Khata Besi Bagar Bandh
Khata Besi Bagar Bandh
ldlt M 2075/9/3
>Ldfg\,
k|:t't ;Gb{edf o; kfrFvfn gu/kflnsfsf] gu/ ;ef 2076 n] cf=j= 2076/077
sf] nflu o; gu/kflnsfsf] j8f g+= २ df पूर्वाधार विकास lzif{s cGt{ut
खाटा बेसी बगर बाँध निर्माण sfo{ ug{ ? 2,500,000.00
a/fa/sf] nfut cg'dfg ;d]t tof/ u/L ;f] sfo{ ug{ j8f cWoIf Ho"sf] l;kmfl/; ;fy ;Demf}tfsf]
lglDt lg0f{ofy{ k]z ub{5' .
>Ldfg\,
k|:t't ;Gb{edf o; kfrFvfn gu/kflnsfsf] gu/ ;ef 2076 n] cf=j= 2076/2077
xfn ;f] pkef]Qmf ;ldlt jf6 tf]lsPsf] sfo{ ;DkGg ePsf] egL /sd e"QmfgLsf] lglDt dfu
cfPsf]df o; sfof{nosf k|fljlws sd{rf/L >L=सुसन राजभण्डारी jf6 cg'udg lgl/If0f
u/L ;f] sf] k|ltj]bg ;d]t k]z eO{ cfPsf]n] ;f] k|ltj]bg , MeasurementSheet, ###
Final Valuation Pj+ Work Completion Report ;d]t o;} ;fy ;+nUg u/L
lgodfg';f/ s/ s§L u/L e"QmfgLsf] lglDt lg0f{ofy{ k]z ub{5' .
l;=g+ cfof]hgfsf] gfd Estimated Evaluated gu/kflnsf jf6 ३ k|ltzt e"QmfgL /sd s}lkmo
= Amount Amount :jLs[t /sd ?= sG6]Gh] t
G;L
! s§L /sd
खाटा बेसी बगर
बाँध निर्माण
2,500,000.00
2,425,000.00
607,854.63
151,247.25
75,000.00
kfFrvfn gu/kfnLsf
gu/ sfo{kflnsfsf] sfo{fno
ldlt M
>LdfGf\ gu/ k|d'v
kfFrvfn gu/kflnsf
laifo M– cg'udg k|tLj]bg k]z ;DaGwdf .
cg'udg ubf{ pkef]Qmf ;ldltn] nfut cg'dfg adf]lhdsf sfo{x? ;DkGg u/]sfn] gfk hf+r
adf]lhd ljlgof]lht jh]6 cg';f/ ljn e'QmfgLsf]
nfuL l;kmfl/; ub{5f} .
Title पूर्वाधार विकास
Name of user committee खाटा बेसी बगर बाँध निर्माण उपभोक्ता समिति
Location पाँचखाल - ०४
F/Y ०७७/७८
Budget २५०००००
Programme नगरपालिका
work completed -
president number
Ward no २
Estimated Amount in word छ लाख सात हजार आठ सय चौउन्न रुपैया त्रिसठी पैसा मात्र
for payment
पाँचखाल नगरपलिका
नगर कार्यपालिकाको कार्यालय
पाँचखाल, काभ्रेपलान्चोक
बागमती प्रदेश, नेपाल
लागत अनुमान
योजनाको शीर्षक: खाटा बेसी बगर बाँध निर्माण आर्थिक वर्ष: ०७७/७८
कार्यको नाम: खाटा बेसी बगर बाँध निर्माण उपभोक्ता समिति बजेट:
कै फिय
क्र. सं. कार्य विवरण संख्या लम्बाई चौडाई उचाई परिमाण इकाई दर रकम
त
९.१ माटो सम्याउने काम १ ५५ ०.६ ०.१ 3.3 घ.मि 582.81 1923.27
९.२ ढुं गा सोलिंग गर्ने काम १ ५५ ०.६ ०.१ 3.3 घ.मि 5368.80 17717.04
633.60 मि
जम्मा 598854.63
कन्टिनजेन्सी बजेटको 3 % 9000.00
कु ल जम्मा 607854.63
9.1 I B (Ref. to
2 SS.905) Roadway Excavation in all types of Soil by Mechanical Means 66.61
9.1 II A (Ref. to
3 SS.905) Roadway Excavation in ordinary rock by Manual Means Cum 673.28
9.1 II B (Ref. to
4 SS.905) Roadway Excavation in ordinary rock by Mechanical Means Cum 199.83
9.1 IV A (Ref.
5 to SS.905) Excavation in Hard Rock (blasting prohibited) Mechanical method, lead upto 30 m Cum 1815.91
9.11 D (Ref. to Providing suitable material and Back filling behind abutment, wing wall and return wall
6 SS.908) complete Locally available Material, with out watering and compaction by tamping rod Cum 319.09
(Material available at site)
10.8 (Ref. to Providing and laying of hand pack Stone soling with 150 to 200 mm thick stones (river
7 SS.1006) Cum 5368.80
stone ) and packing with smaller stone on prepared surface
10.8 (Ref. to
Providing and laying of hand pack Stone soling with 150 to 200 mm thick stones (quarry
8 SS.1006) Cum 5640.00
stone ) and packing with smaller stone on prepared surface
26.2 (Ref. to Providing and laying of Random rubble stone Masonry in mud Mortar
9 SS.2602,2603, Cum 5704.20
2608)
26.3 C (Ref. Providing and laying of Stone Masonry Work in Cement Mortar 1:6 in Foundation complete
to
10 SS.2602,2603, Cum 8547.50
2607)
26.6 A (Ref. Providing and laying of Stone Masonry Work in Cement Mortar 1:6 in structure complete
to
11 SS.2600,2607) Cum 9950.31
20.1 (Ref. to Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in
12 SS.2000) Foundation complete Cum 10566.53
20.2 A (Ref. to Providing and laying of Plain/Reinforced Cement Concrete (P/RCC) Grade M 15 for
13 SS.2000) nominal mix) in Foundation with formwork all complete Cum 12269.76
20.4 A (Ref. to Providing and laying of Plain/Reinforced Cement Concrete (P/RCC) Grade M 15 for
14 SS.2000) nominal mix) in sub-structure with formwork all complete (height upto 5 m) Cum 12977.63
20.4 A (Ref. to Providing and laying of Plain/Reinforced Cement Concrete (P/RCC) Grade M20 for
15 SS.2000) nominal mix) in sub-structure with formwork all complete (height upto 5 m) Cum 14287.82
20.5 (Ref. to Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure all
16 SS.2014) complete (up to 8 mm dia.) kg 110.74
20.5 (Ref. to Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure all
17 SS.2014) complete (above 8 mm dia.) kg 108.25
24.1 A ii , Assembling mechanical woven Gabion boxes /mattresses, placing in position including
24.3,24.4 stretching; forming compartments; tying the sides and diaphragms with binding wire in
(Ref. to each mesh; tying with bracing wires and tie wires; and tying down the lid complete as per
18 SS.2401, specification with stone filling with Heavy zinc coated Hexagonal mesh type 100 mm x box 9772.86
2402) 120 mm, mesh wire 2.7 mm, selvage wire 3.4 mm, lacing wire 2.2 mm Box size 2 X 1 X 1
m ( 11 sqm) ( for one box)
2.3 (Ref. to Clearing grass/ top soil and removal up to a distance of 50 meters outside the periphery of
19 SS.201) the area , including cutting and filling of small undulation by Manual Means sq m 7.25
2.1 I (i) A Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,
(Ref. to shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and
SS.201) disposal of unserviceable materials and stacking of serviceable Material to be used or
20 auctioned, up to a lead of 30 meters including removal and disposal of top organic soil not sq m 14.50
exceeding 150 mm in thickness by Manual Means, In area of light jungle (less than 15
number per 100 sqm)
10.01 (old Subgrade construction and preparation of formationin in cutting (other than rock
21 norms) excavation) including disposal of material upto10m. cum 141.40
12.1 A (Ref. to Providing and laying granular sub-base on prepared surface, mixing at OMC, and
22 SS.1201) compacting to achieve the desired density, complete as per Drawing and Technical cum 2964.32
Specifications.
S. No. Norms No: Items Unit Rate 11
12.1 B (Ref. to Providing and laying local gravel work by manual Means on prepared surface
23 SS.1201) cum 1003.48
PANCHKHAL MUNICIPALITY 12
OFFICE OF MUNICIPAL EXECUTIVE
BAGAMATI PROVINCE, NEPAL
Rate for Civil Works Road works ( contractor)
SUMMARY
9.1 I B (Ref. to
2 SS.905) Roadway Excavation in all types of Soil by Mechanical Means Cum 68.95
9.1 II A (Ref. to
3 SS.905) Roadway Excavation in ordinary rock by Manual Means Cum 774.27
9.1 II B (Ref. to
4 SS.905) Roadway Excavation in ordinary rock by Mechanical Means Cum 206.86
9.1 IV A (Ref.
5 to SS.905) Excavation in Hard Rock (blasting prohibited) Mechanical method, lead upto 30 m Cum 1916.19
9.11 D (Ref. to Providing suitable material and Back filling behind abutment, wing wall and return wall
6 SS.908) complete Locally available Material, with out watering and compaction by tamping rod Cum 366.96
(Material available at site)
10.8 (Ref. to Providing and laying of hand pack Stone soling with thick stones (river stone ) and
7 SS.1006) Cum 5851.20
packing with smaller stone on prepared surface
10.8 (Ref. to
Providing and laying of hand pack Stone soling with 150 to 200 mm thick stones (quarry
8 SS.1006) Cum 6127.20
stone ) and packing with smaller stone on prepared surface
26.2 (Ref. to Providing and laying of Random rubble stone Masonry in mud Mortar
9 SS.2602,2603, Cum 6215.98
2608)
26.3 C (Ref. Providing and laying of Stone Masonry Work in Cement Mortar 1:6 in Foundation
to complete
10 SS.2602,2603, Cum 9159.98
2607)
26.6 A (Ref. Providing and laying of Stone Masonry Work in Cement Mortar 1:6 in structure complete
to
11 SS.2600,2607) Cum 9950.31
20.1 (Ref. to Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in
12 SS.2000) Foundation complete Cum 10917.87
20.2 A (Ref. to Providing and laying of Plain/Reinforced Cement Concrete (P/RCC) Grade M 15 for
13 SS.2000) nominal mix) in Foundation with formwork all complete Cum 12720.10
20.4 A (Ref. to Providing and laying of Plain/Reinforced Cement Concrete (P/RCC) Grade M 15 for
14 SS.2000) nominal mix) in sub-structure with formwork all complete (height upto 5 m) Cum 13453.95
20.4 A (Ref. to Providing and laying of Plain/Reinforced Cement Concrete (P/RCC) Grade M20 for
15 SS.2000) nominal mix) in sub-structure with formwork all complete (height upto 5 m) Cum 14789.03
20.5 (Ref. to Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure all
16 SS.2014) complete (up to 8 mm dia.) kg 114.09
20.5 (Ref. to Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure all
17 SS.2014) complete (above 8 mm dia.) kg 111.56
24.1 A ii , Assembling mechanical woven Gabion boxes /mattresses, placing in position including
24.3,24.4 stretching; forming compartments; tying the sides and diaphragms with binding wire in
(Ref. to each mesh; tying with bracing wires and tie wires; and tying down the lid complete as per
18 SS.2401, specification with stone filling with Heavy zinc coated Hexagonal mesh type 100 mm x box 10235.65
2402) 120 mm, mesh wire 2.7 mm, selvage wire 3.4 mm, lacing wire 2.2 mm Box size 2 X 1 X 1
m ( 11 sqm) ( for one box)
2.3 (Ref. to Clearing grass/ top soil and removal up to a distance of 50 meters outside the periphery of
19 SS.201) the area , including cutting and filling of small undulation by Manual Means sq m 8.34
2.1 I (i) A Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,
(Ref. to shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and
SS.201) disposal of unserviceable materials and stacking of serviceable Material to be used or
20 auctioned, up to a lead of 30 meters including removal and disposal of top organic soil not sq m 16.68
exceeding 150 mm in thickness by Manual Means, In area of light jungle (less than 15
number per 100 sqm)
10.01 (old Subgrade construction and preparation of formationin in cutting (other than rock
21 norms) excavation) including disposal of material upto10m. cum 154.99
12.1 A (Ref. to Providing and laying granular sub-base on prepared surface, mixing at OMC, and
22 SS.1201) compacting to achieve the desired density, complete as per Drawing and Technical cum 3024.27
Specifications.
12.7 A (Ref. to Providing and laying Crusher Run Macadam on a prepared surface, spreading and
23 SS.1204) mixing , watering and compacting to form a layer of Base course as per Drawing and cum 4639.42
Technical Specifications.
13.1 A (Ref. to Providing and applying prime coat with with MC 30 / 70 by Mechanical Means Hot
SS.1302) Bitumen ( including cutter) on prepared surface of granular base including cleaning of road
24 surface and spraying by mechanical means as per Technical Specification. ltr 115.55
13.1 B (Ref. to Providing and applying prime coat with with MC 30 / 70 by manual means Hot Bitumen
SS.1302) ( including cutter) on prepared surface of granular base including cleaning of road surface
25 and spraying at specified rate by manual means as per Technical Specification . ltr 229.24
13.2 A (Ref. to Providing and applying tack coat By Mechanical Means with hot Bitumen at specified
26 SS.1302) rate on the prepared non-bituminous surfaces including cleaning as per Technical ltr 106.21
Speciation
13.2 B (Ref. to Providing and applying tack coat By Manual Means with hot Bitumen at the specified rate
27 SS.1302) the prepared surfaces including cleaning as per Technical Speciation . ltr 175.19
S. No. Norms No: Items Unit Rate 13
13.9 A (Ref. to Providing and laying open-graded premix carpet of 20 mm thickness composed of 13.2
28 SS.1311) mm to 5.6 mm aggregates as wearing course on a previously prepared base as per cum 15168.27
drawing and Technical Specifications
13.6 (Ref. to Providing and laying Bituminous concrete/ Asphalt concrete using crushed aggregates of
29 SS.1309) specified grading, premixed with bituminous binder and filler as per Drawing and Technical cum 20325.64
Specifications
(Ref. to Providing and laying sand seal.
SS.1301,1305)
30 (old norms) sqm 137.87
15.9 (Ref. to
SS.1504 i) Providing and laying of hot applied thermoplastic compound at least 2 mm thick including
31 reflectorizing glass beads as per DOR Traffic sign manual/ Specifications .The finished sqm 1105.09
surfaceto be level, uniform and free from streaks and holes.
पाँचखाल नगरपलिका
नगर कार्यपालिकाको कार्यालय
पाँचखाल, काभ्रेपलान्चोक
बागमती प्रदेश, नेपाल
नापी किताब
योजनाको शीर्षक: खाटा बेसी बगर बाँध निर्माण आर्थिक वर्ष: ०७७/७८
कार्यको नाम: खाटा बेसी बगर बाँध निर्माण उपभोक्ता समिति बजेट:
कै फिय
क्र. सं. कार्य विवरण संख्या लम्बाई चौडाई उचाई परिमाण इकाई दर रकम
त
१:२:४ को आर.सी.सी.
३ ५०.९४ 3=ld= १२२६९.७६ ६२५०७९.७४
ढलानको काम
87.30 र.मि.
10mm Φ dia main bar total
67.90
8mm Φ dia main bar total
Unit WT 0.40 के .जी.
26.82 के .जी.
जम्मा 80.71 के .जी.
९.१ माटो सम्याउने काम १ ४४.२० ०.६ ०.१ 2.652 घ.मि 582.81 1545.61
९.२ ढुं गा सोलिंग गर्ने काम १ ४४.२० ०.६ ०.१ 2.652 घ.मि 5368.80 14238.06
509.40 मि
जम्मा 1959896.34
कु ल जम्मा 1970446.36
अक्षेरुपी पच्चीस लाख बहत्तर हजार नौ सय एघार रुपैया चउन्न पैसा मात्र
another 1
1st horizontal 19.3 2.386667 0.15 6.91
vertical 19.3 0.15 0.75 2.17
DV 19.3 0.15 0.3 0.87
another 2
1st horizontal 17.3 0.85 0.15 2.21
vertical 17.3 0.15 0.8666667 2.25
another3
1st horizontal 20.7 0.73 0.15 2.27
vertical 20.7 0.15 0.5333333 1.66
at rt side khet
top layer horizontal 4 1 0.1 0.40
vertical 2.1 1.45 0.1 0.30
next vertical 1.9 0.95 0.1 0.18
left bottom
horizontal 2 1 0.1 0.20
2 2 0.1 0.40
vertical 3 0.74 0.1 0.22
2 1 0.1 0.20
extra slab
horizontal 1.35 0.45 0.125 0.08
horizontal 1.35 0.55 0.075 0.06
vertical 3.3 0.3 0.3333333 0.33
total 50.94
0.617284 10 dia
1667.529 0.395062 8 dia
326.8741
1994.403 kg
पाँचखाल नगरपलिका
नगर कार्यपालिकाको कार्यालय
पाँचखाल, काभ्रेपलान्चोक
नापी किताब
योजनाको शीर्षक: खाटा बेसी बगर बाँध निर्माण आर्थिक वर्ष: ०७७/७८
कार्यको नाम: खाटा बेसी बगर बाँध निर्माण उपभोक्ता समिति बजेट: 2500000
ठे गाना: पाँचखाल - ०४ कार्यक्रम: नगरपालिका
क्र. सं. कार्य विवरण संख्या लम्बाई चौडाई उचाई परिमाण इकाई कै फियत
६४.०० वटा.
461.10 मि
182.13 kg
4.60 घ,मि.
अन्तिम मुल्यांकन
योजनाको शीर्षक: खाटा बेसी बगर बाँध निर्माण आर्थिक वर्ष: ०७७/७८
कार्यको नाम: खाटा बेसी बगर बाँध निर्माण उपभोक्ता समिति बजेट: 2,500,000
ठे गाना: पाँचखाल - ०४ कार्यक्रम: नगरपालिका
क्र. सं. कार्य विवरण संख्या लम्बाई चौडाई उचाई परिमाण इकाई दर रकम कै फियत
जम्मा 151247.25
कन्टिनजेन्सी बजेटको ४ % 100000.00
कु ल जम्मा 251247.25
अक्षेरुपी #NAME?
पाँचखाल नगरपलिका
पाँचखाल, काभ्रेपलान्चोक
कार्यको नाम: खाटा बेसी बगर बाँध निर्माण उपभोक्ता समिति उपभोक्ता समितिको नाम :
१ डोज़र बाट सडक सफा गर्ने काम घ.मि. Err:509 Err:509 Err:509 320.00 Err:509 Err:509 Err:509 Err:509 Err:509
२ RCC को लागि ढुं गाको सोलिंग गर्ने काम घ.मि. Err:509 Err:509 Err:509 26.10 Err:509 Err:509 Err:509 Err:509 Err:509
३ सडक मा १:२:४ को ढलान गर्ने काम घ.मि. Err:509 Err:509 Err:509 26.10 Err:509 Err:509 Err:509 Err:509 Err:509
४ ढलानको लागि फर्माको काम ब.मि. Err:509 Err:509 Err:509 17.40 Err:509 Err:509 Err:509 Err:509 Err:509
६ ह्युम पाइप(१५० मि.मि.) र.मि. Err:509 Err:509 Err:509 2.50 Err:509 Err:509 Err:509 Err:509 Err:509
७ १० मि.मि. मोटाइ मा ग्रावेल गर्ने काम ब.मि. Err:509 Err:509 Err:509 749.72 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
कै फियत
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
पाँचखाल नगरपलिका
नगर कार्यपालिकाको कार्यालय
पाँचखाल, काभ्रेपलान्चोक
३ नम्बर प्रदेश, नेपाल
अन्तिम मुल्यांकन
योजनाको शीर्षक: खाटा बेसी बगर बाँध निर्माण आर्थिक वर्ष: ०७७/७८
कार्यको नाम: खाटा बेसी बगर बाँध निर्माण उपभोक्ता समिति बजेट: 2,500,000
ठे गाना: पाँचखाल - ०४ कार्यक्रम: नगरपालिका
क्र. हाल सम्म भएको कामको बिल अघिल्लो कामको बिल वर्तमान कामको बिल
कार्य विवरण इकाई कै फियत
सं.
परिमाण दर रकम परिमाण रकम परिमाण रकम
१ डोज़र बाट सडक सफा गर्ने काम घ.मि. 69.00 74.24 5,122.56 0.00 0.00 69.00 5,122.56
४ ढलानको लागि फर्माको काम ब.मि. 18.00 612.15 11,018.70 0.00 0.00 18.00 11,018.70
६ ह्युम पाइप(१५० मि.मि.) 0.70 Err:509 Err:509 0.00 Err:509 0.70 Err:509
र.मि.
७ १० मि.मि. मोटाइ मा ग्रावेल गर्ने काम 5,502.22 Err:509 Err:509 0.00 Err:509 5,502.22 Err:509
ब.मि.
अक्षेरुपी #NAME?
200000
903745.511
32000
0.035408198
Err:509
नापी किताब
योजनाको शीर्षक: खाटा बेसी बगर बाँध निर्माण आर्थिक वर्ष: ०७७/७८
कार्यको नाम: खाटा बेसी बगर बाँध निर्माण उपभोक्ता समिति बजेट: 2500000
ठे गाना: पाँचखाल - ०४ कार्यक्रम: नगरपालिका
क्र. सं. कार्य विवरण संख्या लम्बाई चौडाई उचाई परिमाण इकाई कै फियत
अन्तिम मुल्यांकन
योजनाको शीर्षक: खाटा बेसी बगर बाँध निर्माण आर्थिक वर्ष: ०७७/७८
कार्यको नाम: खाटा बेसी बगर बाँध निर्माण उपभोक्ता समिति बजेट: 2,500,000
ठे गाना: पाँचखाल - ०४ कार्यक्रम: नगरपालिका
क्र. हाल सम्म भएको कामको बिल अघिल्लो कामको बिल वर्तमान कामको बिल
कार्य विवरण इकाई
सं.
परिमाण दर रकम परिमाण रकम परिमाण रकम
१ डोज़र बाट सडक सफा गर्ने काम घ.मि. 320.00 74.24 23,756.80 320.00 23756.80 0.00 0.00
४ ढलानको लागि फर्माको काम ब.मि. 17.40 612.15 10,651.41 17.40 10651.41 0.00 0.00
६ ह्युम पाइप(१५० मि.मि.) 2.50 Err:509 Err:509 0.00 Err:509 2.50 Err:509
र.मि.
७ १० मि.मि. मोटाइ मा ग्रावेल गर्ने काम 749.72 Err:509 Err:509 531.30 Err:509 218.42 Err:509
ब.मि.
अक्षेरुपी #NAME?
कै फियत
5713963.79
200000
903745.511
32000
0.035408198
Err:509
Err:509
By
Excavator
#REF! #REF!
#REF! #REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Binding wire
#REF! #REF! (kg)
#REF!
#REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
5 #REF! #REF! #REF!
6 #REF! #REF! #REF!
7 #REF! #REF! #REF!
8 #REF! #REF! #REF!
9 #REF! #REF! #REF!
10 #REF! #REF! #REF!
11 #REF! #REF! #REF!
#REF!
12 #REF! #REF! #REF!
13 #REF! #REF! #REF! #REF! #REF!
14 #REF! #REF! #REF! #REF!
15 #REF! #REF! #REF! #REF!
16 #REF! #REF! #REF! #REF! #REF! #REF!
17 #REF! 2.61 #REF! #REF! #REF! #REF! #REF!
#REF!
18 #REF! #REF! #REF! #REF! #REF!
19 #REF! #REF! #REF! #REF! #REF!
20 #REF! #REF! #REF! #REF!
21 #REF! 1.64 #REF! #REF! #REF! #REF! #REF!
22 #REF! #REF! #REF! #REF! #REF! #REF!
23 #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
24 #REF! #REF! #REF! #REF! #REF! #REF!
25 #REF! #REF! #REF! #REF! #REF! #REF!
26 #REF! #REF! #REF! #REF! #REF! #REF!
27 #REF! #REF! #REF! #REF! #REF! #REF!
28 #REF!
#REF! #REF! #REF!
29 #REF! #REF! #REF! #REF!
#REF!
30 #REF!
#REF! #REF! #REF!
31 #REF! #REF! #REF! #REF!
32 #REF!
#REF! #REF! #REF!
33 #REF!
#REF! #REF! #REF!
34 #REF!
#REF!
53 #REF!
#REF! #REF! #REF!
54 #REF! #REF! #REF! #REF!
#REF!
55 #REF! #REF!
56 #REF! #REF!
57 #REF!
#REF!
58 #REF! #REF!
(Civil works)
MATERIALS
AGGREG STONE BRICK WOOD RODS OTHER
ATE (CUM) (NO) (CUM) (KGS ) Remarks
(CUM)
#REF!
#REF!
#REF! #REF! mud
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF! Mud
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Binding wire
#REF! #REF! in kg
#REF! #REF! Nails kg
10 mm chips
#REF! cum
porcelian
#REF! tiles sqm
Flag stone
#REF! sqm
Cement
#REF! paint
#REF! Primer Ltr
Enamel
#REF! paint Ltr
CGI Sheet
#REF! Sqm
#REF! Plane Sheet
0 Iron kg
0 Chain sqm
Rolling
0 shutter sqm
0 iron Sqm