You are on page 1of 3

SSE SHEET PILE ANALYSIS SSE-EXCEL-SECTION

Ref: Principle Foundation Engineering by Braja M. Das 9ed The author will not be responsible for the uses of this program
v1.07
1. Inputs 2
zSoil: -9 m level for excavated soil Job: Braja 18.14
A
zw= -3 m water level (<-L if absent of water)
0 0.00
w e Material for sheet pile: Jacking/Anchor F: -16 -11 -6 -1 4 1.5 9 14
c= 41 41 kPa fs= 172 Mpa F= 1 0) no 1) yes 0.26
L1=3 6.3 F=7.39t
j= 35 35 deg. Options: z= -1.5 m level -2
g= 1.7 1.7 t/m3 Pressure= 1 0) No, 1) shown depth= 7 m (for chart) water table C 1.38
gsat= 2 2 t/m3 BMD= 1 0) No, 1) shown l= 8 m length of grouting-4 7 Clay (41;35)
F=7.86t
SFD= 1 0) No, 1) shown d= 0.4 m width of grouting P=15.34t
gw= 0.98 t/m3 Scale= 0.5 scale to chart a= 20 deg LD=10.53 -5.25
-6 -16.33 L=11.3
L2=6 8
q= t/m2 surcharge Label= 2 1) all 2) Max/Min
H= t horizontal load at top of wall 3.22
>> CAL -8 E
FoS= 1 safety factor for Kp, (=1.5 to 2)
fct= 0 safety factor to depth of embedment (0=auto) -7.84
-5.19 F D 3.04
>> PDF -10 D=1.53
D1=2.3
2. Design -5.19 -5.19 B
w e Tieback (Ghaly, 1997 as cite in Braja 9ed) -12 Clay (41;35)
soil= Clay Clay Fult= 4.86 t =pi*d*l*p0*K*tan Φ, K=K0 for sand
Ka= 0.27 0.27 =tg^2(45-j/2) Fult= 275 t =pi*d*l*ca, ca=2/3cu for clay LEGENDS:
Kp= 3.69 3.69 =(1/Ka)/FoS -14 BMD in Curve (t.m)
pi(A)=H+Ki.g.hi Soil Pressure (t/m2)
yE=yD-pD/(g'*(Kp-Ka)) ztrapez=(2*a+b)/(a+b)*L/3 -16 soil(c,Φ)
Table: wall pi=intergral of (K*g*hi) t/m2 t m t.m Results:
Pos. x z hi gs g' Ki q pi. Pi zi/E Mi Kp z hi pi.pf. pi pf. z= 3.22 m =M/P from E downward
A 0 0 0 1.7 1.7 0.27 0 0.00 0 9 0 3.69 0 0 0 0 0 0 p5= 41.4 p5=intergral of (K*g*hi) till E
C 0 -3 3 1.7 1.7 0.27 0 1.38 2.07 7 14.5 3.69 -3 3 1.38 1.38 1.38 1.38 A1= 12
=p5/(g*(Kp-Ka))
D 0 -9 6 2 1.02 0.27 0 3.04 13.3 2.63 34.8 3.69 -9 6 3.04 3.04 3.04 3.04 A2= 35
=8*P/(g*Kp-Ka)
E 0 -9 0 2 1.02 0.27 0 3.04 0 0 0 3.69 -9 0 3.04 3.04 -5.2 -5.2 A3= 484 =6*P*[2*z*g*(Kp-Ka)+p5]/(g^2*(Kp-Ka)^2)
F 0 -9.9 0.9 2 1.02 -3.4 0 -0.10 0 0 3.42 -9 0 3.04 3.04 -5.2 -5.2 A4= 1086 =P*(6*z*p5+4*P)/(g^2*(Kp-Ka)^2)
B 0 -11 0.63 2 1.02 -3.4 0 -2.3 -7.9 0 3.42 -11 1.53 -2.3 43 -5.2 -5.2 L4= -0.5 =yE-yB
0 28 2 P(A to E)= 15.3 M= 49.3 -11 xmax= 16 equ0= -54
=L4^4+A1*L4^3-A2*L4&2-A3*L4-A4 & (18.72)
6 F(A to B)= 7.4 t hF=L4-L5 xmin= -5.2 p4= 43
t/m2 =p5-g*L4*(Kp-Ka)
yc=max(BL,we) Fa= 7.9 t =F/cos(a) hB=L5 L5= 0
m =(p3*L4+2*P)/(p3-p4)
Chart z pi pf. D= 1.53 m =deep to anchore L3+L4, L3=hE
Penetration into clay: clay: A 0 0 0 L= 11.3 m =total length of sheet pile =BL+fct*D
D= 1.53 m goalseek z0= 2.96 m =P/p6 C -3 1.38 1.38 fct=1.3 for sandy clay, 1.5 for clay soil
equ1= 0 (18.48) (18.88) Sum moment/O' Mmax= 72 t.m =P*(z+z0)-p6*z^0^2/2 D -9 3.04 3.04 z0= 2.96 m =sqrt(2P/(g*(Kp-Ka)) where shear is zero
L4= -0.5 m =(D*(4c-(ghi+gh2))-P)/(4c) Wpl= 4186 cm3 =Mmax/(fs) E -9 -5.2 -5.2 Mmax= 72 t.m =P*(z+z0)-(1/2*g*z^2*(Kp-Ka)))*z0/3
p6= -5.2 t/m2 =-(4c-(gh1+gh2+q)) F -9 -5.2 -5.2 Wpl= 4186 cm3 =Mmax/(fs)
p7= -5.2 t/m2 =(4c+(gh1+gh2+q)) B -11 -5.2 -5.2 Select Sheet Pile Type in table 18.1
y= -11 variable to run (y=0 from top of wall) Table 18.1
Table CAL M Type: H L f w Wp Wp I
p1 p2 hi p1, dp c d a b Mc Md Ma Mp1 Mc3 Md4 Ma5 Mdp Mt V (mm) (mm) (mm) (mm) (m3/m)(cm3/m)(m4/m)
0 1.38 3 0 1.38 0 -11 0 -11 0 0 0 0 0 0 0 0 0 0 PZC-12 318 708 8.51 8.51 0.00 1204 0
1.38 3.04 6 1.38 1.66 3 -14 0 -14 0 0 0 0 0 0 0 0 0 0 PZC-13 319 708 9.53 9.53 0.00 1301 0
3.04 -5.2 0 3.04 -8.2 9 -20 0 -20 0 0 0 0 0 0 0 0 0 0 PZC-14 320 708 10.7 10.7 0.00 1398 0
-5.2 -5.2 0 -5.2 0 9 -20 0 -20 0 0 0 0 0 0 0 0 0 0 PZC-17 386 635 8.51 8.51 0.00 1667 0
-5.2 -5.2 1.53 -5.2 0 9 -20 0 -20 0 0 0 0 0 0 0 0 0 0 PZC-18 387 635 9.53 9.53 0.00 1801 0
Sum= 0 0 PZC-19 389 635 10.7 10.7 0.00 1941 0
MF= 0 0 PZC-26 450 708 15.2 13.3 0.00 2602 0
M/V= 0 0 PZ-22 235 559 9.53 9.53 0.00 989 0
0 D= -20 at M=0 PZ-27 307 457 9.53 9.53 0.00 1667 0
PZ-35 384 575 15.4 12.7 0.00 2629 0
PZ-40 417 499 15.2 12.7 0.00 3295 0
PS-27.5 — 500 — 10.2 0.00 102 0
PS-31 — 500 — 12.7 0.00 102 0

Data Table My=f(y)


no. 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
y 0 0.53 1.05 1.58 2.11 2.63 3.16 3.69 4.21 4.74 5.27 5.79 6.32 6.85 7.37 7.9 8.43 8.95 9.48 10 10.5 Max= 0.26 -16
M= 0 0 0.06 0.26 -0 -3.5 -6.8 -9.8 -12 -14 -15 -16 -16.3 -16 -15 -14 -12 -9.4 -6.4 -2.9 -0.8 -0.1 0.26 -16 Max= 6.30 -7.8
V= 0 0 -0.4 -0.7 6.3 5.94 5.57 4.97 3.8 2.64 1.47 0.31 -0.85 -2 -3.2 -4.3 -5.5 -6.7 -7.8 -5.5 -2.7 0.01 y= -1.1 -5.8 6.3 -7.8
y= -1.6 -9
0 -0.5 -1.1 -1.6 -2.1 -2.6 -3.2 -3.7 -4.2 -4.7 -5.3 -5.79 -6.3 -6.8 -7.4 -7.9 -8.4 -9 -9.5 -10 -11 scale= 0.13 -8.2
scale 0 0.03 0.13 -0 -1.7 -3.4 -4.9 -6.1 -7 -7.7 -8.1 -8.17 -8 -7.6 -6.9 -5.9 -4.7 -3.2 -1.5 -0.4 -0 scale= 3.15 -3.9
scale 0 -0.2 -0.4 3.15 2.97 2.79 2.48 1.9 1.32 0.74 0.16 -0.43 -1 -1.6 -2.2 -2.8 -3.3 -3.9 -2.7 -1.4 0
Label 0.0 0.1 0.3 0.0 -3.5 -6.8 -9.8 -12.2 -14.0 -15.3 -16.1 -16.3 -16.0 -15.2 -13.8 -11.9 -9.4 -6.4 -2.9 -0.8 -0.1
0.0 -0.4 -0.7 6.3 5.9 5.6 5.0 3.8 2.6 1.5 0.3 -0.9 -2.0 -3.2 -4.3 -5.5 -6.7 -7.8 -5.5 -2.7 0.0
72 3 21

Data Table Mmax = f(water table level) max


w 0 -1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -9
-72 -42 -53 -62 -72 -82 -93 -106 -124 -153 -214 -214 -214 -214 -214 -214

soil
-100 -9 L1 L1=3 P P=15.34t L3 F F=7.39t
0 -9 -14 0 0 -5.78 -13 -9 0 -1.5
-14 -1.5 15.3 -5.78 -13 -9 7.39 -1.5
0 0 -14 -3 -13 -9
100 0
Clay (41;35) -12 -11 L2 L2=6 D D=2 L4 L4=-0.5 Fa F=7.86t
Clay (41;35) 12 -4.5 -14 -3 -14 -9 -11 -9 0 -1.5
-14 -6 -14 -9.8 -11 -9.8 7.39 -4.2
water -14 -9 -14 -11 -11 -11
-100 -3 -14 -11 LF 1.5
0 -3 z 3.22 0 -11 y 4.8 0
14.4 -5.78 -100 11.5 4.8 -0.8
0 -3 14.4 -7.4 L L=11.3 100 11.5 4.8 -1.5
100 -3 14.4 -9 10.7 0
-6 -3 14.4 -9 10.7 -5.6 H H=t LF 7.5
0 -9 10.7 -11 0 100 4.8 -1.5
q 100 0 10.7 -11 0 100 4.8 -5.3
100 0 15.3 -5.78 -11 -11 4.8 -9
100 0 14.4 -5.78
100 0 D D1=2 Anchor LD=6.63
-11 -9 0 -1.5
-11 -10 6.58 -3.9
-11 -11 14.1 -6.6

L0 L0=-11.48 LD LD=10.53 dim 7


9.67 0 -12 0 -0.3 -2.4
9.67 5.74 -12 -5.3 2.95 -3.6
9.67 11.5 -12 -11 6.24 -4.8

dim 8
6.24 -4.8
9.99 -6.2
13.8 -7.6