Before traffic survey work will be done, to ensure all traffic survey team
understand their duties and responsibility, a series of training will be conducted as
follows :
Traffic count survey
Travel Speed survey
Spot Speed survey
1
3. Location
There are three point `1 (beginning of artery), 2 (middle of artery),
3 (end of artery construction section)
Equipments :
4 Stopwatches
2 tents/shelters
Recorders : Field form sheets, pens
4. Location :
Measurement will be done alongside of construction area of existing arterial
road
2
2. The modes that should be surveyed :
1.Motorcycle
2.Passenger Car
3.Small Buses
4.medium Buses
5.Large Buses
6.Pickup trucks
7.Small trucks(3ton to 4ton size)
8.Large truck(2 axles)
9.Large trucks(3axles or more)
10.Trailers
1.1
3
3. Site Organization and Communication Chart
GENERAL SUPERINTENDENT
YOSHIHARU FUKUDA
REPORTING 1 REPORTING 2
DJOKO PURWANTO SUPRIYONO