TIME MANAGEMENT
By
Name
Date
<Author>2015 Page 1 of 4
TIME MANAGEMENT
This paper is written to determine the time required to build a road network in Bambui.
This project is of much importance for Bambui because it will help in promoting the sale of farm
products to industrial market (Ewbchallenge.org, 2015). Whole project is required one month
and ten days to successfully complete the project. This project is based on number of activities
which is divided in work breakdown structure as defined below. This project is based on two
main activities in level two which are foundation and framing. Both activities are further divided
in to other activities. Days required to complete foundation are 30 days whereas framing will
take ten days to complete the project. Foundation of road project is also divided into three main
categories which includes, steel erection, grounding and flooring of the network. Steel erection
does not need any predecessors to start so it will be started right after the conception stage, and it
will take 10 days maximum. At the same time grounding will be started.
These two activities will be started at the same time, grounding will also take 15 days to
complete, so steel erection and foundation will be completed in 15 days. After the grounding,
flooring activity will be started and it will take 5 days. Grounding activity is further divided into
painting and track siding but these two activities will be started after making road and
installation of plumbing and wires. On the other hand the second major activity is framing and it
will be completed in 10 days. Framing activity in construction of road networks is divided in two
sub categories which are installation and excavation. After completing foundation and flooring
of the roads, then roads will be made to move the project in finishing stage. This activity will
take 8 days to complete. Before starting making roads, subcategories of installation activities will
be initiated. It includes installation of wires and plumbing will be started to set the tracks ready
<Author>2015 Page 2 of 4
TIME MANAGEMENT
On the whole framing of the project will take 10 days. In last the subcategories of the
grounding will be initiated because it requires completing the roads construction. These include
the paintings of the steel used for lights and for barriers and the setting of track sides. After
Division of the report work in group members is a difficult task; one member of the
group will prepare or make the report in proposing of alternative solution of developing the road
networks. Another member of team will provide or make report on proposed solution of the
project. At the same time one member will write the objectives of the project and other member
will write the introduction of construction project of road. All these members are required to
submit their work on 6th of April; these parts will be provided to another group member to write
the executive summary of the project, and he will be required to submit the executive summary
so all members will read and discuss the points if they have any regarding the report. After
<Author>2015 Page 3 of 4
TIME MANAGEMENT
References
transport.