INITIAL RISK

HAZARD IDENTIFICATION CONTROL MEASURES ACTION RESIDUAL RISK (R)


EVALUATION
TASK STEPS
Consequenc Severit Likelihoo Risk Sign Likelihoo Risk
Hazard Description e y d List all Controls Required SPA Off
Severity
d Rating
Rating

Well-designed standard
Working at height > scaffold be erected to facilitate
1.8m: There is potential L3 accessibility to work location
for falling ‫تصميم جيد للسقالة يسمح بسهولة‬
/ Dropped Objects .‫الوصول لموضع العمل‬
from height Certify Scaffolds by inspector
L5
‫فحص السقالة بواسطة الشخص المؤهل‬
Close monitoring by competent
L5 supervisor
‫المراقبة الدائمة بواسطة المشرف‬
Caution tape around working
area about…….m.
Not allowed for pedestrian to
Work at height walk under /beside working
Permanent area
Using scaffolds
G J /partial C 3 8 Not allowed to work in below E 2 4
disability L5 levels
‫وضع شريط تحذيري حول مكان العمل‬
‫متر‬......‫علي بعد‬
‫عدم السماح للمارة بالمرور داخل منطقة‬
‫العمل‬
‫عدم السماح بالعمل علي السقالة أسفل‬
‫مكان العمل‬
Use Personal fall-arrest
systems (double lanyard
harness) connected to a lifeline
fixed above the workers)
L6
Wear steel-toe shoes
‫ارتداء حزام األمان وتعليقه في مكان‬
‫أعلي العامل‬
‫ارتداء حذاء األمان منعا لالنزالق‬