You are on page 1of 4

PRETTY SWEATER LTD

CAPACITY STUDY SHEET


MO:…………………… Date:……………………
Section:……………….. IED:…………………….

NO Time Study AVG. Output Study CSVL


STT
Emp. No Operation Rating
1 2 3 4 5 6 Time Hour Day SAM SAM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Note: ……………………………………………………………………………………………………………….
………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………
IE SUP Checked by
PRETTY SWEATER LTD
FOLLOWUP SHEET
MO: Date:
STY.No: Emp. No:
Operaton: Emp. Name:
Section:
NO Sta/Fin No. of Timme/ Cum Time Study
STT
Bun.# Remarks
Time Bun. Bun. Time MB WT Repairs Personal Orthers
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
TOTAL

Total time: No. of Pcs: Porential Output /Hr.


Ineffective: Act. Time /Pc.:
Effective: Eff (%):

Worker SUP IE Checked by


PRETTY SWEATER LTD
STUDY SHEET EFF AND CAPACITY
MO Emp.No
Operation Emp.Name
Section

Study Time AVG. Eff Output


Date SAM Actual
1 2 3 4 5 6 Time (%) Hourr Day

Note: ……………………………………………………………………………………………………………….
………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………
Worker SUP IE Checked by
PRETTY SWEATER LTD
MOTION AND TIME STUDY SHEET
MO : Emp.No:
Operation : Emp.Name:
Section:
Reading

Cycle
time
Time Rate Time Rate Time Rate Time Rate Time Rate Time Rate Time Rate Time Rate Time Rate

Total
A.O.T
AVG.R.
B.T

%Allow PROD AT EFI ELIM Vs CRYCLE RATIO


B. Time PP Conti BHT SAM 1 HR 8 HR

STUDY DTARTED TEBS TOTAL ELAPS TIME


STUDY FINISHED TEBS WATCH EROR

You might also like