Lab No:
WO NO.
1969430
Priority : P1 < 7 Hari
Reference :
Unit No : AKM-01 Component: DIFFERENTIAL FRONT Sample Date: 07-May-23
Location : SLK-AKM Lab Received Date: 18-May-23 Date Raise Rekom: 20-May-23
ASSIGMENTS ESTIMATED
Originator : Conmon HO Estimated Duration :
Assigned To : Januar / Widaja Schedule Start Date :
Actioned By : Labour Internal Schedule Completed :
Comp Group :
Work Order Description
Viscosity 27% low High PQ from gear bearing shaft housing. Check oil level and leakage. Check abnormal noise. Check drain
plug magnetic. Check operating temperature. Check oil mix/ transfer. Check oil grade. (nugroho)
Fe debris tinggi
1. Cek adanya kebocoran FD
2. resample oli
3. cek abnormal noise FD
4. cek magnetic plug rating
5. Drain sebagian oli untuk cek kandungan gram kasar, flushing oli bila terdapat gram kasar
After Maintenance Remarks / Job yang dilakukan & Temuan saat pengecekan-Repair
Delay Reasons
Nama Mekanik:
Mekanik TTD: Date:
Leader/SPV TTD: Date: