GAMBAR PELAKSANAAN

KONSTRUKSI SUMUR BOR LOKASI JAWA BARAT

WELL HEAD

TANAH TANAH Permukaaan Sumur 0 Meter

Lubang Sumur Bor Ø 12 inc

Grouting Cement

Pipa GIP Ø 2 inc (Pipa Hantar)

Pipa PVC Ø 6 inc

Pompa Submersible ( 3 PK)


GRUNDFOS SP 5A-25 3 phase

Gravel Pack (Kerikil Jagung)

kedalaman 60 m
Pipa Screen Low Carbon Ø 6 inc
kedalaman 63 m

kedalaman 72 m

Pipa Screen Low Carbon Ø 6 inc

kedalaman 91 m

Ilustrasi Air Sumur


kedalaman 113

kedalaman 122 Pipa Screen Low Carbon Ø 6 inc

Kedalaman Sumur 125 Meter


BOTTOM PLUG