Following is the BOP Day Shift Report for 31th January 2021;
UNIT LP PG
Event Event Description Nature
Unit is standby. Unit is standby.
Well water pump-1F is Well water pump-2F is
directly lined up for filtered directly lined up for filtered water basin filling. water basin filling. General Fire Fighting Pump A & B CW strainer cleaning done.
Hydrogen building area
housekeeping carriedout
Filtered water basin LCV is Filtered water basin LCV is on
on manual mode and full manual mode and full open. open. Service water pump-2C is in Fire Fighting Pump A & B service. CW strainer cleaning done. Pump Potable water pump-2B is in House service. Both diesel engine firefighting pumps & Jockey pumps are on auto mode.
Service water pump-1C is in
service. System is standby. System is standby. Demin Demin tie is open. Note: RO Inlet valve is in System closed position due to Hypo dozed into FWB.
Cooling System is standby. System is standby.
Tower
Blow-Down Blow down basin level is Blow down basin level is
Basin normal. normal.
Solar area round carried out.
Solar Area Solar generation for the day was 4148 KWh.
Duty Compressor is B.
Rectifier load is at 1000 amperes.
H2 Plant Hydrogen Storage bottle’s pressure is 110 kg/cm2. System 05m3 H2 filled at LP.
Compressor moisture separator vessel was drained.
Equipmen Nil RO booster pump-2B for high t under vibration issues. Tag Out