You are on page 1of 19

California Bearing Ratio

12.00 Different Modifiers


CBR Plane Soil
Polynomial (CBR
Plane Soil)
Pressure (kN/m2)

Soil + 15% MP
10.00 Polynomial (Soil +
15% MP)
Soil + 20% GP
R² = 0.998723224768864
Polynomial (Soil +
20% GP)
8.00
Soil + 1.25% PPF
Polynomial (Soil +
1.25% PPF)
Soil Alone Soaked
6.00

4.00

R² = 0.999572334770087
2.00

R² = 1

0.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00
Penetration (mm)
UNIVERSITY OF ENGINEERING & TECHNOLOGY , LAHORE

DEPARTMENT OF CIVIL ENGINEERING

Ph.D Research

Test location: Slide Area Reddish Alone (CBR) Easting : 33o 7'35.22"

Sample No. 01 Northing: 73o 47'22.08"

Client: Ph.D Research Date Tested: 19 December 2020

Test Name: CBR Test (Remolded), Test No: 01

Borehole : TP-04 (Channel Sample Reddish)

Moisture Content Compacted Density

Can ID = X-14 Weight of Mold (g) = 3580.00

Weight of Can (g) = 28.44 Weight of Mold + Soil (g) = 7800.00

Weight of Can+Wet Soil (g) = 98.24 Weight Soil (g) = 4220.00

Weight of Can + Dry Soil (g) = 101.87 Volume of Mold (cc)= 1969.15

Moisture Content (%) = -4.94 Density (g/cc)= 2.14

Proving Ring Constant (kN) = 0.19502 Area of Plunger (mm2) = 1963.48


Penetration
Sr. Deformation Penetration Proving Dail Load on Plunger
Stress
No. Dial Reading (mm) Reading (kN)
(N/mm2)

1 0.00 0.00 0.00 0.00 0.00


2 50.00 0.50 1.50 0.29 0.15
3 100.00 1.00 3.00 0.59 0.30

4 150.00 1.50 4.00 0.78 0.40

5 200.00 2.00 5.00 0.98 0.50


6 250.00 2.50 6.00 1.17 0.60
7 300.00 3.00 6.25 1.22 0.62
8 350.00 3.50 7.00 1.37 0.70

9 400.00 4.00 7.25 1.41 0.72


UNIVERSITY OF ENGINEERING & TECHNOLOGY , LAHORE

DEPARTMENT OF CIVIL ENGINEERING

Ph.D Research

Test location: Reddish + 15% MP (CBR) Easting : 33o 7'35.22"

Sample No. 01 Northing: 73o 47'22.08"

Client: Ph.D Research Date Tested: 19 December 2020

Test Name: CBR Test (Remolded), Test No: 01

Borehole : TP-04 (Channel Sample Reddish)

Moisture Content Compacted Density

Weight of Mold +
Can ID = X - 26 5022.00
Base Plate (g) =

Weight of Mold +
Weight of Can (g) = 32.11 9710.00
Base Plate + Soil (g) =

Weight of Can+Wet Soil (g) = 137.56 Weight Soil (g) = 4688.00

Weight of Can + Dry Soil (g) = 124.10 Volume of Mold (cc)= 2091.62

Moisture Content (%) = 14.63 Density (g/cc)= 2.24

Proving Ring Constant (kN) = 0.19502 Area of Plunger (mm2) = 1963.48


Penetration
Sr. Deformation Penetration Proving Dail Load on Plunger
Stress
No. Dial Reading (mm) Reading (kN)
(N/mm2)

1 0.00 0.00 0.00 0.00 0.00


2 50.00 0.50 4.50 0.88 0.45
3 100.00 1.00 8.00 1.56 0.79

4 150.00 1.50 10.50 2.05 1.04

5 200.00 2.00 13.00 2.54 1.29


6 250.00 2.50 14.75 2.88 1.47
7 300.00 3.00 16.25 3.17 1.61
8 350.00 3.50 17.50 3.41 1.74

9 400.00 4.00 18.50 3.61 1.84


UNIVERSITY OF ENGINEERING & TECHNOLOGY , LAHORE

DEPARTMENT OF CIVIL ENGINEERING

Ph.D Research

Test location: Reddish Alone + 1.25 PPF (CBR) Easting : 33o 7'35.22"

Sample No. 01 Northing: 73o 47'22.08"

Client: Ph.D Research Date Tested: 23 January, 2021

Test Name: CBR Test (Remolded), Test No: 01

Borehole : TP-04 (Channel Sample Reddish)

Moisture Content Compacted Density

Weight of Mold +
Can ID = X-19 5323.00
Base Plate (g) =

Weight of Mold +
Weight of Can (g) = 30.98 8871.00
Base Plate + Soil (g) =

Weight of Can+Wet Soil (g) = 113.59 Weight Soil (g) = 3548.00

Weight of Can + Dry Soil (g) = 101.87 Volume of Mold (cc)= 2014.19

Moisture Content (%) = 16.53 Density (g/cc)= 1.76

Proving Ring Constant (kN) = 0.19502 Area of Plunger (mm2) = 1963.48


Penetration
Sr. Deformation Penetration Proving Dail Load on Plunger
Stress
No. Dial Reading (mm) Reading (kN)
(N/mm2)

1 0.00 0.00 0.00 0.00 0.00


2 50.00 0.50 11.50 2.24 1.14
3 100.00 1.00 24.50 4.78 2.43

4 150.00 1.50 36.50 7.12 3.63

5 200.00 2.00 48.00 9.36 4.77


6 250.00 2.50 57.00 11.12 5.66
7 300.00 3.00 65.50 12.77 6.51
8 350.00 3.50 71.50 13.94 7.10

9 400.00 4.00 78.00 15.21 7.75


UNIVERSITY OF ENGINEERING & TECHNOLOGY , LAHORE

DEPARTMENT OF CIVIL ENGINEERING

Ph.D Research

Test location: Slide Area Reddish Alone (CBR) Easting : 33o 7'35.22"

Sample No. 01 Northing: 73o 47'22.08"

Client: Ph.D Research Date Tested: 21 January, 2021

Test Name: CBR Test (Remolded), Test No: 01

Borehole : TP-04 (Channel Sample Reddish)

Moisture Content Compacted Density

Weight of Mold +
Can ID = X-19 5323.00
Base Plate (g) =

Weight of Mold +
Weight of Can (g) = 33.98 9389.00
Base Plate + Soil (g) =

Weight of Can+Wet Soil (g) = 159.26 Weight Soil (g) = 4066.00

Weight of Can + Dry Soil (g) = 138.85 Volume of Mold (cc)= 2014.19

Moisture Content (%) = 19.46 Density (g/cc)= 2.02

Proving Ring Constant (kN) = 0.19502 Area of Plunger (mm2) = 1963.48


Penetration
Sr. Deformation Penetration Proving Dail Load on Plunger
Stress
No. Dial Reading (mm) Reading (kN)
(N/mm2)

1 0.00 0.00 0.00 0.00 0.00


2 50.00 0.50 10.00 1.95 0.99
3 100.00 1.00 16.00 3.12 1.59

4 150.00 1.50 20.00 3.90 1.99

5 200.00 2.00 22.00 4.29 2.19


6 250.00 2.50 24.50 4.78 2.43
7 300.00 3.00 27.00 5.27 2.68
8 350.00 3.50 29.00 5.66 2.88

9 400.00 4.00 30.00 5.85 2.98


UNIVERSITY OF ENGINEERING & TECHNOLOGY , LAHORE

DEPARTMENT OF CIVIL ENGINEERING

Ph.D Research

Test location: Slide Area Reddish Alone ( Soaked CBR) Easting : 33o 7'35.22"

Sample No. 01 Northing: 73o 47'22.08"

Client: Ph.D Research Date Tested: 25 January 2021

Test Name: CBR Test (Remolded), Test No: 01

Borehole : TP-04 (Channel Sample Reddish)

Moisture Content Compacted Density

Weight of Mold +
Can ID = X - 40 5022.00
Base Plate (g) =

Weight of Mold +
Weight of Can (g) = 31.11 9642.00
Base Plate + Soil (g) =

Weight of Can+Wet Soil (g) = 156.32 Weight Soil (g) = 4620.00

Weight of Can + Dry Soil (g) = 131.48 Volume of Mold (cc)= 2091.62

Moisture Content (%) = 24.75 Density (g/cc)= 2.21

Proving Ring Constant (kN) = 0.19502 Area of Plunger (mm2) = 1963.48


Penetration
Sr. Deformation Penetration Proving Dail Load on Plunger
Stress
No. Dial Reading (mm) Reading (kN)
(N/mm2)

1 0.00 0.00 0.00 0.00 0.00


2 50.00 0.50 1.00 0.20 0.10
3 100.00 1.00 1.00 0.20 0.10

4 150.00 1.50 1.00 0.20 0.10

5 200.00 2.00 1.25 0.24 0.12


6 250.00 2.50 1.50 0.29 0.15
7 300.00 3.00 1.50 0.29 0.15
8 350.00 3.50 1.75 0.34 0.17

9 400.00 4.00 2.00 0.39 0.20


UNIVERSITY OF ENGINEERING & TECHNOLOGY , LAHORE

DEPARTMENT OF CIVIL ENGINEERING

Ph.D Research

Test location: Reddish + 15% MP (CBR) Easting : 33o 7'35.22"

Sample No. 01 Northing: 73o 47'22.08"

Client: Ph.D Research Date Tested: 19 December 2020

Test Name: CBR Test (Remolded), Test No: 01

Borehole : TP-04 (Channel Sample Reddish)

Moisture Content Compacted Density

Weight of Mold +
Can ID = X - 36 5022.00
Base Plate (g) =

Weight of Mold +
Weight of Can (g) = 31.06 8197.00
Base Plate + Soil (g) =

Weight of Can+Wet Soil (g) = 170.5 Weight Soil (g) = 3175.00

Weight of Can + Dry Soil (g) = 143.50 Volume of Mold (cc)= 2091.62

Moisture Content (%) = 24.01 Density (g/cc)= 1.52

Proving Ring Constant (kN) = 0.19502 Area of Plunger (mm2) = 1963.48


Penetration
Sr. Deformation Penetration Proving Dail Load on Plunger
Stress
No. Dial Reading (mm) Reading (kN)
(N/mm2)

1 0.00 0.00 0.00 0.00 0.00


2 50.00 0.50 0.00 0.00 0.00
3 100.00 1.00 0.25 0.05 0.02

4 150.00 1.50 0.50 0.10 0.05

5 200.00 2.00 0.75 0.15 0.07


6 250.00 2.50 1.00 0.20 0.10
7 300.00 3.00 1.00 0.20 0.10
8 350.00 3.50 1.00 0.20 0.10

9 400.00 4.00 1.00 0.20 0.10


UNIVERSITY OF ENGINEERING & TECHNOLOGY , LAHORE

DEPARTMENT OF CIVIL ENGINEERING

Ph.D Research

Test location: Slide Area Reddish Alone (CBR) Easting : 33o 7'35.22"

Sample No. 01 Northing: 73o 47'22.08"

Client: Ph.D Research Date Tested: 26 January, 2021

Test Name: CBR Test (Remolded), Test No: 01

Borehole : TP-04 (Channel Sample Reddish)

Moisture Content Compacted Density

Weight of Mold +
Can ID = X-45 5323.00
Base Plate (g) =

Weight of Mold +
Weight of Can (g) = 31.65 9116.00
Base Plate + Soil (g) =

Weight of Can+Wet Soil (g) = 81.08 Weight Soil (g) = 3793.00

Weight of Can + Dry Soil (g) = 72.28 Volume of Mold (cc)= 2014.19

Moisture Content (%) = 21.66 Density (g/cc)= 1.88

Proving Ring Constant (kN) = 0.19502 Area of Plunger (mm2) = 1963.48


Penetration
Sr. Deformation Penetration Proving Dail Load on Plunger
Stress
No. Dial Reading (mm) Reading (kN)
(N/mm2)

1 0.00 0.00 0.00 0.00 0.00


2 50.00 0.50 2.75 0.54 0.27
3 100.00 1.00 4.50 0.88 0.45

4 150.00 1.50 7.50 1.46 0.74

5 200.00 2.00 11.25 2.19 1.12


6 250.00 2.50 16.00 3.12 1.59
7 300.00 3.00 22.25 4.34 2.21
8 350.00 3.50 29.75 5.80 2.95

9 400.00 4.00 39.00 7.61 3.87


UNIVERSITY OF ENGINEERING & TECHNOLOGY , LAHORE

DEPARTMENT OF CIVIL ENGINEERING

Ph.D Research

Test location: Reddish Alone + 1.25 PPF ( Soaked CBR) Easting : 33o 7'35.22"

Sample No. 01 Northing: 73o 47'22.08"

Client: Ph.D Research Date Tested: 27 January, 2021

Test Name: CBR Test (Remolded), Test No: 01

Borehole : TP-04 (Channel Sample Reddish)

Moisture Content Compacted Density

Weight of Mold +
Can ID = X-26 5323.00
Base Plate (g) =

Weight of Mold +
Weight of Can (g) = 32.15 9554.00
Base Plate + Soil (g) =

Weight of Can+Wet Soil (g) = 171.27 Weight Soil (g) = 4231.00

Weight of Can + Dry Soil (g) = 137.54 Volume of Mold (cc)= 2014.19

Moisture Content (%) = 32.00 Density (g/cc)= 2.10

Proving Ring Constant (kN) = 0.19502 Area of Plunger (mm2) = 1963.48


Penetration
Sr. Deformation Penetration Proving Dail Load on Plunger
Stress
No. Dial Reading (mm) Reading (kN)
(N/mm2)

1 0.00 0.00 1.00 0.20 0.10


2 50.00 0.50 1.00 0.20 0.10
3 100.00 1.00 1.25 0.24 0.12

4 150.00 1.50 1.75 0.34 0.17

5 200.00 2.00 2.00 0.39 0.20


6 250.00 2.50 2.00 0.39 0.20
7 300.00 3.00 2.00 0.39 0.20
8 350.00 3.50 2.00 0.39 0.20

9 400.00 4.00 2.00 0.39 0.20


CBR Values with Different Combinations of Modifiers

90 82
Unsoaked CBR
80
Soaked CBR
70
CBR Values (%)

60

50

40 35

30 23
21
20
9
10 2 3
1

0
Soil Alone Soil + 15 MP Soil + 20 GP Soil + 1.25% PPF

Soil with Different Percentage of Modifiers


UNIVERSITY OF ENGINEERING & TECHNOLOGY , LAHORE

DEPARTMENT OF CIVIL ENGINEERING

Ph.D Research

Test location: CBR Test Summary for all Comibinations Easting :

Sample No. 01 Northing: 73o 47'22.08"

Client: Ph.D Research Date Tested: 28 January, 2021

Test Name: CBR Test (Remolded), Test No:

Borehole :

CBR Value (%)


Sr. %age
Description
No. Improvement
Unsoaked Soaked

1 Soil Alone 9 2 -

2 Soil + 15 MP 21 1

3 Soil + 20 GP 35 3

4 Soil + 1.25% PPF 82 23

You might also like