Professional Documents
Culture Documents
Risk Assessment Sheets - Outdoors
Risk Assessment Sheets - Outdoors
DATE TIME
START FILMING 7th May 2021 07/05/2021 – 11:00 am
HAZARDS x
1 Audience or Public Safety
2 Cables
3 Camera Cranes / Dolly / Slider / Drones
4 Derelict Buildings
5 Electricity
6 Fire - Flammable materials etc
7 Hazardous Terrain - Slipping / Tripping / Falling x
8 Hazardous Terrain – Sand / Mud / Gravel etc x
9 Manual Handling – Heavy lifting
10 Noise / Sound levels x
11 Medical Conditions – Allergies / Health problems etc x
12 Physical Exertion x
13 Stunts / Dangerous activities
14 Theft of Equipment x
15 Weapons – Prop Guns / Knives / Swords etc
16 Weather Conditions - Hot / Cold / Rainy / Windy / Snow etc x
17 Working with Animals
18 Working with Children
19 Working with Disabled / Elderly
20 Working at Night
21 Working on or near Water x
22 Vehicles
22 Other -
PRODUCTION RISK ASSESSMENT Sheet 1 of 2
Signed:
Producer
Date:
Signed:
Tutor or Technician