Audit Report 9001Ed:6.4 SFR:42 Rev: Mar13ICA Indonesia Auditor: Zulfahmi NuraClient:Ref:PT. PATRA MITRA BERKAH ABADI.

RA BERKAH ABADI. Page 1 of 8 Date:21/02/2018


ICA Indonesia is the trading style of Integrated Quality Standards whose address can be found by visiting www.ICA-indonesia.com

Organisation Name: PT. PATRA MITRA BERKAH ABADI Standard Being Audited: 9001:2015

Address: Jl.Raya Pulorengas No.9 Rt.008 Rw.003 Ds.Sindangjaya, Kec.Cabangbungin Kab.Bekasi

Other Addresses: N/A


Contact
Contact Name: Totok Wisnu Wardhana Director Tel: -
Position:
Current Cert Exp: First Certificate E-Mail: - Web: -
Scope of Contractor for Architecture, Civil and Engineering Construction Works including General Manufacturing X
Organisation Cert: Supplier Service Industry 
Full Time: 10
Scope Of Audit: Stage One:  Stage Two:  Surveillance: X Other: N/A Number Of Staff:
Part Time: 0

SAMPEL
Organisation Reg: Certification Reg: Other Standards Held: No other Standard
Exclusions: 7.3 & 7.5.4
Audit Boundary: Office only (There was not project site yet)
(Locations audited)

Previous Issues: N/A


Confirm Closeout: N/A
Non Conformances: Critical: 0 Minor: 0 Observations: 0 See below and in the content of this report for details

There Were 0 Observations Found At This Audit:


 Sections 00, Of This Report

Auditor Comments: There Were 0 Minor Non-Conformances Found At This Audit:


 Sections 00, Of This Report
(Overview Of There Were 0 Major Non-Conformances Found At This Audit:
Findings)  Sections 00, Of This Report
It Is Therefore Recommended By The Auditor That Certification Is Commenced
The Content of this audit report has been verified by the Scheme Manager

Denotes Compulsory
Procedure Observation: O Not Assessed: X Non Conformance: N (NC-Critical, NM-Minor) Conformance: Y
This document must be password protected before release
Audit Report 9001Ed:6.4 SFR:42 Rev: Mar13ICA Indonesia Auditor: Zulfahmi NuraClient:Ref:PT. PATRA MITRA BERKAH ABADI. Page 2 of 8 Date:21/02/2018
ICA Indonesia is the trading style of Integrated Quality Standards whose address can be found by visiting www.ICA-indonesia.com

AUDIT COMPLIANCE

The auditor/s confirm that there is no known conflict of interest with the organisation being audited.
The organisation confirms that it will not conceal any evidence that might influence the results of this audit.

Print Name Signature (if printed)


For Audit Team Zulfahmi Nura, Lead Auditor

For Organisation Totok Wisnu Wardhana

PRESENT

SAMPEL
Name Opening Meeting Closing Meeting
1 Zulfahmi Nura, Lead Auditor  
2 Totok Wisnu Wardhana  
3 Nur Kenni  
4 Rukmana  
5 Mishabul Munir  
6 Joko Adi Wibowo  
7

The audit team must be free to speak to any relevant member of staff that they feel may assist their findings.

Denotes Compulsory
Procedure Observation: O Not Assessed: X Non Conformance: N (NC-Critical, NM-Minor) Conformance: Y
This document must be password protected before release
Audit Report 9001Ed:6.4 SFR:42 Rev: Mar13ICA Indonesia Auditor: Zulfahmi NuraClient:Ref:PT. PATRA MITRA BERKAH ABADI. Page 3 of 8 Date:21/02/2018
ICA Indonesia is the trading style of Integrated Quality Standards whose address can be found by visiting www.ICA-indonesia.com

# Standard Section Conf Remarks/Evidence(non-conformances & observations in Red type)

01 General Requirements Y It was observed that general requirements are maintained to a satisfactory level.

Documentation Existing documents that are in use, including operating procedures, guidelines, minutes meeting,
02 Y
Requirements external documents are maintained and records as per the requirements.
Quality Manual describes the quality management system of PT. PATRA MITRA BERKAH ABADI

SAMPEL
Management Systems as required by ISO 9001:2015 standard. It covers all activities performs by PT. PATRA MITRA
03 Y
Manuals BERKAH ABADI of the company. The scope of QMS is Contractor for Architecture, Civil and
Engineering Construction Works including General Supplier.

04 Document Control Y Procedure in place & use, held in the Standard Operating Procedures Manual

05 Record Control Y Procedure in place & use, held in the Standard Operating Procedures Manual

It was observed that senior management expressed their commitment to fully utilize the Quality
Manual in organising and implementing quality procedures company wide. Directives have been
06 Management Commitment Y issued by the management to the concerned department head to fully adhere to the quality
procedures, which will be assessed during annual evaluation process to ensure that the
responsibilities are implemented and carried to its required standards.

It was observed that Quality Policy established and well communicated to all personnels within
07 Policies Y
the company.

Various measures have been implemented to ensure customer friendly environment, such as
implementing a customer feedback form to get customer updates on the services provided by the
08 Customer Focus Y
company. These feedbact information is reviewed during management meetings and necessary
steps are implemented.
There were some objectives and target defined. The objectives are S.M.A.R.T, method to
09 Objectives Y
measures its target was defined.

Denotes Compulsory
Procedure Observation: O Not Assessed: X Non Conformance: N (NC-Critical, NM-Minor) Conformance: Y
This document must be password protected before release
Audit Report 9001Ed:6.4 SFR:42 Rev: Mar13ICA Indonesia Auditor: Zulfahmi NuraClient:Ref:PT. PATRA MITRA BERKAH ABADI. Page 4 of 8 Date:21/02/2018
ICA Indonesia is the trading style of Integrated Quality Standards whose address can be found by visiting www.ICA-indonesia.com

# Standard Section Conf Remarks/Evidence(non-conformances & observations in Red type)

Management System Planning is done in order to meet the objectives of QMS, and it is according to the other
10 Y
Planning requirements of quality managemennt system. All the results are being documented in the end.

It was observed that responsibility & authority have been defined as per organisation chart. It was
11 Responsibility & Authority Y
clear defined.

SAMPEL
Management
12 Y Joko Adi Wibowo is the appointed Management Representative.
Representative

Effective communication is established for effectiveness in organization.For communication the


effectiveness of QMS different methods are required which include :
Communication 1. Management Review Meetings
13 Y
Internal/External 2. Electronic Mails
3. Progress Project Meeting
4. Telephone Contact etc
Management Review Meeting has been done periodically every six month. Minutes of meeting has
14 Management Review Y been sighted. As per company guidelines, MR is responsible for following up on all tasks
assigned at the management meetings, and minutes are filed under the supervision of MR.

15 Provision Of Resources Y Resources provided as per company policy and procedures.

It was observed that Competency standards have been established and evaluated. Training
Competence, Awareness &
16 Y program was established, evaluation of training have been done. Training records are filed
Training
effectively.

17 Infrastructure Y Proper location, necessary facilities and equipment installed and well maintained.

Work Environment Work environment managed very well, all required resources, provide to staff. All tools, lights and
18 Y
(Tour Essential) other essential resources found in place.

Denotes Compulsory
Procedure Observation: O Not Assessed: X Non Conformance: N (NC-Critical, NM-Minor) Conformance: Y
This document must be password protected before release
Audit Report 9001Ed:6.4 SFR:42 Rev: Mar13ICA Indonesia Auditor: Zulfahmi NuraClient:Ref:PT. PATRA MITRA BERKAH ABADI. Page 5 of 8 Date:21/02/2018
ICA Indonesia is the trading style of Integrated Quality Standards whose address can be found by visiting www.ICA-indonesia.com

# Standard Section Conf Remarks/Evidence(non-conformances & observations in Red type)

Planning Of Product It was sighted Project Quality Plan is established. Up date is done when there was change
19 Y
Realisation regarding the project items.

20 Design & Development X Excluded (7.3)

SAMPEL
21 Purchasing Y Procedure in place, approved list being updated.

PT. PATRA MITRA BERKAH ABADI maintains the identification of the configuration of the
22 Identification & Traceability Y services in order to identify any differences between the actual configuration and the specified
configuration. All the documents, contracts, project requests have specific reference number.

23 Customer Property X Excluded (7.5.4)

PT. PATRA MITRA BERKAH ABADI preserves the product during internal processing and post
24 Preservation of Product Y
project activities.

Control Of Monitoring &


25 Y Procedure in place, equipment and devices being calibrated on regular basis.
Measurement Devices

26 Customer Satisfaction Y Procedure in place. Customer survey carried out ater project completed. Records were available.

Denotes Compulsory
Procedure Observation: O Not Assessed: X Non Conformance: N (NC-Critical, NM-Minor) Conformance: Y
This document must be password protected before release
Audit Report 9001Ed:6.4 SFR:42 Rev: Mar13ICA Indonesia Auditor: Zulfahmi NuraClient:Ref:PT. PATRA MITRA BERKAH ABADI. Page 6 of 8 Date:21/02/2018
ICA Indonesia is the trading style of Integrated Quality Standards whose address can be found by visiting www.ICA-indonesia.com

# Standard Section Conf Remarks/Evidence(non-conformances & observations in Red type)

27 Internal Audits Y Procedure in place & use, held in the Standard Operating Procedures Manual

28

29
Process Control

Non Conformance Control


Y

Y
SAMPEL
Verified that the planning and implementation of the monitoring, measurement, analysis and
improvement processes are effectively done.

Procedure in place & use, held in the Standard Operating Procedures Manual

30 Complaints Y Procedure in place & use, held in the Standard Operating Procedures Manual

31 Corrective Action Y Procedure in place & use, held in the Standard Operating Procedures Manual

32 Preventive Action Y Procedure in place & use, held in the Standard Operating Procedures Manual

Graph being generated for non conformances and customer complaints, improvvements being
33 Analysis Of Data Y
measured in each area and category.

Operational control process in place, work in progress or completed works being monitored for
34 Operational Control Y conformance to company standards, legal specification and customer requirements as per
operation control process.

35 Risk Management X

Denotes Compulsory
Procedure Observation: O Not Assessed: X Non Conformance: N (NC-Critical, NM-Minor) Conformance: Y
This document must be password protected before release
Audit Report 9001Ed:6.4 SFR:42 Rev: Mar13ICA Indonesia Auditor: Zulfahmi NuraClient:Ref:PT. PATRA MITRA BERKAH ABADI. Page 7 of 8 Date:21/02/2018
ICA Indonesia is the trading style of Integrated Quality Standards whose address can be found by visiting www.ICA-indonesia.com

Audit Notes:

N1

N2

N3

N4

N5
SAMPEL
N6

N7

N8

N9

N10

END

Denotes Compulsory
Procedure Observation: O Not Assessed: X Non Conformance: N (NC-Critical, NM-Minor) Conformance: Y
This document must be password protected before release
Audit Report 9001Ed:6.4 SFR:42 Rev: Mar13ICA Indonesia Auditor: Zulfahmi NuraClient:Ref:PT. PATRA MITRA BERKAH ABADI. Page 8 of 8 Date:21/02/2018
ICA Indonesia is the trading style of Integrated Quality Standards whose address can be found by visiting www.ICA-indonesia.com

Non Conformance Report (One Form per N/C) NOT USED AT THIS REPORT
N/C Issued Date Of
Organisation Name:
Number: By: Issue:

SAMPEL
Address:

Received By:
Contact Position: Tel:
Contact Name:

Nature Of Non To Be Closed-


Conformance: Out By Date:

Non Conformance: Standard: 9001 Section: Critical: X Minor: X Other: X

Closed-Out By:
Signature: Date:
Name

Corrective &
Preventive Actions
Proposed/Taken:

Signed By:
Print Name: Date:
For ICA (UK) Ltd

Denotes Compulsory
Procedure Observation: O Not Assessed: X Non Conformance: N (NC-Critical, NM-Minor) Conformance: Y