You are on page 1of 19

SADARA Isocyanates Plant Document No: MR-110496-12-292-101

Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

SUMMARY OF DOCUMENT REVISIONS


Rev. Date Section
Revision Description
No. Revised Revised
0 25-Jan-2013 New Initial issue

Contains Confidential Information of Both Dow and Saudi Aramco


Page 2 of 17
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

TABLE OF CONTENTS

Section Topic

1.0 ITEM & QUANTITIES……………………………………………………………..…….4

2.0 APPLICABLE CODE, SPECIFICATIONS & MATERIALS…………………………6

3.0 SCOPE OF WORK………………………………………………………………………. 6

4.0 SCOPE OF SUPPLY ………………………………………………………….….…. 7

5.0 TEST AND INSPECTION………………………………………………………….. 8

6.0 SHIPPING PREPARATION…………………………………………………………… 8

7.0 ATTACHED DOCUMENTS………………………………………………………….. 9

8.0 SPECIAL NOTES……………………………………………………………………… 12

ATTACHMENT
ATTACHMENT #1 - VENDOR DATA REQUIREMENT
ATTACHMENT #2 - EXCEPTIONS AND DEVIATION LIST
ATTACHMENT #3 - PLATFORM & LADDER ESTIMATED WEIGHT SUMMARY
ATTACHMENT #4 - DIMENSION TABLE FOR STEEL STRUCTURAL SECTION
ATTACHMENT #5 - FABRICATION DRAWING (WITH DRAWING LIST)

Contains Confidential Information of Both Dow and Saudi Aramco


Page 3 of 17
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

(BIDDER’ NAME: )
BIDDER’S PROPOSAL
EVALUATION
PURCHASER’S REQUIREMENT ( A or NA or D ) SEE
(PURCHASER)
GENERAL NOTE 3
GENERAL NOTE
*1. “V” mark means Purchaser’s requirements and Bidder shall include them in his own quotation.
*2. BIDDER MUST USE THIS FORM in his quotation instead of his own quotation form for all TECHNICAL
ITEMS. IF BIDDER DOES NOT USE THIS FORMAT FOR TECHNICAL ITEMS in his quotation,
PURCHASER WILL NOT DO TBE/CBE.
*3. Bidder shall fill out the vessel of “Bidder’s Proposal” as “A”,”NA”,”D”.
A : Compliance with purchaser’s requirements with no deviation
NA : Not Applicable(Bidder will not apply it.)
D : Deviation, clarification, etc for all items except “A” and “NA”.
(Please use “Exceptions and deviation list” attached.)
1. ITEM AND QUANTITIES
The following items shall be furnished in accordance with the requirements specified in this MR and the
documents/drawings referred hereto.

ITEM NO. Q’TY DESCRIPTION

110496-11-201-101 TOWER 1 (TOTAL : 2 ITEMS / 2 SETS)

V T-3410 1 DEHYDRATION COLUMN

V T-3420 1 ISOMER SPLITTER COLUMN

110496-12-203-101 VESSEL 1 (TOTAL : 7 ITEMS / 7 SETS)

V W-4820 1 VIRGIN DCB MOLE SIEVE DRYER

V D-7150 1 BRINE RECYCLE DRUM

V D-7371 1 CHILLED MCB EXPANSION DRUM

V D-7380 1 HOT MCB EXPANSION DRUM

V D-7391 1 AMBIENT MCB EXPANSION DRUM

V D-7821 1 HOT OIL EXPANSION DRUM

CHILLED WATER EXPANSION


V D-7842 1
DRUM

110496-12-204-101 VESSEL 2 (TOTAL : 21 ITEMS / 25 SETS)

V D-3130 1 PSV VENT KO DRUM

V D-3250A/B 2 SPENT CATALYST DRUM

V D-3411 1 REFLUX DRUM

V D-3647 1 WASTEWATER DRUM

Contains Confidential Information of Both Dow and Saudi Aramco


Page 4 of 17
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

(BIDDER’ NAME: )
BIDDER’S PROPOSAL
EVALUATION
PURCHASER’S REQUIREMENT ( A or NA or D ) SEE
(PURCHASER)
GENERAL NOTE 3
NON-HYDROGEN VENT KNOCKOUT
V D-3710 1
DRUM
HYDROGEN VENT KNOCKOUT
V D-3720 1
DRUM

V D-3822 1 TDA CONDENSATE DRUM

TDA/TDI CONDENSATE FLASH


V D-3833 1
DRUM

V D-4408A/B/C 3 DCB CARBON BEDS

V V-3052 1 O-TDA STORAGE TANK

V V-3400A/B 2 CRUDE TDA STORAGE TANK

V D-7151 1 BRINE SETTLER

1ST STAGE AMINE/WATER


V D-7152 1
SETTLER DRUM

V D-7163 1 FINISHED AMINE TANK

V D-7182 1 T-7181 REFLUX DRUM

V D-7221 1 EXPANSION DRUM

V D-7354 1 T-7341 REFLUX DRUM

V D-7362 1 SOLVENT COL REFLUX DRUM

V D-7822 1 E-7822 CONDENSATE DRUM

V D-7832 1 42 BARG FLASH DRUM

V V-7822 1 HOT OIL STORAGE TANK

110496-12-205-101 VESSEL 3 (TOTAL : 2 ITEMS / 2 SETS)

V D-4005 1 ANTI-OXIDANT DRUM

V D-7389 1 PHENCO DRUM

110496-25-220-101 REACTOR (TOTAL : 4 ITEMS / 4 SETS)

V R-7121 1 PRIMARY MDA REACTOR

V R-7122 1 SECONDARY MDA REACTOR

V R-7123 1 TERTIARY MDA REACTOR

Contains Confidential Information of Both Dow and Saudi Aramco


Page 5 of 17
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

(BIDDER’ NAME: )
BIDDER’S PROPOSAL
EVALUATION
PURCHASER’S REQUIREMENT ( A or NA or D ) SEE
(PURCHASER)
GENERAL NOTE 3

V R-7131 1 VERTICAL STIRRED REACTOR

110496-12-221-101 DOME INSIDE VESSEL (TOTAL : 4 ITEMS / 4 SETS)

V D-4204 1 REACTOR BARRIER FLUID DRUM

V D-4310 1 COLLECTION DRUM

DESORPTION DCB COLLECTION


V D-4406 1
DRUM

V D-7914 1 PROCESS DRUM

110496-08-233-101 STACK (TOTAL : 1 ITEM / 1 SET)

V SK-4980 1 MITIGATION DOME VENTILATION

110496-11-285-101 TOWER 3 (TOTAL : 1 ITEM / 1 SET)

V T-7361 1 SOLVENT COLUMN

110496-11-286-101 TOWER 4 (TOTAL : 1 ITEM / 1 SET)

V T-4501 1 SOLVENT RECOVERY TOWER

Total : 43 Items / 47 Sets

2. APPLICABLE CODE, SPECIFICATIONS & MATERIALS

ASME II : Material
V ASME V : Nondestructive Examination
ASME IX : Welding and Brazing Qualification
Specifications
V
Refer to the Specification in Clause 7.6 Attached documents.
Materials
V Refer to the Fabrication drawings in Clause 7.5 Attached
documents.
All documents and standards mentioned in the contractual
V documents shall be considered at the latest revision in force at the
time of issue of the MR unless otherwise specified.
3. SCOPE OF WORK
The following works shown by the mark of “V” shall be included in the scope of bidder’s work unless
otherwise specified.
Mechanical guarantee and fabrication guarantee
V
(P/F, Ladder and grating)

V Material procurement for platform and ladder with support as

Contains Confidential Information of Both Dow and Saudi Aramco


Page 6 of 17
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

(BIDDER’ NAME: )
BIDDER’S PROPOSAL
EVALUATION
PURCHASER’S REQUIREMENT ( A or NA or D ) SEE
(PURCHASER)
GENERAL NOTE 3
shown at fabrication drawing

Hot dip galvanizing for Platform, Ladder, grating, support and


V
bolt/nuts (As per specification G16S-0205-03)
Verification on fabrication work for P/F & Ladder
V
(See special notes Para 8.10)

V Welding procedure qualification tests

V Manufacturing work

Repair & rectification work due to miss-fabrication at job site


- In case of Local manufacturer: Shall be Carried out by bidder
V in free of cost
- In case of Overseas manufacturer: Will be carried out by
DAELIM and the back charge will be issued to manufacturer.

V Assembled at the shop for all P/F and Ladder

V Shop Inspection

V Third party inspection by purchaser or purchaser’s representative

V Painting (See special note Para. 8.14)

V Platform and Ladder numbering (tagging) label

Protection devices for transportation, and loading / unloading


V
during shipping

V Transportation (See special note Para. 8.12)


Documentation as per "Bidder Data Requirements" attached in
V
this MR
4. SCOPE OF SUPPLY
The following parts shown by the mark “V” shall be included in the scope of bidder’s supply unless otherwise
specified.

4.1 Main Structure & Accessories

Platform and handrail with clip support


V
(Hot Dip Galvanized)

V Grating with support (Hot Dip Galvanized)

Ladder, cage and Ladder rung with clip support


V
(Hot Dip Galvanized)
Safety device (Cage safety bar as per RT2G-5515-40)
V
Safety gate (Optional price as per RT2G-5515-20)

Contains Confidential Information of Both Dow and Saudi Aramco


Page 7 of 17
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

(BIDDER’ NAME: )
BIDDER’S PROPOSAL
EVALUATION
PURCHASER’S REQUIREMENT ( A or NA or D ) SEE
(PURCHASER)
GENERAL NOTE 3
Connection bolt/nuts and washer
V
(Hot Dip Galvanized)

V Kick Plate (Hot Dip Galvanized)

V Slotted Counter Sunk Head Screw (Hot Dip Galvanized)

V Extension bolt/nuts include spare parts (Hot Dip Galvanized)

V Grating Fastening system (See special note Para. 8.16)

V Threaded stud placing with washer (Hot Dip Galvanized)

V Tagged Name plates for each P/F and Ladder

V Earth lugs for Vertical Ladder, if required

V Wooden plate for clip to clip, if required

All other parts specified in the fabrication drawings and standard


V
drawings

4.2 Spare Parts

For Construction, pre-commissioning, start-up


V - Bolts, studs/nuts, washer, special nuts of each type : 10% (3
minimum for each size)

4.3 Delivery condition

V F.O.B : For Oversea Bidder

V Transportation to job site for domestic bidder in Saudi Arabia

5. TEST AND INSPECTION


Inspection and test shall be carried out in accordance with applicable code and specifications listed in this
MR

V Shop inspection and test (Inspection Level 0)


rd
V 3 party inspection except the fee

V Residence & access for purchaser’s representatives.

6. SHIPPING PREPARATION

V Shipping mark

V Seaworthy packing (For oversea Bidder only)

Contains Confidential Information of Both Dow and Saudi Aramco


Page 8 of 17
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

(BIDDER’ NAME: )
BIDDER’S PROPOSAL
EVALUATION
PURCHASER’S REQUIREMENT ( A or NA or D ) SEE
(PURCHASER)
GENERAL NOTE 3
Protection devices for transportation and loading/unloading during
V
shipping

7. ATTACHED DOCUMENTS
The following documents/drawings and those referred shall be the parts of this MR.

7.1 Vendor data requirements : Refer to Attachment #1

7.2 Deviation list : Refer to Attachment #2

7.3 Platform & Ladder Estimated Weight Summary

7.4 Dimension table for Steel Structural section

7.5 Fabrication Drawing (Refer to attached Platform Drawing List)

Item No. Rev. Item Name

110496-11-201-101 TOWER 1 (TOTAL : 2 ITEMS / 2 SETS)

V T-3410 0 DEHYDRATION COLUMN

V T-3420 0 ISOMER SPLITTER COLUMN

110496-12-203-101 VESSEL 1 (TOTAL : 7 ITEMS / 7 SETS)


VIRGIN DCB MOLE SIEVE
V W-4820 LATER
DRYER

V D-7150 BRINE RECYCLE DRUM LATER


CHILLED MCB EXPANSION
V D-7371 LATER
DRUM
V D-7380 HOT MCB EXPANSION DRUM LATER
AMBIENT MCB EXPANSION
V D-7391 LATER
DRUM
V D-7821 HOT OIL EXPANSION DRUM LATER
CHILLED WATER EXPANSION
V D-7842 LATER
DRUM

110496-12-204-101 VESSEL 2 (TOTAL : 21 ITEMS / 25 SETS)

V D-3130 0 PSV VENT KO DRUM

V D-3250A/B 0 SPENT CATALYST DRUM

V D-3411 0 REFLUX DRUM

Contains Confidential Information of Both Dow and Saudi Aramco


Page 9 of 17
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

(BIDDER’ NAME: )
BIDDER’S PROPOSAL
EVALUATION
PURCHASER’S REQUIREMENT ( A or NA or D ) SEE
(PURCHASER)
GENERAL NOTE 3

V D-3647 0 WASTEWATER DRUM

NON-HYDROGEN VENT
V D-3710 0
KNOCKOUT DRUM
HYDROGEN VENT KNOCKOUT
V D-3720 0
DRUM

V D-3822 0 TDA CONDENSATE DRUM

TDA/TDI CONDENSATE FLASH


V D-3833 0
DRUM

V D-4408A/B/C 0 DCB CARBON BEDS

V V-3052 0 O-TDA STORAGE TANK

V V-3400A/B 0 CRUDE TDA STORAGE TANK

V D-7151 0 BRINE SETTLER

1ST STAGE AMINE/WATER


V D-7152 0
SETTLER DRUM

V D-7163 0 FINISHED AMINE TANK

V D-7182 0 T-7181 REFLUX DRUM

V D-7221 0 EXPANSION DRUM

V D-7354 0 T-7341 REFLUX DRUM

V D-7362 0 SOLVENT COL REFLUX DRUM

V D-7822 0 E-7822 CONDENSATE DRUM

V D-7832 0 42 BARG FLASH DRUM

V V-7822 0 HOT OIL STORAGE TANK

110496-12-205-101 VESSEL 3 (TOTAL : 2 ITEMS / 2 SETS)

V D-4005 1 ANTI-OXIDANT DRUM

V D-7389 1 PHENCO DRUM

110496-25-220-101 REACTOR (TOTAL : 4 ITEMS / 4 SETS)

V R-7121 PRIMARY MDA REACTOR LATER

V R-7122 SECONDARY MDA REACTOR LATER

Contains Confidential Information of Both Dow and Saudi Aramco


Page 10 of 17
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

(BIDDER’ NAME: )
BIDDER’S PROPOSAL
EVALUATION
PURCHASER’S REQUIREMENT ( A or NA or D ) SEE
(PURCHASER)
GENERAL NOTE 3

V R-7123 TERTIARY MDA REACTOR LATER

V R-7131 VERTICAL STIRRED REACTOR LATER

110496-12-221-101 DOME INSIDE VESSEL (TOTAL : 4 ITEMS / 4 SETS)

REACTOR BARRIER FLUID


V D-4204 LATER
DRUM

V D-4310 COLLECTION DRUM LATER

DESORPTION DCB
V D-4406 LATER
COLLECTION DRUM

V D-7914 PROCESS DRUM LATER

110496-08-233-101 STACK (TOTAL : 1 ITEM / 1 SET)

MITIGATION DOME
V SK-4980 LATER
VENTILATION

110496-11-285-101 TOWER 3 (TOTAL : 1 ITEM / 1 SET)

V T-7361 0 SOLVENT COLUMN

110496-11-286-101 TOWER 4 (TOTAL : 1 ITEM / 1 SET)

V T-4501 SOLVENT RECOVERY TOWER LATER

7.6 Project Specifications and Standards

Specification No. Rev. Title

V RT2G-5515-01 000 STEEL LADDER AND SAFETY CAGE


LADDER SUPPORT (AT
V RT2G-5515-02 000
PLATFORM)
V RT2G-5515-03 000 LADDER SUPPORT (AT COLUMN)
V RT2G-5515-04 000 LADDER RAIL EXTENSION
V RT2G-5520-00 000 INDUSTRIAL HANDRAIL DETAILS
REMOVABLE INDUSTRIAL
V RT2G-5520-05 000
HANDRAIL DETAILS
V RT2G-5530-01 001 GRATING DETAIL
REINFORCING FOR FIELD CUT
V RT2G-5530-02 000
OPENINGS

Contains Confidential Information of Both Dow and Saudi Aramco


Page 11 of 17
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

(BIDDER’ NAME: )
BIDDER’S PROPOSAL
EVALUATION
PURCHASER’S REQUIREMENT ( A or NA or D ) SEE
(PURCHASER)
GENERAL NOTE 3
V RT2G-5530-05 001 GRATING PENETRATION COLLARS
V RT2G-5535-40 000 KNEE BRACE PLATFORM
V RT2G-5535-41 000 CANTILEVER PLATFORM
V G9G-5505-01 000 LADDER CLIPS TOWERS & TANKS
V G9G-5510-01 000 PLATFORM CLIPS
V G16S-0205-03 000 HOT DIP GALVANIZING
INSPECTION & TESTING
REQUIREMENTS: INSTRUCTION
V RT175-000003 -
AND EXPLANATION OF
REQUIREMENTS
INSPECTION & TESTING
REQUIREMENTS: COATING; SHOP
APPLIED; PROCESS
V RT175-091900 -
QUIPMENT,TANK,PIPING AND
COMPONENTS, PIPELINES AND
STRUCTURES
SCHEDULE Q – QUALITY
V Sche-Q 3 14_ 3 15 -
REQUIREMENTS

8. SPECIAL NOTES

8.1 General

Bidder is requested to provide complete information for purchaser


V to evaluate bidder’s proposal deeply in commercial and technical.
The information required in the table of “bidder data requirement”
in this MR shall be submitted completely at bidder’s quotation.

8.2 Exception / Alternatives to M/R, data sheets,


specifications and drawings

Bidder’s proposal shall be strictly in accordance with the


requirements of this Material Requisition.
In case of any deviation or alternative design, it shall be clearly
V mentioned on the bid format titled by Bidder’s proposed
exception/alternatives. Unless otherwise mentioned, it shall be
understood as full compliance.
The bid form for Exceptions/Alternatives requires bidder’s
signature to verify that there are no any other deviations or
alternatives except for those stated in the bid format titled by
“Deviation Request Form”. Bidder shall submit them with its
signature at the time of proposal.
Contains Confidential Information of Both Dow and Saudi Aramco
Page 12 of 17
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

(BIDDER’ NAME: )
BIDDER’S PROPOSAL
EVALUATION
PURCHASER’S REQUIREMENT ( A or NA or D ) SEE
(PURCHASER)
GENERAL NOTE 3

8.3 Technical Conflict

In the event provided drawings specify less stringent


requirements than the design Code, the Bidder shall notify
Purchaser of the discrepancy prior to proceeding with work.

In case of any conflict, the following order of precedence will be


V applied. This order of precedence is mandatory and the highest
priority in case of conflicts with other documentations.
1) All Requirements of material/purchase requisition
including datasheets, specification, drawing, etc as
included in MR except agreed deviation as written on the
aforesaid format.
2) Correspondences & MOM
3) Bidder’s proposal

8.4 Software and Tools

V For Documentation : MS-Office, PDF


For Drawing : PDF, CAD

8.5 Language & Unit

V All information submitted shall be in the English language. The


Units of Measurement are generally based on International
System of Units (SI).

8.6 Inspection

1) Bidder shall submit Inspection Disposition Reports (IDR)


within 7 days after Inspection Release Note (IRN) and/or
shipping release note received. The IDR shall have the
following contents;

(1) Narrative details of quality activities performed during


manufacturing and fabrication of the equipment or
material;
V (2) Copies of approved variances to Company
requirements;
(3) All Contactor inspection reports
(4) Copies of bidder quality records as specified in
applicable RT-175 form;
(5) Copies of all NCRs with final resolutions;
(6) Outstanding "punch list" item from pre-shipment
inspections;
(7) Inspection/shipping release

2) The following quality documents shall be approved by

Contains Confidential Information of Both Dow and Saudi Aramco


Page 13 of 17
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

(BIDDER’ NAME: )
BIDDER’S PROPOSAL
EVALUATION
PURCHASER’S REQUIREMENT ( A or NA or D ) SEE
(PURCHASER)
GENERAL NOTE 3
Contractor/Company at 1 month prior to Pre-Inspection
Meeting (PIM) and/or start of fabrication as applicable.

(1) Inspection and Test Plan (ITP)


(2) WPS/PQR with Welding and/or NDE map
(3) NDE Procedures
(4) Alloy verification/Positive Material Identification (PMI)
Procedure, if applicable.
(5) Welding & Welding repair procedure
(6) Refractory/lining installation procedure (as applicable)
(7) Bidder/Sub-bidder personnel qualification for welding,
NDE and PMI
(8) Sub-Bidder's un-priced Purchase order
.
3) Bidder shall comply with requirement of Schedule Q with its
attachment as applicable

8.7 Information to be provided in Bidder’s Quotation

Bidder shall provide the following information in Bidder’s


quotation
1) Bidder shall provide information on their Saudi Arabian
based capabilities including:
(1) Facilities location, facilities description and technical
support capabilities
(2) After sales services, including Spare Parts inventory
(3) Local training facilities in Saudi Arabia and other
Middle East Locations
(4) Local representation in Saudi Arabia and other
Middle East Locations
V
2) A list of Bidder QA records to be prepared, submitted, or
made available for Contractor's and Company's review
and approval. (e.g. refractory installation, welding, repair,
heat treatment procedures, welder qualifications, hydro
testing, coating and non-destructive testing (“NDT”)
procedures)
3) Bidder is requested to provide complete information for
purchaser to evaluate bidder’s proposal deeply in
commercial and technical. The information required in
the table of “bidder data requirement” and in this Material
Requisition shall be submitted completely at bidder’s
quotation
4) Bidder shall identify country of origin of the material

Contains Confidential Information of Both Dow and Saudi Aramco


Page 14 of 17
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

(BIDDER’ NAME: )
BIDDER’S PROPOSAL
EVALUATION
PURCHASER’S REQUIREMENT ( A or NA or D ) SEE
(PURCHASER)
GENERAL NOTE 3
being quoted.

8.8 Assembly

V All platforms shall be assembled and checked for the dimensions


at shop prior to packing to eliminate the possibility of miss-
matching at site.

8.9 Submission of Quotation

- With the submission of quotation, bidder shall submit unit


price per tonnage basis for Platform & Ladder fabrication
with his quotation. All the scope of work and supply which are
V specified on Clause 3 and 4 shall include in the cost.
- Bidder shall estimate the price based on the attached
fabrication drawings.(See attachment in Para. 7.5)
- Structural section dimensions as shown in the fabrication
drawing will be modified as per attached on Para 7.4.

8.10 Verification on fabrication work for P/F & Ladder

1) DAELIM will provide the fabrication drawing to the bidder.


Bidder shall review/verify if any correction/additional
V comment is required with respect to the fabrication drawing
and the same shall be informed to DAELIM.
2) Bidder shall determine the split line on P/F & Ladder prior to
shipping and transportation.

8.11 Additional Work

V Any repair & rectification work at the job site due to mis-
fabrication shall be carried out by Platform & Ladder bidder with
his own cost.

8.12 Transporting and Packing

Platform & Ladders shall not be damaged during transportation.


Bidder shall apply a proper packing method for the transportation.

For oversees bidder, bidder shall confirm below container size


V
and cut the platform and ladder properly to fit container loading.

40 feet open top container dimension


Length 11,552 mm
Width 2,230 mm
Height 2,276 mm
V 8.13 Identification

Contains Confidential Information of Both Dow and Saudi Aramco


Page 15 of 17
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

(BIDDER’ NAME: )
BIDDER’S PROPOSAL
EVALUATION
PURCHASER’S REQUIREMENT ( A or NA or D ) SEE
(PURCHASER)
GENERAL NOTE 3

In addition to the fabricator’s identification marks, each item or


bundle of ladders and platforms shall be marked with a unique
tag number to clearly indicate its associated equipment.

8.14 Platform & Ladder Painting

Handrails, ladders and cage shall be painted as per given table


below.

HOT-DIP
GRATING
GALVANIZED
HAND RAIL (TOP)
TOP
V & MIDDLE RAIL HOT-DIP
INTERMEDIATE GALVANIZED
PLATFORM POST (for HAND
RAIL)
HOT-DIP
STRUCTURE
GALVANIZED
LADDER
HOT-DIP
GALVANIZED
CAGE

8.15 Quotation basis

Bidder shall provide the quotation using following document


attached in MR.

V - Full sets of detail drawing (PARTIAL, LATER)


- Estimated weight summary (PARTIAL, LATER)

Full sets of Platform & Ladder fabrication detail drawing for the
missing items will be provided later (After P.O)

8.16 Grating Fastening System

As per note 4 & 7 in RT2G-5530-01;

Note 4
Clips shall be “GRATE-FAST GRATING CLIPS” by Struct-Fast,
V Inc (or approved equal) New Boston Street, Woburn, MA 800
327-6719 or Unistrut Canada, Type GF, 800 521-7730.

Note 7
Grating clips other than Grate-Fast shall be submitted for owner’s
representative review and approval.

V 8.17 Working Drawing

Contains Confidential Information of Both Dow and Saudi Aramco


Page 16 of 17
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

(BIDDER’ NAME: )
BIDDER’S PROPOSAL
EVALUATION
PURCHASER’S REQUIREMENT ( A or NA or D ) SEE
(PURCHASER)
GENERAL NOTE 3

If working drawing is additionally required for detail fabrication,


the scope of making working drawing is bidder’s responsibility.
(ex. Grating cutting plan drawing or any additional detail drawing)
DAELIM will provide only a kind of fabrication drawings as
attached in Para. 7.5.

Contains Confidential Information of Both Dow and Saudi Aramco


Page 17 of 17
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

ATTACHMENT #1. VENDOR DATA REQUIREMENT


No. of For approval For final Final
Drawings & Documents
No. copies No. of Due No. of No. of
Requirements
with bid copies date copies copies
Detail Fabrication & Testing
1 2P 1E+2P 1E+2P 1E+2P
schedule (*)
Shipping & transportation
2 - 1E+2P 1E+2P 1E+2P
information (net/gross weight)
3 Sub vendor list - - - -
4 Spare parts list 2P 1E+2P 1E+2P 1E+2P
5 Inspection & test plan - 1E+2P 1E+2P 1E+2P
6 Inspection & test procedure - 1E+2P 1E+2P 1E+2P
7 Material Summary Report - 1E+2P 1E+2P 1E+2P
8 Manufacturer’s data report - 1E+2P 1E+2P 1E+2P
Test reports & certificates for
9 - 1E+2P 1E+2P 1E+2P
NDE
10 Mill test certificates - 1E+2P 1E+2P 1E+2P
WPS & qualification record with
11 - 1E+2P 1E+2P 1E+2P
weld map
Welders performance
12 - 1E+2P 1E+2P 1E+2P
qualification record
13 Weld metal control procedure - 1E+2P 1E+2P 1E+2P
14 Welding consumable - 1E+2P 1E+2P 1E+2P
Weld repair procedure
15 - 1E+2P 1E+2P 1E+2P
certificate
16 Packing procedure - 1E+2P 1E+2P 1E+2P
Painting procedure & inspection
17 - - - -
record
18 Bidder Quality Plan 2P 1E+2P 1E+2P 1E+2P
19 As Built Drawing - - - -
P: Print, E:Electronic file (PDF)
NOTE
1. : (*) DAELIM’s blank form shall be used.
2. : Document shall be approved by Purchaser at one (1) month prior to PIM.

Contains Confidential Information of Both Dow and Saudi Aramco


Page 1 of 1
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

ATTACHMENT #2. EXCEPTIONS AND DEVIATION LIST

The bid form Exceptions and Deviations to Project Specifications and Documents

The bid form requires Vendor to agree/confirm that the only deviations from the Project Specifications and
Documents that it possible are those stated in its proposed exceptions/alternatives listed in the Table attached
hereto. Purchaser has no responsibility to discover, identity, or resolve any others deviations from the
Specifications and Documents that may be contained in the other parts or Vendor’s bid.
If Vendor is awarded the contract, it must comply with all provisions of the Specifications and Documents as
revised only to reflect the proposed exceptions and alternatives that have been accepted by Purchaser.

(Vendor’s name)

(Signature of Vendor’s officer)

(Name & Title)

(Date)

Note)
1. If Vendor does not submit the signed documents with its proposal, its bid may be deemed to be non-
responsive to the invitation to bid and may be dropped from further consideration.

Contains Confidential Information of Both Dow and Saudi Aramco


Page 1 of 2
SADARA Isocyanates Plant Document No: MR-110496-12-292-101
Revision: 0
Issue Purpose: IFQ
Document Title: MATERIAL REQUISITION FOR PLATFORM AND LADDER (TDI/PMDI)

ATTACHMENT #2. EXCEPTIONS AND DEVIATION LIST

VENDOR’S PROPOSED EXCEPTIONS AND DEVIATIONS


(NOTE: The Vendor may retype this page, but this format is required)
Impact on base Quotation if
Exceptions / Deviations are not
accepted (1)
Description of Proposed Exceptions / Reason for
Doc.No./Para. Specification Schedule
No. Deviations including Suggested proposing Cost Impact
No. Requirement Impact
Modification to Project Specifications Exceptions /
Deviations

(1) This Quotation is the total effect on Vendor’s proposal if Purchaser would not accept Vendor’s proposed exceptions/alternatives.
(2) Vendor to specify as “Mandatory,” if there is any deviation which is inevitable. Vendor also to specify justification in detail.
.

Contains Confidential Information of Both Dow and Saudi Aramco


Page 2 of 2