You are on page 1of 3

LAPORAN

SHUT DOWN MAINTENANCE 2019


PT. KAO INDONESIA CHEMICALS
( UTILITY PLANT )

PT. RITTINDO
WORK LIST
Project : KIC SHUT DOWN MAINTENANCE
Plant : UTILITY PLANT
Job Description : OVER HOULE (Inspection of Mechanical seal / Bearing, Impeller, Shaft)

No Item Description Seal Type Remarks


1 G-001 RW Main Pump Gland Packing
2 G-003 RW Main Pump Mechanical seal
3 G-005 RW Main Pump Gland Packing
4 G-007 HW 55 Feed Pump VD78 Gland Packing
5 G-009 HW 55 Feed Pump To T-101, T-102 Mechanical seal
6 G-010 HW 55 Feed Pump To T-101, T-102 Mechanical seal
7 G-011 HW 60 Feed Pump VD1,2,3 Mechanical seal
8 G-012 HW Tank 55 VD4,5,6 Mechanical seal
9 G-013 HW PUMP S4 Mechanical seal
10 G-013 Waste Storage Area Mechanical Seal
11 G-015 HW Tank 55 VD4,5,6 Mechanical seal
12 G-200 RW Suplay Pump Gland Packing
13 G-201 RW Chiller Supply Pump Gland Packing
14 G-403 HW Tank 75 VD4 Mechanical seal
15 G-501 IW Pump Gland Packing
16 G-502 IW Pump Gland Packing
17 G-503 FW Pump Gland Packing
18 G-504 FW Pump Gland Packing
19 G-505 FW Feed Pump Gland Packing
20 G-513 Hew Feed Pump Mechanical seal
21 G-701 Waste Water Feed Pump Mechanical Seal
22 G-705 HW 55 Feed Pump VD78 Gland Packing
23 G-711 Sludge Recycle Pump Mechanical Seal
24 G-713 Sludge Pump Rotor & Stator
25 G-719 Washing Water Pump Mechanical seal
26 G-806 48% NaOH Discharge Pump S4
27 G-807 98% H2SO4 Discharge Pump Bushing
28 G-816 48% NaOH Receiving Pump
29 G-866 48% NaOH Discharge Pump
30 G-904 EMAL 270N Discharge Pump

Prepared by,

Manta

You might also like