You are on page 1of 1

HYDROSTATIC PRESSURE TEST ON PLUMBING PIPEWORK RECORD

Project : Paul Y. General Contractors Limited Ref. No. : PYGC-LKS-SIR-BS-PD-T-00034


Services : Choi Sum Water Pipe Service Co., Ltd Date of Testing:
Location : The Propoesd Senior Citizen Residences Development 8 Lee Kung Street, Hung Hom Test Method : Hydrostatic Pressure Test on Plumbing Pipework

Start Final Presure gauge Presure gauge


Location / Floor / Pipe Size / Section /System Test Status
Item Duration (hour) Indetification Calibration Cert. Remark
(potable or flushing water system) (Pass or Fail)
Time Pressure(Bars) Time Pressure(Bars) No. No.

1 40mm dia. upvc water pipe - 1 no. for 11/F; (Flat 1-16 and corridor; Flushing water System) 10 10 6 01333C100202-16

Testing Pressure Name Signature


1.5 time Working Pressure
or 10Bars (150PSI) Tested By : (CHOI SUM)

Duration of Testing Date :


min. 6 hours for testing.

Remark: Witnessed By: (Paul Y. Construction)


1 bar = 1.0197 kg/cm sq.
Date :

Endorsed By: (BSI)

Date :

You might also like