Professional Documents
Culture Documents
Lab No:
WO NO.
1969421
Priority : P1 < 7 Hari
Reference :
Unit No : ADT-403 Component: TRANSMISSION Sample Date: 07-May-23
Location : SLK-AKM Lab Received Date: 18-May-23 Date Raise Rekom: 20-May-23
ASSIGMENTS ESTIMATED
Originator : Conmon HO Estimated Duration :
Assigned To : Januar / Widaja Schedule Start Date :
Actioned By : Labour Internal Schedule Completed :
Comp Group :
Work Order Description
Viscosity low High Fe and Al. Possible from Clutch discs and ferrous parts of the transmission.Bearings clutches and torque
converter . Check noise check problem shifting check filter and screen from debris Check operating temperature. Check oil
mix/ transfer. Check oil grade. (nugroho)
After Maintenance Remarks / Job yang dilakukan & Temuan saat pengecekan-Repair
Delay Reasons
Nama Mekanik:
Mekanik TTD: Date:
Leader/SPV TTD: Date: