Revision: 0
Issue Purpose: IFQ
TABLE OF CONTENTS
Section Topic
V V-2607 1 SEPARATOR
V V-2617 1 SEPARATOR
V D-1801 1 DEAREATOR
METHANOL PREVAPORISER /
V E-8104 1
METHANOL VAPORISER
METHANOL PREVAPORISER /
V E-8105 1
METHANOL VAPORISER
METHANOL PREVAPORISER /
V E-8204 1
METHANOL VAPORISER
METHANOL PREVAPORISER /
V E-8205 1
METHANOL VAPORISER
Total : 47 Items / 47 Sets
2. SCOPE OF WORK
The following works shown by the mark of “V” shall be included in the scope of bidder’s work unless otherwise
specified.
ASME II : Material
V ASME V : Nondestructive Examination
ASME IX : Welding and Brazing Qualification
Specifications
V
Refer to the Specification in Clause 5. Attached documents
Materials
V Refer to the Fabrication drawings in Clause 5. Attached
documents
Contains Confidential Information of Both Dow and Saudi Aramco
Page 6 of 18
SADARA Isocyanates Plant Document No: MR-110496-12-291-301
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM & LADDER (MNB/DNT)
(BIDDER’ NAME: )
BIDDER’S PROPOSAL
EVALUATION
PURCHASER’S REQUIREMENT ( A or NA or D ) SEE
(PURCHASER)
GENERAL NOTE 3
All documents and standards mentioned in the contractual
documents shall be considered at
V
the latest revision in force at the time of issue of the
MR unless otherwise specified
V Manufacturing work
V Shop Inspection
V Transportation
V Shipping mark
V Kick Plate
5. ATTACHED DOCUMENTS
The following documents/drawings and those referred shall be the parts of this MR.
METHANOL PREVAPORISER /
V E-8104 TO BE LATER
METHANOL VAPORISER
METHANOL PREVAPORISER /
V E-8105 TO BE LATER
METHANOL VAPORISER
METHANOL PREVAPORISER /
V E-8204 TO BE LATER
METHANOL VAPORISER
METHANOL PREVAPORISER /
V E-8205 TO BE LATER
METHANOL VAPORISER
REMOVABLE INDUSTRIAL
V RT2G-5520-05 000
HANDRAIL DETAILS
6. SPECIAL NOTES
6.1 General
6.8 PRE-ASSEMBLY
Note 4
Clips shall be “GRATE-FAST GRATING CLIPS” by Struct-Fast,
V Inc (or approved equal) New Boston Street, Woburn, MA 800
327-6719 or Unistrut Canada, Type GF, 800 521-7730.
Note 7
Grating clips other than Grate-Fast shall be submitted for owner’s
representative review and approval.
Local manufacturer
Any repair & rectification work at the job site due to mis-
fabrication shall be carried out by Platform & Ladder bidder with
V his own cost.
Overseas manufacturer
Any repair and rectification will be carried out by DAELIM and
back charge will be issued to bidder accordingly.
6.15 Identification
HOT-DIP
GRATING
GALVANIZED
HAND RAIL (TOP)
TOP
V & MIDDLE RAIL HOT-DIP
INTERMEDIATE GALVANIZED
PLATFORM POST (for HAND
RAIL)
HOT-DIP
STRUCTURE
GALVANIZED
LADDER
HOT-DIP
GALVANIZED
CAGE
Full sets of Platform & Ladder fabrication detail drawing for the
missing items will be provided later (After P.O)
6.18 Expected Delivery Date
N.A
Final Data
No. of For approval For final
Drawings & Documents Book
No. copies
Requirements No. of Due No. of Due No. of Due
with bid
copies date copies date copies date
Detailed Fabrication & Testing schedule
1 2P 1E+2P 1E+2P 1E+2P
(*)
Shipping & transportation information
2 - 1E+2P 1E+2P 1E+2P
(net/gross weight)
3 Sub Bidder List - - - -
11 WPS & qualification record with weld map - 1E+2P 1E+2P 1E+2P
19 As Built Drawing - - -
P: Print, E:Electronic file (PDF)
NOTE
1. : (*) DAELIM’s blank form shall be used.
2. : Document shall be approved by Purchaser at one (1) month prior to PIM.
The bid form Exceptions and Deviations to Project Specifications and Documents
The bid form requires Bidder to agree/confirm that the only deviations from the Project Specifications and
Documents that it possible are those stated in its proposed exceptions/alternatives listed in the Table attached
hereto. Purchaser has no responsibility to discover, identity, or resolve any others deviations from the
Specifications and Documents that may be contained in the other parts or Bidder’s bid.
If Bidder is awarded the contract, it must comply with all provisions of the Specifications and Documents as
revised only to reflect the proposed exceptions and alternatives that have been accepted by Purchaser.
(Bidder’s name)
(Date)
Note)
1. If Bidder does not submit the signed documents with its proposal, its bid may be deemed to be non-
responsive to the invitation to bid and may be dropped from further consideration.
(1) This Quotation is the total effect on Bidder’s proposal if Purchaser would not accept Bidder’s proposed exceptions/alternatives.