Plant Maintenance Work Order

Lab No:
WO NO.
50055914
Priority : P1 < 7 Hari
Model Unit : MB AXOR 2528CH
Unit No : M-30 Component: ENGINE Sample Date: 16-Jul-23
Location : BSW Lab Received Date: 24-Jul-23 Date Raise Rekom: 26-Jul-23
ASSIGMENTS ESTIMATED
Originator : Conmon HO Estimated Duration :
Assigned To : Jaffar / Arwin S. Schedule Start Date :
Actioned By : Labour Internal Schedule Completed :
Comp Group :
Work Order Description
Fe Cr dan PQ dilevel tinggi. Soot dilevel medium. Indikasi keausan pada Cylinder liner valve train oil pump. Check mekanisme
valve Periksa kondisi air cleaner ganti jika robekPeriksa Air Induction or Air filter System dari kemungkinan debu/pasir masuk
Periksa kemungkinan kontaminasi. Check noise periksa filter cut dan oil pressure. check fuel system malfunction (timing dan
faulty injectors) periksa kondisi turbocharger operation atau pressures.(Febri- Lab jkt)

High Iron, Cr, DEBRIS. Medium Soot level. Oli sudah diganti disampling sebelumnya.
1. Cek adanya kebocoran Air Intake System
2. Cek Air Cleaner
3. Cek Adanya Abnormal pada performa Engine
4. Cek Abnormal pada Asap Muffler
5. Resample oli NEXT PS
6. Cek abnormal noise
7. Cutting Filter NEXT PS

Dilengkapi oleh Tradeperson / Supervisor


ACTUAL
Start Date: Completion Date: Current (SMU):
Start Time: Completion Time: Total Actual Duration:

After Maintenance Remarks / Job yang dilakukan & Temuan saat pengecekan-Repair

Delay Reasons

Nama Mekanik:
Mekanik TTD: Date:
Leader/SPV TTD: Date: