1 Excavation
2 Excavation ancillaries
3 Filling
4 Filling ancillaries
5 Landscaping
MEASUREMENT RULES DEFINATION RULES COVERAGE RULES ADDITIONAL
DESCRIPTION RULES
M1 The quantities of D1 Earth shall be deemed C1 Items for excavation A1 The commencing
earthwork shall be to be materials orther thab shall be deemed to include surface and excavated
computed net using topsoil, natural hard disposal of excavated surface is not the original
dimension from the drg material, rock, artificial material, unless otherwise surface.
with no allowance for hard material, unless stated.
bulking, shrinkage, or otherwise stated in item A2 Item description for
wastage. description. artificial hard material
shall describe the material,
M2 The Commencing D2 Natural hard material and depth to which extent
Surface adopted in the shall be material other it shall be excavated.
preparation of the BQ shall than rock and artificial
be use for the hard material that require A3 Item description for
measurement of the ripping and other excavation in rock shall
completed work. specialised equipment. state the method of
blasting and wheter for
D3 Rock and artificial hard reuse or disposal.
material shall be material
that require the use of A4 Item description for
either hydraulic rock excavation in natural hard
breaker, pneumatic tools, material and rock shall
or explosives. state the method of
excavation, where
D4 Disposal of excavated appropriate.
material shall be deemed
to be disposal off the site,
unless otherwisenstated in
1 2
item description.
FIRST DIVISION SECOND DIVISION THIRD DIVISION UNIT
1 Excavation 1 Stripping 1 Topsoil m2
M15 Double handling of excavated material shall be A15 Item description for
measured, only to the extent that it is expressly required. excavation ancillaries in
M16 The volume measured for double handling of connection with
excavation by dredging
excavated material shall be that of the void formed in the
shall be so described.
temporary stockpile from which the materials are removed.
4 To structures m3
5 Below water m3
MEASUREMENT RULES DEFINITION COVERAGE ADDITIONAL
RULES DESCRIPTION
M18 All filling shall be measured net. Excavation after D8 Excavated C9 Items for filling A16 Item
filling shall only be measured where it is expressly material shall shall be deemed to description for
required. be deemed to include compaction filling using
M19 Excavation from borrow pit on the site for filling, be from cut, or imported material
shall not be measured, unless expressly required. from borrow C10 Items for filling and excavated
M20 The volume of imported material measured pit on the site. shall be deemed to material shall state
shall be the difference between the net volume of include additional the type, gradation
excavated material derived from work within this D9 Imported filling necessitated limit, and size,
class. material shall by settlement or where applicable.
M21 The volume of imported fill shall be measured be deemed to penetration into
net at the place of fill. be material underlying material A17 Item
M22 Backfill material for excavation to remove from off site description for
unsuitable material shall be measured as filling under C11 Items for filling filling using mass
item for filling for replacement. to embankments or concrete shall
M23 When rock is deposited into soft areas, the on sloping ground state the grade of
volume shall be measured as in the transport vehicle shall be deemed to concrete.
at the place of deposition. include benches.
MEASUREMENT RULES DEFINITION RULES COVERAGE RULES ADDITIONAL
DESCRIPTION RULES
M24 Filling of excavation around
completed structures shall be
measures nett between the volume
of excavation under rule M7 and
the completed structure measured
from the commencing surface
M27 Measurement for spot D10 The girth of C12 Items for landscaping A19 Item description for
turfing shall include the areas trees shall be shall be deemed to include landscaping shall state the
of unturfed space between measured from digging, planting media, species of the turfing,
sods. ground level to bedding, stalking, hydroseeding, hedges, and trees
M28 The area of turfing and one-third height protection, watering, required.
hydroseeding shall be the area of the trees or weeding, required A20 Item description for turfing
to the slope, if applicable. 1m from ground fertilizing, and replacement shall state the type of turfing
M29 Ungrown areas of turfing level, whichever of dead items until the (close or spot).
and hydroseeding exceeding 1 is lower. vegetation is established. A21 Item description for
m2 shall not be measured. C13 Turfing on slopes hydroseeding shall state the
M30 The lengths of hedges D11 The height steeper than 1 (vertical) technical specification for
measured shall be their of trees shall be and 3 (horizontal) shall be hydroseeding.
developed lengths along the measured from deemed to include pegging A22 Item description for bio-
centre line. ground level to down with stakes. degradable erosion control
the lowest blanket shall state the location
M31 The area of bio- branch or C14 Items for bio- and the spacing of the fastening
degradable erosion control crown, degradable erosion control hook.
blanket shall be measured net whichever is blanket shall be deemed to A23 Item description for trees
and no allowance shall be lower include fastening hooks and shall state the minimum girth
made for laps. netting required. and height.
Item Code Description Unit Qty Rate Amount
F500 LANDSCAPING
Items for landscaping shall be deemed to include
digging, planting media, bedding, stalking,
protection, watering, weeding, required C12
fertilising, and replacement of dead item until the
vegetation is established.
F510.1 Spot turfing to flat areas. A20 m2
F510.2 Close turfing to slopes. Rate to include pegging m2 C13 & A 20
down with stakes.
F520.1 Hydroseeding as per Specification clause (….). m2
F520.2 Hydroseeding with fibromat or equivalent. m2 A21
F530 Bio-degradable erosion control blanket to slope of m2
embankment with fastening hook at […mm]
spacing. Rate to include fastening hook and C14 & A22
netting.
F540 Vertiver grass or equivalent at 250 mm spacing (in m
group of 3 rows).
F550 Trees of the (….) species with minimum girth of nr
200 mm and 3 m tall. A23