Plant Maintenance Work Order

Lab No:
WO NO.
1969299
Priority : P1 < 7 Hari
Reference :
Unit No : EXC101-6 Component: FINAL DRIVE RH Sample Date: 13-May-23
Location : SLK-AKM Lab Received Date: 18-May-23 Date Raise Rekom: 20-May-23

ASSIGMENTS ESTIMATED
Originator : Conmon HO Estimated Duration :
Assigned To : Januar / Widaja Schedule Start Date :
Actioned By : Labour Internal Schedule Completed :
Comp Group :
Work Order Description
Wear element normal Contaminant above normal level Oil viscosity lower than standard Check oil level Check oil pressure
Check overall leakage check operating temperature Check possibility oil mix/ transfer Ensure oil specification being used.
Check seal condition check contaminant source Check oil and drain plug from debris (nugroho)

Silica & Al tinggi


1. Cek adanya kebocoran FD
2. resample oli
3. cek abnormal noise FD
4. cek magnetic plug rating
5. Drain sebagian oli untuk cek kandungan gram kasar, flushing oli bila terdapat gram kasar

Dilengkapi oleh Tradeperson / Supervisor


ACTUAL
Start Date: Completion Date: Current (SMU):
Start Time: Completion Time: Total Actual Duration:

After Maintenance Remarks / Job yang dilakukan & Temuan saat pengecekan-Repair

Delay Reasons

Nama Mekanik:
Mekanik TTD: Date:
Leader/SPV TTD: Date: