Plant Maintenance Work Order

Lab No:
WO NO.
2009581
Priority : P2 Next PS
Model Unit : MIT FE SUPER HD-X 6.6
Unit No : PS-11 Component: ENGINE Sample Date: 18-Jul-23
Location : FJU Lab Received Date: 25-Jul-23 Date Raise Rekom: 26-Jul-23
ASSIGMENTS ESTIMATED
Originator : Conmon HO Estimated Duration :
Assigned To : Yudha S. / Wowo L. Schedule Start Date :
Actioned By : Labour Internal Schedule Completed :
Comp Group :
Work Order Description
Fe Cr dan Si PQ di level tinggi. Viskositas rendah 1% fuel. Medium oxidation dan Soot. Abnormal wear wear pump cylinder
liners valve trains piston ring Indikasi debu dan kontaminan fuel. Check valve mechanism atau adjust. Check unusual noise.
Inspect air induction system leaking. Cut open filter & inspect particles. Periksa cooling system dan overheating check fuel
pressure check engine oil pressure test performance engine / low performance. Periksa konsumsi oli (nugroho)

Silica, Fe, DEBRIS, Cr & Soot masih tinggi. Oli sudah diganti saat sampling terakhir
1. Cek adanya kebocoran intake system
2. Cek Air Cleaner
3. Cek Adanya Abnormal noise
4. Cek level oli
5. cek filter cut rating NEXT PS
6. resample oli Engine, ganti oli & flushing NEXT PS

Dilengkapi oleh Tradeperson / Supervisor


ACTUAL
Start Date: Completion Date: Current (SMU):
Start Time: Completion Time: Total Actual Duration:

After Maintenance Remarks / Job yang dilakukan & Temuan saat pengecekan-Repair

Delay Reasons

Nama Mekanik:
Mekanik TTD: Date:
Leader/SPV TTD: Date: