Professional Documents
Culture Documents
4 LPP - 40 - A04 - CS - 204 - R Civil Work Calculation for Coal Run-off Pond & Pump A4 1 IFA Issued Viola DONE
6 LPP - 40 - A04 - CS - 208 - R Civil Work Calculation for Ash Run-off Pond A4 1 IFA Isu debit yang salah ada follow up dari process? Retta arivenda: target submit?
5 LPP - 0 - A09 - DW - 205 - R Road & Pavement Ash Yard Area A3 1 IFI Ok akan dibuat max minggu depan Retta arivenda: target submit?
11 LPP - 0 - A09 - DW - 222 - R Sewer and Drainage Ash Yard Area A3 1 IFI Ok akan dibuat max minggu depan Retta arivenda: target submit?
28 LPP - 0 - A11 - DW - 228 - R Pipe Rack 1 A3 1 IFA Delete Alyssa Saya (Fitra) pakai untuk steel PR-4 ya
29 LPP - 0 - A11 - DW - 229 - R Pipe Rack 3 - Steel Structure Plan View A3 1 IFA Nunggu GA Steel dari TEKLA Fitra
1 LPP - 10 - A04 - DW - 215 - R Boiler Chemical Injection Shelter Foundation A3 1 IFA Ga jadi shelter kan? Hanya slab kemarin Alyssa arivenda: delete? --> delete (foundation pakai no LPP-10-A04-DW-220)
2 LPP - 10 - A06 - DW - 201 - R Boiler Chemical Injection Shelter Steel Framing Plan Member Schedule A3 1 IFA Ga jadi shelter kan? Hanya slab kemarin Alyssa arivenda: delete? --> buat steel drawing BC#5
3 LPP - 10 - A06 - DW - 202 - R Boiler Chemical Injection Shelter Steel Framing Elevation & Details A3 1 IFA Ga jadi shelter kan? Hanya slab kemarin Alyssa arivenda: delete? --> buat steel drawing BC#5
4 LPP - 10 - A07 - DW - 201 - R Boiler Chemical Injection Shelter Architecture, Floor Plan, Roof Plan & Finish Schedule A3 1 IFA Ga jadi shelter kan? Hanya slab kemarin Zaenal arivenda: delete? --> delete
5 LPP - 10 - A07 - DW - 202 - R Boiler Chemical Injection Shelter Architecture, View, Section A3 1 IFA Ga jadi shelter kan? Hanya slab kemarin Zaenal arivenda: delete? --> delete
13 LPP - 20 - A05 - DW - 206 - R Steam Turbine Building Concrete Floor Plan Section & Detail A3 1 IFA Delete, STG sudah semua Alyssa delete --> diambil jadi BAH (steel) Retta
5 LPP - 20 - A07 - DW - - R EDG & Electrical Room Shelter - Architectural Detail 1 A3 1 IFI Delete, STG sudah semua Retta delete --> diambil jadi TT4 (pondasi) Retta
3 LPP - 30 - A06 - DW - 215 - R Vacum Cleaning System Framing Plan, Detail & Member Sch A3 1 IFI On going Viola arivenda: target submit? --> sedang antri di drafter
4 LPP - 30 - A06 - DW - 216 - R Vacum Cleaning System Framing Plan, Framing Elevation Line And Detail A3 1 IFI On going Viola arivenda: target submit? --> sedang antri di drafter
17 LPP - 30 - A06 - DW - 224 - R BOP Utility Area Fuel Oil Handling Shelter Detail Foundation Equipment A3 1 IFA On going Fitra Substitusi ganti nomor drawing ke Fuel Oil Tank DIkewall (Submitted)
1 LPP - 30 - A04 - DW - 267 - R Nitrogen Shelter Foundation A3 1 IFI Delete jadinya hanya slab Alyssa delete --> tukeran sama Calc Foam Equipment Tank bang Fitra
2 LPP - 30 - A06 - DW - 233 - R Nitrogen Shelter Floor Plan, Section Detail & Schedule A3 1 IFI Delete jadinya hanya slab Alyssa delete --> tukeran sama DWG Foam Equipment Tank bang Fitra
3 LPP - 30 - A06 - DW - 234 - R Nitrogen Shelter Steel Plan, Framing Elevation Line Detail & Schedule A3 1 IFI Delete jadinya hanya slab Alyssa delete --> diambil untuk cable bridge steel (Retta)
4 LPP - 30 - A07 - DW - 226 - R Nitrogen Shelter Architectural Floor Plan, Roof Plan & Finishing Schedule A3 1 IFI Delete jadinya hanya slab Zaenal
7 LPP - 40 - A06 - DW - 210 - R Transfer Tower - 01 Steel Structure Stairway Plan A3 1 IFA On going Viola arivenda: target submit?
11 LPP - 40 - A06 - DW - 214 - R Transfer Tower - 01 Steel Structure Setting Bolt Holes Detail A3 1 IFA - Viola jadi gambar stairway TT1
15 LPP - 40 - A07 - DW - 207 - R Transfer Tower TT-01 Architectural Elevation 4 & Section A A3 1 IFI submitted pusenlis 13 august Zaenal arivenda: target submit?
8 LPP - 40 - A06 - DW - 220 - R Transfer Tower - 02 Steel Structure Setting Bolt Holes Arrangement-1 A3 1 IFA On going Fitra Substitusi ganti nomor drawing ke Steel BC #7
9 LPP - 40 - A06 - DW - 221 - R Transfer Tower - 02 Steel Structure Setting Bolt Holes Arrangement-2 A3 1 IFA On going Fitra Substitusi ganti nomor drawing ke VGTU BC #7
13 LPP - 40 - A07 - DW - 210 - R Transfer Tower TT-02 Architectural Elevation 1,2, & Elevation 3 A3 1 IFI submitted pusenlis 6 sept Zaenal arivenda: target submit?
14 LPP - 40 - A07 - DW - 211 - R Transfer Tower TT-02 Architectural Elevation 4 & Section A A3 1 IFI submitted pusenlis 6 sept Zaenal arivenda: target submit?
3 LPP - 40 - A06 - DW - 224 - R Transfer Tower - 03 Steel Structure Plan A3 1 IFA On going Alyssa arivenda: target submit? -> submitted
4 LPP - 40 - A06 - DW - 225 - R Transfer Tower - 03 Steel Structure Framing Elevaton-1 A3 1 IFA On going Alyssa arivenda: target submit? -> submitted
5 LPP - 40 - A06 - DW - 226 - R Transfer Tower - 03 Steel Structure Framing Elevaton-2 A3 1 IFA On going Alyssa arivenda: target submit? -> submitted
6 LPP - 40 - A06 - DW - 227 - R Transfer Tower - 03 Steel Structure Detail A3 1 IFA On going Alyssa arivenda: target submit? -> submitted
7 LPP - 40 - A06 - DW - 228 - R Transfer Tower-03 Steel Structure Stairway 1,2,3 & 4 Plan & Elevation A3 1 IFA On going Alyssa arivenda: target submit? -> submitted
8 LPP - 40 - A06 - DW - 229 - R Transfer Tower - 03 Steel Structure Setting Bolt Holes Arrangement-1 A3 1 IFA On going Alyssa arivenda: target submit? -> submitted
9 LPP - 40 - A06 - DW - 230 - R Transfer Tower - 03 Steel Structure Setting Bolt Holes Arrangement-2 A3 1 IFA On going Alyssa arivenda: target submit? -> submitted
10 LPP - 40 - A06 - DW - 231 - R Transfer Tower - 03 Steel Structure Setting Bolt Holes Arrangement-3 A3 1 IFA On going Alyssa arivenda: target submit? -> submitted
11 LPP - 40 - A06 - DW - 232 - R Transfer Tower - 03 Steel Structure Setting Bolt Holes Detail A3 1 IFA On going Alyssa arivenda: target submit? -> submitted
12 LPP - 40 - A07 - DW - 212 - R Transfer Tower TT-03 Architectural Floor Plan-1 A3 1 IFI On going (submited 2nd week of dec) Zaenal arivenda: target submit?
13 LPP - 40 - A07 - DW - 213 - R Transfer Tower TT-03 Architectural Floor Plan-2 A3 1 IFI On going (submited 2nd week of dec) Zaenal arivenda: target submit?
14 LPP - 40 - A07 - DW - 214 - R Transfer Tower Tt-03 Architectural Elevation 1,2, & Elevation 3 A3 1 IFI On going (submited 2nd week of dec) Zaenal arivenda: target submit?
15 LPP - 40 - A07 - DW - 215 - R Transfer Tower Tt-03 Architectural Elevation 4 & Section A A3 1 IFI On going (submited 2nd week of dec) Zaenal arivenda: target submit?
On going, overview BC1 + detail BC1 from
20 LPP - 40 - A06 - DW - 242 - R Conveyor Gallery 01 - Steel Structure Plan & View A3 1 IFA trestle to TT1 Retta arivenda: target submit?
21 LPP - 40 - A06 - DW - 243 - R Conveyor Gallery 01 - Steel Structure Section & Detail 1 A3 1 IFA On going, HOPPER detail steel Retta arivenda: target submit?
22 LPP - 40 - A06 - DW - 244 - R Conveyor Gallery 01 - Steel Structure Section & Detail 2 A3 1 IFA On going, switch to TT4 (steel) Retta arivenda: target submit?
23 LPP - 40 - A06 - DW - 245 - R Conveyor Gallery 01 - Steel Structure Section & Detail 3 A3 1 IFA On going, switch to PB-6 calculation Retta arivenda: target submit?
24 LPP - 40 - A06 - DW - 246 - R Conveyor Gallery 01 - Steel Structure Section & Detail 4 A3 1 IFA On going, switch to PB-6 steel Retta arivenda: target submit?
25 LPP - 40 - A06 - DW - 247 - R Conveyor Gallery 02 - Steel Structure Plan & View A3 1 IFA On going Viola arivenda: target submit?
26 LPP - 40 - A06 - DW - 248 - R Conveyor Gallery 02 - Steel Structure Section & Detail 1 A3 1 IFA On going Viola arivenda: target submit?
27 LPP - 40 - A06 - DW - 249 - R Conveyor Gallery 02 - Steel Structure Section & Detail 2 A3 1 IFA On going Viola arivenda: target submit?
28 LPP - 40 - A06 - DW - 250 - R Conveyor Gallery 02 - Steel Structure Section & Detail 3 A3 1 IFA On going Viola arivenda: target submit?
29 LPP - 40 - A06 - DW - 251 - R Conveyor Gallery 02 - Steel Structure Section & Detail 4 A3 1 IFA On going Viola arivenda: target submit?
34 LPP - 40 - A06 - DW - 256 - R Conveyor Gallery 03 - Steel Structure Section & Detail 4 A3 1 IFA - Fitra Nomor kelebihan --> dipakai conveyor BC6
35 LPP - 40 - A06 - DW - 257 - R Conveyor Gallery 04 - Steel Structure Plan & View A3 1 IFA On going Viola arivenda: target submit? within this month, sedang dikerjakan drafter
36 LPP - 40 - A06 - DW - 258 - R Conveyor Gallery 04 - Steel Structure Section & Detail 1 A3 1 IFA On going Viola arivenda: target submit? within this month, sedang dikerjakan drafter
37 LPP - 40 - A06 - DW - 259 - R Conveyor Gallery 04 - Steel Structure Section & Detail 2 A3 1 IFA On going Viola arivenda: target submit? within this month, sedang dikerjakan drafter
38 LPP - 40 - A06 - DW - 260 - R Conveyor Gallery 04 - Steel Structure Section & Detail 3 A3 1 IFA On going Viola arivenda: target submit? within this month, sedang dikerjakan drafter
39 LPP - 40 - A06 - DW - 261 - R Conveyor Gallery 04 - Steel Structure Section & Detail 4 A3 1 IFA On going Viola arivenda: target submit? within this month, sedang dikerjakan drafter
40 LPP - 40 - A07 - DW - 219 - R Conveyor Gallery Architectural 1 A3 1 IFI On going Zaenal arivenda: target submit?
41 LPP - 40 - A07 - DW - 220 - R Conveyor Gallery Architectural 2 A3 1 IFI On going Zaenal arivenda: target submit?
42 LPP - 40 - A07 - DW - 221 - R Conveyor Gallery Architectural 3 A3 1 IFI On going Zaenal arivenda: target submit?
4 LPP - 40 - A05 - DW - 206 - R Fly Ash Silo Framing Plan --> Coal Run off Pond Plan Unit A & Section A3 1 IFA Issued Viola --> nomor kelebihan, dipakai Coal Run Off Pond
5 LPP - 40 - A05 - DW - 207 - R Fly Ash Silo, Concrete Framing --> Coal Run off Pond Plan Unit B & Section A3 1 IFA Issued Viola --> nomor kelebihan, dipakai Coal Run Off Pond
6 LPP - 40 - A05 - DW - 208 - R Fly Ash Silo, Concrete Framing Member Schedule A3 1 IFA On going Viola DELETE (INI NOMOR DWG STRUKTUR CONCRETE, SUDAH ADA DWG SS NYA)
7 LPP - 40 - A05 - DW - 209 - R Fly Ash Silo Framing Plan , Section & Detail A3 1 IFA On going Viola DELETE (INI NOMOR DWG STRUKTUR CONCRETE, SUDAH ADA DWG SS NYA)
8 LPP - 40 - A05 - DW - 210 - R Fly Ash Silo Framing Elev.Line A3 1 IFA On going Viola DELETE (INI NOMOR DWG STRUKTUR CONCRETE, SUDAH ADA DWG SS NYA)
11 LPP - 40 - A06 - DW - 264 - R Fly Ash Silo Steel Structure Section And Detail 2 A3 1 IFA - Viola --> nomor kelebihan, dipakai ke BC6 (viola)
12 LPP - 40 - A06 - DW - 265 - R Fly Ash Silo Steel Structure Section And Detail 3 A3 1 IFA - Viola --> nomor kelebihan, dipakai ke BC6 (viola)
13 LPP - 40 - A04 - DW - - R Fly Ash Dust Hopper Foundation - Plan, Section & Detail 1 A3 1 IFI Lupa ini sebelah mana ya jadinya?
14 LPP - 40 - A04 - DW - - R Fly Ash Dust Hopper Foundation - Plan, Section & Detail 2 A3 1 IFI Lupa ini sebelah mana ya jadinya?
1 LPP - 40 - A05 - DW - 205 - R Coal Run of Pond Plan and Drainage Plan & Section A3 1 IFA Issued Viola DONE
2 LPP - 40 - A05 - DW - - R Coal Run Off Pond & Pump - Plan, Section & Detail 2 A3 1 IFA Delete Viola Delete
19 LPP - 60 - A05 - DW - 219 - R SWI - Detail Infill Concrete A3 1 IFA Delete
20 LPP - 60 - A05 - DW - 220 - R SWI - Detail Accessories of SWI - Sheet 1 A3 1 IFA Delete
21 LPP - 60 - A05 - DW - 221 - R SWI - Detail Accessories of SWI - Sheet 2 A3 1 IFA Delete
50 LPP - 60 - A06 - DW - 204 - R Chlorination Shelter Base Plate Plan View A3 1 IFA On going Alyssa arivenda: target submit?
51 LPP - 60 - A06 - DW - 205 - R Chlorination Shelter Framing Plan El +4.850 & +5.300 A3 1 IFA On going Alyssa arivenda: target submit?
52 LPP - 60 - A06 - DW - 206 - R Chlorination Shelter Framing Plan El +7.000 A3 1 IFA On going Alyssa arivenda: target submit?
53 LPP - 60 - A06 - DW - 207 - R Chlorination Shelter Elevation A - D A3 1 IFA On going Alyssa arivenda: target submit?
54 LPP - 60 - A06 - DW - 208 - R Chlorination Shelter Elevation 1 - 4 A3 1 IFA On going Alyssa arivenda: target submit?
5 LPP - 70 - A12 - DW - 205 - R Ash Yard Wind Breaker Detail 1 A3 1 IFA On going Zaenal arivenda: target submit?
6 LPP - 70 - A12 - DW - 206 - R Ash Yard Wind Breaker Detail 2 A3 1 IFA On going Zaenal arivenda: target submit?
7 LPP - 70 - A12 - DW - 207 - R Ash Yard Soil Layer Detail A3 1 IFA Terpaut sama izin KLHK Retta
8 LPP - 70 - A12 - DW - 208 - R Ash Yard Run Off Pond Detail 1 A3 1 IFA Isu debit yang salah ada follow up dari process? Retta
9 LPP - 70 - A12 - DW - 209 - R Ash Yard Run Off Pond Detail 2 A3 1 IFA Isu debit yang salah ada follow up dari process? Retta
1 LPP - 70 - A04 - DW - 210 - R Elevated Guard House Foundation A3 1 IFI ?? Retta
2 LPP - 70 - A05 - DW - 222 - R Elevated Guard House Floor Plan, Section Detail & Schedule A3 1 IFI ?? Retta
1 LPP - 70 - A07 - DW - 225 - R (Existing) Substation Building - Indoor Hydrant Box Layout & Isometric A3 1 IFI Delete Sarwono
architectural elevator plan On going (submitted this week) Zaenal
architectural elevator elevation On going (submitted this week) Zaenal
architectural elevator section On going (submitted this week) Zaenal
coal shed landscape & wind breaker On going Zaenal
LPP - 40 - A06 - DW - 214 - R Transfer Tower - 01 Steel Structure Stairway Section On going Viola
LPP - 40 - A06 - DW - 256 - R Conveyor Gallery 06 - Steel Structure Plan & View On going Viola
LPP - 40 - A06 - DW - 264 - R Conveyor Gallery 06 - Steel Structure Section & Detail 1 On going Viola
LPP - 40 - A06 - DW - 265 - R Conveyor Gallery 06 - Steel Structure Section & Detail 2 On going Viola
[1] X dir / Z dir