PAITON UNITS 3

OVERHAUL, INSPECTION & MAINTENANCE

CLIENT : POSSI/TDK
PROJECT : Overhaul, Inspection & Maintenance
Paiton-Probolinggo
AREA OR UNIT : Boiler Units 3 Pipe FRP Drainace System
TEST FLUID : Water

TP
Test Pressure
13.31 13.40
TP 7.0 Kg/cm²g
100.8 Psi
Actual ( 100 psi )

14.00
5.52 Kg/cm2g 13.40
75.6 Psi
Actual ( 75 psi )
MENIT

14.05
13.30 Holding Time Time (Minutes)
SCHEMATIC DIAGRAM HYDROTASTIC TEST

Prepared By : Witnessed By : Witnessed By :


PT. PRM TDK POSSI

Date : 12 November 2015 Date : Date :