AC VOLTAGE WITHSTAND TEST

Document :
UNDERGROUND XLPE CABLE
Test Report
150kV
PT. RAGAT SARANA TEKNIK Date Issued :
Test Procedure July 21, 2019

NO PAGE
DESKRIPSI
TABLE OF CONTENTS
1
1 TITLE 3
2 SCOPE 3

3 OBJECTIVE 3

4 REFERENCE 3
5 RISK AND SAFETY PRECAUTION 3

6 TEST ITEM 3
7 TEST PROCEDURE AND SQUENCE 3-4

1
Page
AC VOLTAGE WITHSTAND TEST
Document :
UNDERGROUND XLPE CABLE
Test Report
150kV
PT. RAGAT SARANA TEKNIK Date Issued :
Test Procedure July 21, 2019

1. TITLE
XLPE CABLE 150 KV AC WITHSTAND TEST

2. SCOPE
- CABLE 150 KV AC WITHSTAND TEST
- INSULATION RESISTANCE TEST

3. OBJECTIVE
This is to assure that the requirements of electrical individual test works are meets the
codes requirements and contract specifications. To make sure, the works are carried out
acceptable workmanship and follow the requirements in the quality manual.

4. REFERENCE
4.1 Reference Manual
4.2 Applicable Manufacturers Manuals/Standards
4.3 Contract Specifications and Construction Drawing
4.4 Standard for hand-over test of electric equipment installation engineering
( GB Standard 50150-2006 ).

4.5 Withstand voltage tests on cable 150 kV can be performed using the AC test system with
variable frequency once laid on-site. The test system operates in a frequency range from
20 Hz to 300 Hz and complies with the requirements according to IEC 60840 and IEC
62067.

5. RISK AND SAFETY PRECAUTION


5.1 Everyone must wear safety helmet when come into construction site and tie safety
5.2 High voltage testing area should be circled by rail with warning board (police line) and
make special person to watch.
5.3 If happen anything abnormal, the testing must be stopped, and strengthen test
warding
5.4 Clean all tools and instruments, prevent something to leave on instrument after test; if
some wires are changed, it need be restored after test.
2
Page
AC VOLTAGE WITHSTAND TEST
Document :
UNDERGROUND XLPE CABLE
Test Report
150kV
PT. RAGAT SARANA TEKNIK Date Issued :
Test Procedure July 21, 2019

6. TEST ITEM
6.1 Visual Inspection
6.2 Insulation resistance test
6.3 Cable 150 kV AC Voltage Withstand Test

7. Test Procedure
7.1 Conditioning before testing
7.1.1 All earting switches of the circuit being tested are opened position
7.1.2 All adjacent portions are insulated and grounded
7.1.3 If VT’S are designed for UGC test voltage, one side of the secondary winding has
to be conected to earth and wiring to local cubicle has to be disconnected
7.1.4 If VT’S not designed for UGC test voltage are removed or insulated by opening of
a disconector
7.1.5 The secondary winding of all current transformer must be shorted and grounded
7.1.6 Surge arrester / lightning arrester are disconected from cable
7.1.7 Power transformers are isolated from the cable and conected to ground
7.1.8 Cable box (if available) are isolated conected to ground at one side.
7.1.9 All work on the cable channel are interrupted and staff is warned that test
Will be carried out

7.2 AC Voltage Withstand Test


7.2.1 Precaution
 Insulation resistance
Use 5000V insulation resistance tester, record the environment temperature
and moisture while measuring, the value should be not less than 1MΩ/kilo Volt
in normal temperature condition.
Insulation resistance must be measured before and after applied voltage test

7.2.2 Test Voltage ( Specification )


Test Voltage : 150 kV
Test Frequency : 30 – 300 Hz
Test Duration : 1 Hour at test voltage
3
Page
AC VOLTAGE WITHSTAND TEST
Document :
UNDERGROUND XLPE CABLE
Test Report
150kV
PT. RAGAT SARANA TEKNIK Date Issued :
Test Procedure July 21, 2019

7.2.3 Voltage Sequence


During voltage is being applied, insulation must not breakdown

Test Voltage 150 kV

kV

Test duration
60 minute

Time

7.2.4 Aplication / Test circuit

Power Excitation Reactance


control Transformer 50 150 kV 450 KVA Voltage divider
50 kW kVA 300 kV

Control
Cable
system
Under tested
4