Plant Maintenance Work Order

Lab No:
WO NO.
1969432
Priority : P1 < 7 Hari
Reference :
Unit No : AKM-01 Component: FINAL DRIVE FRONT RH Sample Date: 07-May-23
Location : SLK-AKM Lab Received Date: 18-May-23 Date Raise Rekom: 20-May-23

ASSIGMENTS ESTIMATED
Originator : Conmon HO Estimated Duration :
Assigned To : Januar / Widaja Schedule Start Date :
Actioned By : Labour Internal Schedule Completed :
Comp Group :
Work Order Description
Viscosity 28% low High PQ from gear bearing shaft housing. Check oil level and leakage. Check abnormal noise. Check drain
plug magnetic. Check operating temperature. Check oil mix/ transfer. Check oil grade. (nugroho)

Fe debris tinggi
1. Cek adanya kebocoran FD
2. resample oli
3. cek abnormal noise FD
4. cek magnetic plug rating
5. Drain sebagian oli untuk cek kandungan gram kasar, flushing oli bila terdapat gram kasar

Dilengkapi oleh Tradeperson / Supervisor


ACTUAL
Start Date: Completion Date: Current (SMU):
Start Time: Completion Time: Total Actual Duration:

After Maintenance Remarks / Job yang dilakukan & Temuan saat pengecekan-Repair

Delay Reasons

Nama Mekanik:
Mekanik TTD: Date:
Leader/SPV TTD: Date: