Professional Documents
Culture Documents
Lab No:
WO NO.
1969305
Priority : P1 < 7 Hari
Reference :
Unit No : EXC101-7 Component: FINAL DRIVE LH Sample Date: 13-May-23
Location : SLK-AKM Lab Received Date: 18-May-23 Date Raise Rekom: 20-May-23
ASSIGMENTS ESTIMATED
Originator : Conmon HO Estimated Duration :
Assigned To : Januar / Widaja Schedule Start Date :
Actioned By : Labour Internal Schedule Completed :
Comp Group :
Work Order Description
Viscosity low Contaminant in above normal Si Al Fe above normal wear Gears Bearings Splines housing Shafts Check oil
level and leakage. Check abnormal noise. Check magnetic plug and debris. Inspect inner part. Repair necessary or flush to
remove particle.Possible dirt. Check seal leaking. Check contaminant source. Check operating temperature. Check oil mix/
transfer. Check oil grade. (nugroho)
After Maintenance Remarks / Job yang dilakukan & Temuan saat pengecekan-Repair
Delay Reasons
Nama Mekanik:
Mekanik TTD: Date:
Leader/SPV TTD: Date: