Professional Documents
Culture Documents
Gambar : 4
POLITEKNIK NEGERI TEKNIK SIPIL GEOMETRIK JALAN
UJUNG PANDANG D3 / 2A TEKNIK Digambar Oleh :
Skala : 1:5000
tikungan ii
JURUSAN KONSTRUKSI JALAN DAN
TEKNIK SIPIL JEMBATAN FADILAH AL QIBTIYAH MAHARANI SASKIA A.P. IR. ANDI ERDIANSA, M.T.
312 18 008 312 18 013 19620926 199003 1 001 Tanggal
978
2500
1030
1000
2000
S-C-S
NO Pi.4
VR 30 km/jam
90
67.50°
θs 1.91°
0
U Rc
Es
300 m
60.87 M
Ts 210.49 m
L 373.25M
LC 333.25 m
1005
e
Ls
2.000
20 m
B
p 0.06 M
k 10.00 M
Xs 19.99778 m
Rc=300.00
1000
1500
1°
θs:1.9
67
.5
950
0°
Es
.6
0.8
7
S-C-S
990
sta 0+100
A NO
VR
Pi.3
30 km/jam
θs
27.99°
2.05° PI.4
Rc 280 m
Es 8.63 M 0m
Ts 79.80 m K.10.0
99m
Xs.19.
L 156.72M .49m
LC Ts.210
116.72 m
S-C-S e 2.000
NO Pi.2
Ls 20 m
VR 30 km/jam
58.70°
p 0.06 M
915
18°
960 θs
Rc
3.28°
175 m
k
Xs
10.00 M
19.99745 m 910
905
900
Es 25.88 M
θ s: 3.
900
Ts 108.46 m
L
LC
199.20M
895
159.20 m
PI.3
.27.
e 2.575
99
Ls 20 m
°
p 0.10 M 0m
k 10.00 M 9.8
.7
Ts
0m
Es.
Xs 19.993 m
0.0
8.63
K.1
S-C-S
m
m
9
NO Pi.1 9.9
.1
VR 30 km/jam Xs
Rc
5°
=1
97.36° : 2.0
75
θs
0.00m
PI.1
.0
θs 3.18° 9°
0m
Rc 180 m 3.2
θs:
Rc=18
m
Es 92.76 2.76
Es.9
Ts 214.851 m
1000
L 325.71M 36 ° m
:97. m 93
LC 285.71 m 0 9.9
0.0 s.1
e 2.500
K.1 X 865
Ls 20 m
Ts.214
Rc
p 0.09M
860
.85m K.10.0
=2
k 0m m
80
10.00 M Xs.19 6
.0
.99 m 8.4
855
0m
Xs 19.994 M 0
.1
PI.2
Ts
Es.25.
:58.70
850
88m
°
850
825
980
820
815
500
825
16°
800
980
d1