You are on page 1of 1

Plant Maintenance Work Order

Lab No:
WO NO.
1969307
Priority : P1 < 7 Hari
Reference :
Unit No : MML-07 Component: HYDRAULIC Sample Date: 13-May-23
Location : SLK-AKM Lab Received Date: 18-May-23 Date Raise Rekom: 20-May-23

ASSIGMENTS ESTIMATED
Originator : Conmon HO Estimated Duration :
Assigned To : Januar / Widaja Schedule Start Date :
Actioned By : Labour Internal Schedule Completed :
Comp Group :
Work Order Description
Viscosity 27% below standard Al Fe Cu Wear increase wear housing Gears Bearings Cylinder brass part dirt Inspect Pump
for unusual noise Inspect pump and cylinder hydraulic from leak or scratches check filter and screen magnetic from debris
Inspect & clean breather. Check operating temperature. Check oil mix/ transfer. Check oil grade. (nugroho)

med lvl Silica, Cu, high Al


1. Cek adanya kebocoran area hydraulic system
2. cek abnormal noise pada pump/ CV
3. cek hyd tank breather
4. cek Attachment hyd Drift
5. resample Oli Hyd
6. cek Hyd Filter

Dilengkapi oleh Tradeperson / Supervisor


ACTUAL
Start Date: Completion Date: Current (SMU):
Start Time: Completion Time: Total Actual Duration:

After Maintenance Remarks / Job yang dilakukan & Temuan saat pengecekan-Repair

Delay Reasons

Nama Mekanik:
Mekanik TTD: Date:
Leader/SPV TTD: Date:

You might also like