• As per Customer
As per Customer
• As per Customer
Documentation:
QWI12.001 A
Surface Preparation and Painting Page 3 of 3
QWI12.001 A