You are on page 1of 1

Plant Maintenance Work Order

Lab No:
WO NO.
2009481
Priority : P1 < 7 Hari
Model Unit : KOM PC200-10M0
Unit No : EXC103-52 Component: FINAL DRIVE RH Sample Date: 19-Jul-23
Location : TGM Lab Received Date: 24-Jul-23 Date Raise Rekom: 26-Jul-23
ASSIGMENTS ESTIMATED
Originator : Conmon HO Estimated Duration :
Assigned To : Otniel / Iswanto / Widaja Schedule Start Date :
Actioned By : Labour Internal Schedule Completed :
Comp Group :
Work Order Description
Fe Al Si dilevel tinggi. PQ dilevel medium. Indikasi debu masuk. Wear Gears Roller bearings Splines Shafts Housing. Sample oli
gelap. Check oil level inspect oil leak & unusual noise check sumber kontaminan masuk inspect kondisi keausan seals/ O ring.
Check magnetic plug dan debris. Lakukan perbaikan. (Febri)

Medium DEBRIS. High Iron, Si, Al


1. cek kebocoran area Final Drive
2. resample oli
3. Cek Noise pada final drive
4. Drain sebagian oli, inspek adanya partikel gram kasar. Flushing & ganti oli bila ada partikel
5. Cek Magnetic Plug rating

Dilengkapi oleh Tradeperson / Supervisor


ACTUAL
Start Date: Completion Date: Current (SMU):
Start Time: Completion Time: Total Actual Duration:

After Maintenance Remarks / Job yang dilakukan & Temuan saat pengecekan-Repair

Delay Reasons

Nama Mekanik:
Mekanik TTD: Date:
Leader/SPV TTD: Date: