You are on page 1of 16

ANNEX ( ) DESIGNS AND DRAWINGS.

PREPARED BY:

UNITED NATIONS OFFICE FOR PROJECT SERVICES


FUNDED BY:

PROJECT.

SUPPLY AND INSTALL OF HYBRID SOLAR SYSTEM FOR


AMRAN HIGH INSTITUTE
AMRAN CITY-YEMEN
PROJECT REFERENCE NO.
IUS-OPS-ECS-AMR-002.2

JUNLY, 2019
REMARKS: - INSTALLING THE CABLE FEEDERS TO THESE BOARDS, CURRENT SYSTEMS & LOW VOLTAGE POWER CABLES IS
1.THE LAYOUT DRAWINGS DO NOT SHOW ALL THE SYSTEMS , HOOKING UP OF EQUIPMENT WILL BE THE SYSTEM SUPPLIER 300MM.
ITEMS, OR ACCESSORIES COVERED UNDER THE SCOPE OF RESPONSIBILITY. .23 THE MAXIMUM FILLING RATIO FOR POWER &
ELECTRICAL WORKS TO BE EXECUTED THE LAYOUT .10 CONDUCTORS FOR SINGLE PHASE SOCKETS OUTLETS COMMUNICATION CONDUITS IN SITE WORK ARE:
DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL CIRCUITS SHALL BE 4MM COPPER CONDUCTORS AND · MIN50. MMD FOR POWER CABLE WITH MAX 40%.
RELEVANT OR SPECIALIST DRAWINGS AND SPECIFICATIONS . PROTECTED BY 16A CIRCUIT BREAKERS UNLESS OTHERWISE OF CONDUIT CAPACITY.
2.DO NOT SCALE FROM THE LAYOUT DRAWINGS WORK INDICATED. · MIN50. MMD FOR LOW CURRENT SYSTEMS WITH
ACCORDING TO ARCHITECTURAL OR ELECTRICAL DETAILS .11 IN THE ABSENCE OF ANY INDICATION ON THE DRAWINGS MAX 40%. OF CONDUIT CAPACITY.
UNLESS OTHERWISE AUTHORIZED . OR THE SPECIFICATIONS, THE INSTALLATIONS SHALL BE .24 ALL C.BS WITH FRAME RATING LARGER THAN 100A
3.ALL EQUIPMENT LAYOUTS ARE PROVISIONAL . FINAL DONE TO THE SATISFACTION OF THE ENGINEER. SHOULD HAVE ADJUSTABLE THERMAL OVERLOAD SETTING.
LAYOUT SHALL BE DETERMINED BY THE CONTRACTOR FROM .12 THE CONTRACTOR SHALL PROVIDE ALL IRON ANGLES, .25 CONTRACTOR SHALL PROVIDE CONTROL CONDUIT &
THE CONSTRUCTION /SHOP DRAWINGS AND AFTER AND FIXING ACCESSORIES REQUIRED FOR COMPLETE WIRING AS PER OPERATIONAL REQUIREMENTS SHOWN ON
COORDINATION WITH OTHER TRADES . INSTALLATION OF LIGHTING FIXTURES, OUTLETS & ROUTES. HVAC AND PLUMBING DRAWING.
4.THE SIZE OF CONDUITS AND /OR CABLE TRAYS IS IN .13 FOR EXACT QUANTITY, TYPE & LOCATION OF ELECTRICAL .26 EXACT METHOD OF JOINING CABLE TRAYS,AND CABLE
GENERAL NOT SHOWN ON DRAWINGS . THE SIZE OF ALL OUTLETS REFER TO INTERIOR DESIGN DOCUMENT. TRUNKING SHALL BE IN ACCORDANCE WITH THE
CONDUITS AND/OR CABLE TRAYS SHALL BE SELECTED BY .14 THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESPECTIVE MANUFACTURERS RECOMMENDATION USING
THE CONTRACTOR IN ACCORDANCE WITH BOQ , MODIFYING THE NO. OF CIRCUIT BREAKERS, RATING, AND PROPER COMPONENT.
REGULATIONS AND /OR STANDARDS AND WILL BE FUNCTION WIRING ACCORDING TO MANUFACTURER DATA WITHOUT .27 GROUNDING TO LOW CURRENT SYSTEMS SHALL BE
OF THE NUMBER AND SIZE OF THE RESPECTIVE ANY EXTRA COST. SEPARATE GROUNDING PIT AND CONNECTED TO BUILDING
CONDUCTORS. .15 ALL DISCONNECT SWITCHES FOR A/C SHALL BE GROUNDING NETWORK.
5.PERFORATED CABLE TRAY SHALL BE FIXED AND COVER ADJACENT TO THE UNIT.. .28 THE DISTANCE BETWEEN EARTH PIT SHALL BE DOUBLE
PROPERLY AND SHALL NOT FIXED DIRECT TO ROOF SLAB . .16 UNLESS OTHERWISE INDICATED MINIMUM SIZE CONDUIT; OR MORE THAN LENGTH OF EARTHING ROD.
6.TEARTH CONTINUITY CONDUCTORS ARE NOT INDICATED · FOR EXTERIOR INSTALLATION IS 25MM DIAMETER .29 THE CONTRACTOR SHOULD PROVIDE COMPLETE
ON THE DRAWINGS , BUT SHALL BE RUN WITH ALL CIRCUITS OR AS SHOWN IN PANEL SCHEDULE. CENTRAL INTERFACE BETWEEN THE SOLAR GENERATION
IN ACCORDANCE WITH SPECIFICATIONS , REGULATIONS · FOR INTERIOR INSTALLATION IS 25MM DIAMETER SYSTEM & GENERATOR SET.
AND/OR STANDARDS OR AS SHOWN IN PANEL SCHEDULE. .30 THE DIMENSION OF ELECTRICAL PANELS AND
7.THE COLOR CODE FOR A FOUR WIRE CIRCUIT IS - ONE .17 CONTRACTOR SHALL PROVIDE MATCHING PLUG IN FOR EQUIPMENT'S SHALL BE AS PER APPROVED FABRICATOR /
BLACK, - ONE RED ONE BLUE AND ONE YELLOW ANY ALL SPECIAL OUTLETS. SUPPLIER SHOP DRAWING.
CONDUCTOR INTENDED FOR GROUNDING PURPOSE SHALL .18 CONTRACTOR RESPONSIBLE FOR CHANGE ALL EXISTING .31 CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALL
BE GREEN WITH YELLOW STRIPE . FLORESCENT TUBE (T) 8LIGHT BY LED TUBE (T) 8INCLUDE SUITABLE VENTILATION SYSTEM IN BATTERY ROOM TO
8.CONTRACTOR RESPONSIBLE TO DISCONNECT ALL WIRING ALL OPERATION ACCESSORIES FOR ALL LIGHTING FIXTURES ASSURING REFRESHING AIR FLOW INSIDE ROOM .
IN EXISTING DISTRIBUTION BOARD AND RECONNECTED IN AS PER BOQ. .32 CONTRACTOR RESPONSIBLE TO DISTRIBUTE ALL
NEW DISTRIBUTION BOARD AS PER SINGLE LINE DIAGRAM .19 LED LAMPS SHALL BE FURNISHED AND INSTALLED IN ALL DISTANCE BETWEEN ALL SYSTEM COMPONENTS INSIDE
9.THE CONTROL AND OR SWITCHBOARDS FOR THE LIGHTING FIXTURES. BATTERY ROOM AS PER MANUFACTURE INSTALLATION
DIFFERENT SYSTEMS SUCH AS THE AIR CONDITIONING .20 ALL OUTDOOR WIRING ACCESSORIES SHALL BE WEATHER INSTRUCTION.
EQUIPMENT MACHINES , ....ETC . WILL BE IN THE SCOPE OF PROOF TYPE.
SUPPLY OF THE SYSTEM SUPPLIER . THE ELECTRICAL .21 FOR GROUND-FAULT CIRCUIT INTERRUPT (GFCI) REFER
CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING AND TO PLANS AND PANEL SCHEDULES.
.22 THE MINIMUM SEPARATE DISTANCE BETWEEN LOW

PREPARED BY: FUNDED BY: PROJECT TITLE: DRAWING TITLE: DESIGN & DRAW BY: STATUS: NORTH: DRAWING NO:
MAIN REMARKS TENDER DOCUMENTS.
.\photos\UNOPS.jpg SUPERVISED & CHECKED BY:

S2-00
AMRAN HIGH INSTITUTE
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-002.2 A3
APPROVED BY:
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY-YEMEN. ELECTRICAL PLAN JULY, 2019 AS SHOWEN.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND
WATER PROOF WATER PROOF
BOX 15CM X 15CM BOX 15CM X 15CM

DC=
AC≈
DC=
AC≈
DC=
AC≈

2RACKS 2RACKS
CONFIRMED ON SITE BEFORE
COMMENCEMENT OF ANY WORK.
AC
SDB1 3/4" PVC PIPE
3. ANY DISCREPANCY TO BE REPORTED TO
COUPLING
PANEL
SCH. 40.
3*4sqmm cable

EMDB
THE UNOPS SITE ENGINEER/ PROJECT
MANAGER PROMPTLY BEFORE
WATER PROOF
BOX 15CM X 15CM
PROCEEDING.
WATER PROOF 3/4" PVC PIPE
BOX 15CM X 15CM SCH. 40.
3*4sqmm cable
4. ALL OUTDOOR OUTLETS, SOCKET OR
NEW UNDERGROUND
CABLE TRENCH 40CM(WIDTH)
WIRING ACCESSORIES SHALL BE WEATHER
AND 60CM (DEPTH) PROOF TYPE.

1X1MTRS.
WATER PROOF
BOX 15CM X 15CM

WATER PROOF
3/4" PVC PIPE BOX 15CM X 15CM
SCH. 40.
3*4sqmm cable

NEW UNDERGROUND
SDB4 CABLE TRENCH 40CM(WIDTH)
AND 60CM (DEPTH)

SDB2

CABLE ROUTING
MAIN DISTRIBUTION
WATER PROOF
MDB BOARD.
1X1MTRS. BOX 15CM X 15CM
WATER PROOF
SWH BOX 15CM X 15CM
3/4" PVC PIPE
SCH. 40.
3*4sqmm cable
OLD SDB

EMERGENCY MAIN
WATER PROOF
BOX 15CM X 15CM EMDB DISTRIBUTION BOARD.
CABLE ROUTING

WALL MOUNTED STREET


LIGHT FIXTURE
SDB3

MTS MANUAL TRANSFER


SWITSH.
3/4" PVC PIPE
SCH. 40. WATER PROOF
3*4sqmm cable BOX 15CM X 15CM
AC COUPLING PANEL
WATER PROOF
BOX 15CM X 15CM

AC≈
HYBRID INVERTER
DC=

MPPT BATTERY CHARGER

BATTERY RACK.

CONNECTION BOX BETWEEN


CHARGE CONTROLLER AND
BATTERY RACK
40 Cm
SWH SOLAR WATER HEATER

60 Cm

30 Cm
5 Cm

PREPARED BY: FUNDED BY: PROJECT TITLE: DRAWING TITLE: DESIGN & DRAW BY: STATUS: NORTH: DRAWING NO:
NEW ELECTRICAL DISTRIBUTION TENDER DOCUMENTS.
.\photos\UNOPS.jpg SUPERVISED & CHECKED BY:

S2-01
AMRAN HIGH INSTITUTE PLAN
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-002.2 A3
APPROVED BY:
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY-YEMEN. ELECTRICAL PLAN JULY, 2019 AS SHOWEN.
AC≈ AC≈ AC≈
DC= DC= DC=

S&H D
2RACKS 2RACKS

CONNECTION BOX
BETWEEN CHARGE
CONTROLLER AND

S&H D
BATTERY RACK

AC≈ HYBRID INVERTER


DC =
MPPT BATTERY CHARGER

BATTERY RACK.

AC COUPLING PANEL

EXHAUST FAN

BATTERY SMOKE & HEAT


S&H D
DETECTOR

FIRE EXTINGUISHER POWDER

FIRE EXTINGUISHER CO2

PREPARED BY: FUNDED BY: PROJECT TITLE: DRAWING TITLE: DESIGN & DRAW BY: STATUS: NORTH: DRAWING NO:
CONTROL ROOM TENDER DOCUMENTS.
.\photos\UNOPS.jpg SUPERVISED & CHECKED BY:

S2-02
AMRAN HIGH INSTITUTE
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-002.2 A3
APPROVED BY:
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY-YEMEN. ELECTRICAL PLAN JULY, 2019 AS SHOWEN.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. ALL OUTDOOR OUTLETS, SOCKET OR WIRING
ACCESSORIES SHALL BE WEATHER PROOF TYPE.
5. ALL DISTANCE BETWEEN SYSTEM COMPONENTS INSIDE
BATTERY ROOM TO BE DISTRIBUTE AS PER MANUFACTURE
INSTALLATION INSTRUCTION.

PHOTOVOLTAIC MODULE

+
_
FROM COMBINER BOX
TO CONTROL ROOM DC-COMBINER
BOX-0X COMBINER BOX

SOLAR SINGLE CORE CABLE


1C X 6 SQ.MM (RED COLOR)

SOLAR SINGLE CORE CABLE


1C X 6 SQ.MM (BLACK COLOR)

SOLAR SINGLE CORE CABLE


_ + _ + _ + _ + _ + _ + 1C X 35SQ.MM (RED COLOR)
_ +

_ +
_ +

_ +
_ +

_ +
_ +

_ +
_ +

_ +
_ +

_ +
SWH SOLAR SINGLE CORE CABLE
1C X 35SQ.MM (BLACK
COLOR)
_ + _ + _ + _ + _ + _ +

_ + _ + _ + _ + _ + _ +

_ + _ + _ + _ + _ + _ +
CABLE TRAY
CABLE TRAY
SWH SOLAR WATER HEATER
DC-COMBINER DC-COMBINER DC-COMBINER
BOX- 01 BOX- 02 BOX- 03

COMBINER BOX

100

50
GI CABLE TRAY
100MM * 50MM

COLD FORMED STEEL


C CHANNEL

ANCHOR
BOLT

NOT TO SCALE.

PREPARED BY: FUNDED BY: PROJECT TITLE: DRAWING TITLE: DESIGN & DRAW BY: STATUS: NORTH: DRAWING NO:
PV MODULES DISTRIBUTION PLAN TENDER DOCUMENTS.
.\photos\UNOPS.jpg SUPERVISED & CHECKED BY:

S2-03
AMRAN HIGH INSTITUTE DETAILS
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-002.2 A3
APPROVED BY:
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY-YEMEN. ELECTRICAL PLAN JULY, 2019 AS SHOWEN.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. ALL OUTDOOR OUTLETS, SOCKET OR WIRING
ACCESSORIES SHALL BE WEATHER PROOF TYPE.
5. ALL DISTANCE BETWEEN SYSTEM COMPONENTS INSIDE
BATTERY ROOM TO BE DISTRIBUTE AS PER MANUFACTURE
INSTALLATION INSTRUCTION.

TO LIGHTNING
ARRESTER
1C*25 SQ.MM

PHOTOVOLTAIC MODULE

+
_
TO EARTHING EARTHING
BUS BAR NO.2 BUS BAR NO.1
1C*16SQ.MM
DC-COMBINER
BOX-0X
COMBINER BOX
LIGHTNING TO EARTHING
EARTHING
PIT BUS BAR NO.2
PIT
1C*25SQ.MM

TO EARTHING
BUSBAR #1

Earth EARTHING PIT


Pit
EARTHING BUS BAR

TO LIGHTNING
EARTHING CABLE
PIT

LIGHTNING ARRESTOR
_ + _ + _ + _ + _ + _ +

_ + _ + _ + _ + _ + _ +

_ + _ + _ + _ + _ + _ +
CABLE TRAY
LIGHTNING
M

M
SQ.M

SQ.M

SQ.M

SQ.M

SQ.M

SQ.M
ARRESTOR.
1C*6

1C*6

1C*6

1C*6

1C*6

1C*6
_ + _ + _ + _ + _ + _ +

_ + _ + _ + _ + _ + _ +

_ + _ + _ + _ + _ + _ +

1C*10SQ.MM

1C*10SQ.MM DC-COMBINER
BOX- 01
DC-COMBINER
BOX- 02
DC-COMBINER
BOX- 03

PREPARED BY: FUNDED BY: PROJECT TITLE: DRAWING TITLE: DESIGN & DRAW BY: STATUS: NORTH: DRAWING NO:
STRINGS AND COMBINERS TENDER DOCUMENTS.
.\photos\UNOPS.jpg SUPERVISED & CHECKED BY:

S2-04
AMRAN HIGH INSTITUTE EARTHING DETILS
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-002.2 A3
APPROVED BY:
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY-YEMEN. ELECTRICAL PLAN JULY, 2019 AS SHOWEN.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. EARTHING PIT SHALL BE CARRY OUT AS BE SITE
ENGINEER INSTRUCTION.

PREPARED BY: FUNDED BY: PROJECT TITLE: DRAWING TITLE: DESIGN & DRAW BY: STATUS: NORTH: DRAWING NO:
EARTHING PIT AND BUSBAR TENDER DOCUMENTS.
.\photos\UNOPS.jpg SUPERVISED & CHECKED BY:

S2-05
AMRAN HIGH INSTITUTE DETAILS
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-002.2 A3
APPROVED BY:
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY-YEMEN. ELECTRICAL PLAN JULY, 2019 AS SHOWEN.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. NEW DISTRIBUTION BOARD SHALL BE INSTALL IN
THE SAME LOCATION OF EXISTING ONE.

MANUAL TRANSFER
HYBRID SOLAR SYSTEM INVERTER OUTPUT SWITSH
SURGE ARRESTER

CIRCUIT BREAKER
(MCCB/MCB)
MTS 100A
CIRCUIT BREAKER (RCB)

AC FUSE
NEW EMDB
MCCB
100A,4P,25KA

RCCB
100A,4P,300mA

63A, 3P 63A , 3P 63A , 3P 63A , 3P 40A , 3P 40A, 3P 32A, 3P 32A, 1P 20A, 1P 10A, 1P
MCB 10kA
MCB, MCB, 10kA MCB, 10kA MCB, 10kA MCB, 10kA MCB 10kA
MCB, MCB
MCB, 10kA MCB
MCB, 10kA MCB 10kA
MCB, MCB, 10kA
CLASS B CLASS B CLASS B CLASS B CLASS B CLASS B CLASS B CLASS B CLASS B CLASS B

SDB1 SDB2 SDB3 SDB4 SPARE SPARE SPARE SPARE SPARE OUTDOOR
LIGHTING

PREPARED BY: FUNDED BY: PROJECT TITLE: DRAWING TITLE: DESIGN & DRAW BY: STATUS: NORTH: DRAWING NO:
SOLAR SYSTEM SINGLE LINE TENDER DOCUMENTS.
.\photos\UNOPS.jpg SUPERVISED & CHECKED BY:

S2-06
AMRAN HIGH INSTITUTE DIAGRAM DETAILS
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-002.2 A3
APPROVED BY:
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY-YEMEN. ELECTRICAL PLAN JULY, 2019 AS SHOWEN.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER

Inside View Front View Side View


PROMPTLY BEFORE PROCEEDING.
4. NEW DISTRIBUTION BOARD SHALL BE INSTALL IN
THE SAME LOCATION OF EXISTING ONE.

MANUAL TRANSFER
SWITSH
SURGE ARRESTER
63A , 10 kA 40A , 10 kA

63A , 10 kA 32 A , 10 kA

63 A , 10 kA 32 A , 10 kA CIRCUIT BREAKER
63 A , 10 kA 20A , 10 kA
(MCCB/MCB)
40 A , 10 kA 10 A , 10 kA

CIRCUIT BREAKER (RCB)

AC FUSE

PUSH

PREPARED BY: FUNDED BY: PROJECT TITLE: DRAWING TITLE: DESIGN & DRAW BY: STATUS: NORTH: DRAWING NO:
NEW EMDB BLOCK DIAGRAM TENDER DOCUMENTS.
.\photos\UNOPS.jpg SUPERVISED & CHECKED BY:

S2-07
AMRAN HIGH INSTITUTE
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-002.2 A3
APPROVED BY:
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY-YEMEN. ELECTRICAL PLAN JULY, 2019 AS SHOWEN.
PV Module Combiner Box Battery Charger
Connection

Total: 0.99Kwp
3 PV MODULE
STR NO.1

_
+
Total: 0.99Kwp
3 PV MODULE
STR NO.2

85A
150 VDC
_
+

1. ALL DIMENSIONS AND ELEVATIONS ARE IN


CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
Total: 0.99Kwp
3 PV MODULE
STR NO.3

2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED


_

ON SITE BEFORE COMMENCEMENT OF ANY WORK.


+

3. ANY DISCREPANCY TO BE REPORTED TO THE


UNOPS SITE ENGINEER/ PROJECT MANAGER
Total: 0.99Kwp
3 PV MODULE
STR NO.4

PROMPTLY BEFORE PROCEEDING.


_

4. NEW DISTRIBUTION BOARD SHALL BE INSTALL IN


+

2(1x35 SQ.mm)
(RED& BLACK) THE SAME LOCATION OF EXISTING ONE.
Total: 0.99Kwp
3 PV MODULE
STR NO.5

PHOTOVOLTAIC MODULE

+
_
_
+

85A AC≈
HYBRID INVERTER
150 VDC XPLE/PVC/CU1.0KV
XPLE/PVC/CU1.0KV
DC=
Total: 0.99Kwp
3 PV MODULE
STR NO.6

4X6 SQ.mm
3X6 SQ.mm

MANUAL CHANGE OVER


_
+

HYBRID SOLAR SYSTEM INVERTER OUTPUT

MPPT BATTERY CHARGER


Total: 0.99Kwp
3 PV MODULE
STR NO.7

XPLE/PVC/CU1.0KV
3X6 SQ.mm
_
+

SURGE ARRESTER

2(1x35 SQ.mm) 2(1x50 SQ.mm)


(RED& BLACK) (RED& BLACK)
CIRCUIT BREAKER (MCB)
Total: 0.99Kwp
3 PV MODULE
STR NO.8

XPLE/PVC/CU1.0KV
2(1x50 SQ.mm) 3X6 SQ.mm
_

(RED& BLACK)
+

2(1x50 SQ.mm) CIRCUIT BREAKER (RCBO)


85A (RED& BLACK)

150 VDC 100A,2P


Total: 0.99Kwp
3 PV MODULE

2(1x50 SQ.mm)
STR NO.10 STR NO.9

(RED& BLACK)
DC FUSE
_
+

Bus Bar 300A POSITIVE & NEGATIVE


Positive & Negative
CONNECTION BOX
Total: 0.99Kwp
3 PV MODULE

2(1x35 SQ.mm)
(RED& BLACK)
_
+

2(1x50 SQ.mm)
(RED& BLACK)
2(1x50 SQ.mm)
(RED& BLACK)

150 A, 2P 150 A, 2P
Battery Rack Battery Rack

1x50 SQ.mm 1x50 SQ.mm

24 Batteries 24 Batteries
2V ,800 Ah 2V ,800 Ah
48 Volt 48 Volt

PREPARED BY: FUNDED BY: PROJECT TITLE: DRAWING TITLE: DESIGN & DRAW BY: STATUS: NORTH: DRAWING NO:
SOLAR SYSTEM SCHEMATIC TENDER DOCUMENTS.
.\photos\UNOPS.jpg SUPERVISED & CHECKED BY:

S2-08
AMRAN HIGH INSTITUTE DIAGRAM
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-002.2 A3
APPROVED BY:
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY-YEMEN. ELECTRICAL PLAN JULY, 2019 AS SHOWEN.
PREPARED BY: FUNDED BY: PROJECT TITLE: DRAWING TITLE: DESIGN & DRAW BY: STATUS: NORTH: DRAWING NO:
MOUNTING STRUCTURE GENERAL TENDER DOCUMENTS.
.\photos\UNOPS.jpg SUPERVISED & CHECKED BY:

S3-01
AMRAN HIGH INSTITUTE SITE PLAN DETAILS.
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-002.2 A3
APPROVED BY:
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY-YEMEN. STRUCTURAL JULY, 2019 AS SHOWEN.
GALV (L)
50x50x3
STAINLESS
STEEL BOLTS ∅8 3mm
E-70 Channel C 80x40x1.25
GROUT
A B

2400
GALVANIZED BASE
PLATE 200x150x4 mm
1.25

80
350
2 2

10
4∅ 10 ANCHOR
GALVANIZED CONCRETE BOLTS 40
C 80x40x1.25 14cm LENGTH
FOR ALL POSTS
350 Channel C 60x30x1.25

2900
2 BASE PLATE - PLAN
STRUCTURE DETAILS

60
1.25
4∅ 10 ANCHOR
CONCRETE BOLTS

30
14cm LENGTH CONCRETE WITH
GALVANIZED EPOXY GROUT
BASE PLATE
1 1 4 mm THICK
GALV (L)
50x50x3 MASTER
SEAL 470
ROOF TILES RSH 43 in DN

100
120
A B CEMENT
MORTAL 1.5mm
in
EXISTING 3/4
MASTER FLOW ROOF SLAB
GROUT
932 AN(EPOXY)

1 ANCHOR BOLTS PLAN CONNECTION - SEC - DETAILS


STRUCTURE DETAILS 3 STRUCTURE DETAILS

PREPARED BY: FUNDED BY: PROJECT TITLE: DRAWING TITLE: DESIGN & DRAW BY: STATUS: NORTH: DRAWING NO:
MOUNTING STRUCTURE ANCHOR TENDER DOCUMENTS.
.\photos\UNOPS.jpg SUPERVISED & CHECKED BY:

S3-02
AMRAN HIGH INSTITUTE POLTS PLAN PLAN DETAILS.
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-002.2 A3
APPROVED BY:
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY-YEMEN. STRUCTURAL JULY, 2019 AS SHOWEN.
A B
A B
350 2400 350
2 2
2 2
C (60x30x1.25)

C (60x30x1.25)
C 80x40x1.25

C 80x40x1.25
C (60x30x1.25)

C (60x30x1.25)

1 1 1 1
A

1 FULL FRAMING PLAN


A STRUCTURE DETAILS B
A B
2 PV PANELS PLAN

PREPARED BY: FUNDED BY: PROJECT TITLE: DRAWING TITLE: DESIGN & DRAW BY: STATUS: NORTH: DRAWING NO:
MOUNTING STRUCTURE TOP VIEW TENDER DOCUMENTS.
.\photos\UNOPS.jpg SUPERVISED & CHECKED BY:

S3-03
AMRAN HIGH INSTITUTE PLAN DETAILS.
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-002.2 A3
APPROVED BY:
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY-YEMEN. STRUCTURAL JULY, 2019 AS SHOWEN.
GALV (L) SECTION
GALV (C) SECTION
(40x40x3) mm
(60x30x1.25) mm
4 STAINLESS
2 STAINLESS STEEL BOLTS ∅6
STEEL BOLTS ∅6

420
50 860 DETAIL A
4 STAINLESS
420
420 STEEL BOLTS ∅8

860
420

2 JOINT - DETAIL A
STRUCTURE DETAILS
RSH 43 in DN,
1.5mm THICK C 80x40x1.25

DETAIL B

GALV RSH 43 in DN,


1 2 1.5mm THICK

2 STAINLESS
SIDE SECTION A-A STEEL BOLTS ∅8
1 STRUCTURE DETAILS

3 JOINT - DETAIL B

PREPARED BY: FUNDED BY: PROJECT TITLE: DRAWING TITLE: DESIGN & DRAW BY: STATUS: NORTH: DRAWING NO:
MOUNTING STRUCTURE SIDE VIEW TENDER DOCUMENTS.
.\photos\UNOPS.jpg SUPERVISED & CHECKED BY:

S3-04
AMRAN HIGH INSTITUTE PLAN DETAILS.
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-002.2 A3
APPROVED BY:
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY-YEMEN. STRUCTURAL JULY, 2019 AS SHOWEN.
DETAIL B

DETAIL A

L25X1.25

BACK ELEVATION
1 STRUCTURE DETAILS

2 1
C 80x40x1.25
GALV (L25x1.25) 2 08mm

PL 3mm
L25x1.25
2 08mm
JOINT - DETAIL A 3 JOINT - DETAIL B
2 STRUCTURE DETAILS STRUCTURE DETAILS

PREPARED BY: FUNDED BY: PROJECT TITLE: DRAWING TITLE: DESIGN & DRAW BY: STATUS: NORTH: DRAWING NO:
MOUNTING STRUCTURE TOP VIEW TENDER DOCUMENTS.
.\photos\UNOPS.jpg SUPERVISED & CHECKED BY:

S3-05
AMRAN HIGH INSTITUTE PLAN DETAILS.
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-002.2 A3
APPROVED BY:
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY-YEMEN. STRUCTURAL JULY, 2019 AS SHOWEN.
A 2

B 1
3D VIEW
1 STRUCTURE DETAILS

PREPARED BY: FUNDED BY: PROJECT TITLE: DRAWING TITLE: DESIGN & DRAW BY: STATUS: NORTH: DRAWING NO:
MOUNTING STRUCTURE 3D PLAN TENDER DOCUMENTS.
.\photos\UNOPS.jpg SUPERVISED & CHECKED BY:

S3-06
AMRAN HIGH INSTITUTE DETAILS.
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-002.2 A3
APPROVED BY:
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY-YEMEN. STRUCTURAL JULY, 2019 AS SHOWEN.

You might also like