Date:
Spreading & Cutting Time Calculation:
Calculation for Tops: Sperading Status Cutting Status
Cut Marker Spreading Spreading Lay Cutting Start Finish
Total
Per Pcs Start Finished Total Per Pcs Remarks
Buyer Style Time(Hr
No. Pcs Length Width Qty Qty (Pcs) Time Time Time Time Time Time Time
s)
Total/Average:
Note:
SHIRT
Sl.N. Operation Time Sec
1 Lay time 0.083 4.98
2 Marker setting 0.011 0.66
3 Cutting time 0.061 3.66
4 Back part scissoring 0.150 9
5 Back Numbering 0.080 4.8
6 Front part pining 0.377 22.62
7 Front part cutting 0.043 2.58
8 Front scissoring 0.850 51
9 Front numbering 0.151 9.06
10 Sleeve scissoring (I) 0.133 7.98
11 Sleeve scissoring (ii) 0.229 13.74
12 Sleeve check match 0.629 37.74
13 Sleeve cutting 0.061 3.66
14 Sleeve numbering 0.065 3.9
15 Yoke cutting (Band knife) 0.053 3.18
16 Yoke numbering 0.078 4.68
17 Placket numbering 0.039 2.34
18 Collar numbering 0.069 4.14
19 Collar band numbering 0.061 3.66
20 Pocket numbering 0.033 1.98
3.256 195.36
Add: Allowance 15% 0.488 29.304
3.744 224.7
0
5 of 6 567782978.xls Production Monitoring
2 Cutting
3 Numbring
4 Bundling
Component
5
Inspection
6 Replacement Cutting
7 Scissoring
Note:
Cutting Incharge (1) Cutting Incharge (2) Asst. Manager Cut: General Manager