• Presented by:
• Phil Grimm
Welding Processes
• SMAW ~ Shielded Metal Arc Welding
• High Deposition
Rate
• All Positions
• Continuous
Welding
• Low Penetration
FCAW-G Flux Corded Arc Welding
~ Gas Shielding
• Good Penetration
SAW Submerged Arc Welding
• Machine Welding
• Cost Efficient
• High Quality
• Full Penetration
• Complete Fusion
• Filler Metal Compatibility
• Position of Electrode
Welding Process Productivity
Manual and Semi-Automatic
20
18
16
14
12
SMAW
10
GMAW
8
FCAW
6
4
2
0
1/4" 5/16" 3/8" 7/16"
The WPS should list all
Technical Requirements
• Nozzle Placement • Electrode Direction
• Position
• Filler Metal
• Base Metal
• Volts & Amps
• Temperature
• Gas ~ if required
• Flux ~ if required
• Electrical
Characteristics
Welding Procedure Qualification
•
American Welding
Society
NISTM ~ Ohio Storage Tank
Conference