Dear Sir,

Following is the BOP Day Shift Report for 31th January 2021;

UNIT LP PG

Event
Event Description
Nature

Unit is standby. Unit is standby.

Well water pump-1F is Well water pump-2F is


directly lined up for filtered directly lined up for filtered
water basin filling. water basin filling.
General Fire Fighting Pump A & B
CW strainer cleaning done.

Hydrogen building area


housekeeping carriedout

Filtered water basin LCV is Filtered water basin LCV is on


on manual mode and full manual mode and full open.
open.
Service water pump-2C is in
Fire Fighting Pump A & B service.
CW strainer cleaning done.
Pump Potable water pump-2B is in
House service.
Both diesel engine firefighting
pumps & Jockey pumps are
on auto mode.

Service water pump-1C is in


service.
System is standby. System is standby.
Demin Demin tie is open. Note: RO Inlet valve is in
System closed position due to Hypo
dozed into FWB.

Cooling System is standby. System is standby.


Tower

Blow-Down Blow down basin level is Blow down basin level is


Basin normal. normal.

Solar area round carried out.


Solar Area
Solar generation for the day was 4148 KWh.

Duty Compressor is B.

Rectifier load is at 1000 amperes.


H2 Plant
Hydrogen Storage bottle’s pressure is 110 kg/cm2.
System
05m3 H2 filled at LP.

Compressor moisture separator vessel was drained.


Equipmen Nil RO booster pump-2B for high
t under vibration issues.
Tag Out

   Regards;

Aamir ilyas/ M Kamran


 