You are on page 1of 1

Plant Maintenance Work Order

Lab No:
WO NO.
1969310
Priority : P1 < 7 Hari
Reference :
Unit No : ADT-408 Component: BRAKE COOLING Sample Date: 13-May-23
Location : SLK-AKM Lab Received Date: 18-May-23 Date Raise Rekom: 20-May-23

ASSIGMENTS ESTIMATED
Originator : Conmon HO Estimated Duration :
Assigned To : Januar / Widaja Schedule Start Date :
Actioned By : Labour Internal Schedule Completed :
Comp Group :
Work Order Description
Cu increase Medium Na. Possible Brass pump parts Cooler core leaching discs. Check oil level and overall leakage check filter
from abnormal wear suggest inspect component for excessive wear check system brake performance. Check abnormal
temperature and operation condition. Check seal and breather

Tren Cu masih tinggi


1. monitoring level oli
2. Cek abnormal temperatur brake cooling
3. cek system pressure brake cooling
4. resample Oli
5. cek adanya kontaminasi pada oli

Dilengkapi oleh Tradeperson / Supervisor


ACTUAL
Start Date: Completion Date: Current (SMU):
Start Time: Completion Time: Total Actual Duration:

After Maintenance Remarks / Job yang dilakukan & Temuan saat pengecekan-Repair

Delay Reasons

Nama Mekanik:
Mekanik TTD: Date:
Leader/SPV TTD: Date:

You might also like