Tunku Abdul Rahman University College

Faculty of Built Environment


(Department of Quantity Surveying)
(Diploma in Quantity Surveying)
(Academic Year 2020/2021)

ATQS 3122 Quantity Surveying Practices II

Lecturer: Sr Lim Meng Heok (KMN, FRISM, CQS)

Tutorial Work No.2

Questions
1. State the circumstances that an architect is empowered to issue variation order to a contractor in
building contract.
2. Discuss the proper procedures in issuing a valid Architect Instruction by the contract administrator
/ architect in the building contract.
3. PAM 2018 clause 11.6 on valuation rules stated the methods adopted in valuing variation of
works as instructed by the architect.
Briefly explain a Consulting Quantity Surveyor in carry out the valuation of variation works to enable
the claim submitted by the contractor can be accepted.

Group Leader: …………………………………………… (ID No. ……….…………)


Group Members: 1. ……………………………………… (ID No. . ………………..)
2. ……………………………………… (ID No. ………………... )
3. ……………………………………… (ID No. …………………..)
4. ……………………………………… (ID No. ……………….…)
Group No: DQS2 Group …………………………….

Date of Submission: ………………………………

You might also like