NOTE

PRELIMINARY SPECIFICATIONS TO BE
APPROVED BY THE DEPARTMENT OF
SERVICE OF Christie Innomed Inc.

THE PLAN SHOULD BE APPROVED BY


THE PHYSICIST FOR THE PHYSICAL
POSITIONING OF THE EQUIPMENT AND
SPECIFICATIONS OF THE SHIELDING.

POSITIONING OF THE EQUIPMENT TO BE


APPROVED BY THE CLINICAL PERSON IN
CHARGE OF THE DEPARTMENT.

May 17, 2018


04 COORDINATION
03 COORDINATION
02 COORDINATION
01 INFORMATION
NO. DESCRIPTION
ALL INFORMATION
CONTAINED ON THESE PLANS
MAY NOT BE USED FOR
PLANNING, CONSTRUCTION
OR INSTALLATION PURPOSES

1-866-888-0885

1-866-888-0885
Date: May. 29/2018

CLIENT
BULKLEY VALLEY DISTRICT HOSPITAL -NORTHERN HEALTH AUTHORITY BULKLEY
DISTRICT
SHIMADZU RADSPEED PRO DIGITAL RADIOGRAPHY SUITE HOSPITAL
PROJECT

SUITE
By: null

THE CUSTOMER APPROVES THE EQUIPMENT POSITIONING DRAFTMAN


SIGNATURE: DATE: KK, CV
These specifications are based on the DRAWING LEGEND
SCALE
Source: BidCentral

manufacturer's recommendations and are PRINT NAME: TITLE: SHEET DESCRIPTION

01 COVER / TITLE
N.T.S.
provided by and under the responsibility of THE CUSTOMER IS INFORMED OF MINIMAL TECHNICAL REQUIRED SPECIFICATIONS
Christie Innomed inc. 02 ROOM LAYOUT DATE
03 STRUCTURAL PLAN
These recommendations must be approved SIGNATURE: DATE: 04 ELECTRICAL PLAN
18/05/08
by Christie Innomed inc. department of
installation and service.
05 ELECTRICAL NOTES PROJECT No.
PRINT NAME: TITLE: 06 SERVICE
07 SHIELDING
BVH2018-02
PAGE
01 07
NOTE

PRELIMINARY SPECIFICATIONS TO BE
APPROVED BY THE DEPARTMENT OF
SERVICE OF Christie Innomed Inc.

THE PLAN SHOULD BE APPROVED BY


THE PHYSICIST FOR THE PHYSICAL
POSITIONING OF THE EQUIPMENT AND
SPECIFICATIONS OF THE SHIELDING.

POSITIONING OF THE EQUIPMENT TO BE


APPROVED BY THE CLINICAL PERSON IN
CHARGE OF THE DEPARTMENT.

EQUIPMENT LEGEND May 17, 2018


DIMENSION WEIGHT
EX 30 x70 NEW 04 COORDINATION
IDENTIFICATION DESCRIPTION (in / cm) (LBS / kg)
BTU/HR EX 40 x70 28 x70 03 COORDINATION
W D H
DOOR LEADED 8
DOOR
SHIMADZU DOOR 02 COORDINATION
14.96 3.23 13.59 6 1
1 UD150
38 8 34.5 2.72 01 INFORMATION
X-RAY CONTROL CONSOLE
SHIMADZU 2855 NO. DESCRIPTION
9
UD150 X-RAY CONTROLE CABINET 27.58 15.75 68.88 552
2 (CONTAINS XAT-2H AND SA-42 HIGH SPEED 70 40 175 250 ALL INFORMATION
STARTER) CONTAINED ON THESE PLANS
SHIMADZU MAY NOT BE USED FOR
92.5 32.31 706
3 BK-200 -
ELEVATING RADIOGRAPHIC TABLE
235 82 320 PLANNING, CONSTRUCTION
516
SHIMADZU OR INSTALLATION PURPOSES
15.75 15.59 13.81 67 2
4 BK-200
TABLE ELECTRONIC CABINET
41 40 35 30 EX 28 x70 7

SHIMADZU
196.9 102 112.21 838
DOOR
5 CH-200 (5m x 2.6m RAILS)
500 260 285 380
CEILING MOUNTED TUBE SUPPORT 5
SHIMADZU
1707 4
15.75 12.59 15.69 67
6 CH-200 TUBE SUPPORT ELECTRONIC CABINET 6
41 32 40 30
(ON BK-200 EC) WITH R-30H COLLIMATOR
SHIMADZU
24.81 25.6 87.5 353
7 BR-120T
63 65 222 160
119
7'-9"

[2514]
VERTICAL WALL BUCKY

8'-3"
[2359]
8 DR SYSTEM WORKSTATION - - - - 1000 3

RIS / PACS
9 CONSOLE (CUSTOMER SUPPLY) - - - - - 1-866-888-0885

CLIENT

4"
[1516]
4'-113
X03 BULKLEY VALLEY
SITE CONDITIONS FOR RADSPEED PRO

CONTROL AND X-RAY ROOM AREA


DISTRICT
HOPSITAL
AMBIENT OPERATION TEMPERATURE
PROJECT
HUMIDITY 30% - 85% NON CONDENSING

ATMOSPHERIC PRESSURE 800 hPa to 1060 hPa


SUITE
ENVIRONEMENT LUMINOSITY 150 lx to 500 lx

ENVIRONEMENT NOISE LEVEL UPER 70dB

CEILING
MINIMUM CEILING HEIGHT 106'' ( 270 cm) ROOM LAYOUT MARK ROXBOROUGH
RECOMMANDED CEILING HEIGHT 112'' ( 285 cm) SCALE: 1/4'' = 1'-0'' DRAFTMAN
KK, CV
SCALE
1/4''=1'-0''
DATE
18/05/08
PROJECT No.
BVH2018-02
0 1 2 3 4 5 6 7 8 9 10
PAGE
02 07
NOTE
STRUCTURE PRELIMINARY SPECIFICATIONS TO BE
APPROVED BY THE DEPARTMENT OF
SERVICE OF Christie Innomed Inc.
PROVIDE AND INSTALL A CEILING STRUCTURE HAS DEMONSTRATED
ANTI-VIBRATION. THE PLAN SHOULD BE APPROVED BY
THE PHYSICIST FOR THE PHYSICAL
STRUCTURE MUST SUPPORT MOBILE CHARGE OF (455kg) 1000 POUNDS POSITIONING OF THE EQUIPMENT AND
SPECIFICATIONS OF THE SHIELDING.
MAXIMUM STRUCTURE DEFORMATION RECOMMENDED (0.76mm)1/32"
POSITIONING OF THE EQUIPMENT TO BE
MAXIMUM (1.52mm) 1/16" APPROVED BY THE CLINICAL PERSON IN
CHARGE OF THE DEPARTMENT.
STRUCTURE MADE OF TWO BEAMS PARALLEL AND LEVEL
CONSULT A BUILDING STRUCTURE ENGINEER
HARDWARE TO BE SUPPLY
50 NUT 5/16''
PATIENT
LIFT RAIL May 17, 2018
50 WASHER 5/16''
04 COORDINATION
50 LOCK WASHER 5/16'' 03 COORDINATION
125 02 COORDINATION

[1979]
GALVANIZED FINISHES
X-RAY 01 INFORMATION

6'-6"
NO. DESCRIPTION

[2514]
8'-3"
CEILING

[433]
ALL INFORMATION

1'-5"
CONTAINED ON THESE PLANS
DISTANCE BETWEEN FLOOR AND STRUCTURE MAY NOT BE USED FOR
MINIMUM (2700mm)106" WITH LOW CEILING ADAPTER PLANNING, CONSTRUCTION
RECOMMENDED (2845mm) 112" PATIENT OR INSTALLATION PURPOSES

[534]
1'-9"
LIFT RAIL
NOTE WALL REINFORCEMENT
LF02
1- REINFORCEMENT FOR LEAD APRON (SEE PERSON IN CHARGE)
2- REINFORCEMENT FOR WALL BUCKY(50mmx 610mmx 610mm) 2"x24"x24",
CENTER AT (2032mm) 80" OF THE FINISH FLOOR.
UNISTRUT
GENERAL NOTE (TOTAL 7)
THE STRUCTURE MUST BE ACCEPTED BY CHRISTIE INNOMED INC. THE CEILING
SURFACE MUST BE FREE OF (SPRINKLER, DETECTOR, FIXTURE, ETC) 883" 2'-6" 2'-6" 2'-6" 2'-6" 2'-6" 2'-6" 883" 1-866-888-0885

CLIENT
381" 1'-0"
BULKLEY VALLEY
DISTRICT
BEAM HOPSITAL
CEILING
PROJECT

SUITE
2845
112''
[1018]
3'-4"

MARK ROXBOROUGH
DRAFTMAN
KK, CV
[1065]
3'-6"

FLOOR
SCALE
DETAIL "AA"
SCALE: N.T.S. 1/4''=1'-0''
FLOOR
DATE
18/05/08
ELEVATION 1 PROJECT No.
SCALE: 1:50
BVH2018-02
0 1 2 3 4 5 6 7 8 9 10
PAGE
03 07
NOTE

PRELIMINARY SPECIFICATIONS TO BE
APPROVED BY THE DEPARTMENT OF
SERVICE OF Christie Innomed Inc.

THE PLAN SHOULD BE APPROVED BY


THE PHYSICIST FOR THE PHYSICAL
POSITIONING OF THE EQUIPMENT AND
SPECIFICATIONS OF THE SHIELDING.

POSITIONING OF THE EQUIPMENT TO BE


APPROVED BY THE CLINICAL PERSON IN
CHARGE OF THE DEPARTMENT.

W1
4
May 17, 2018
A2 MC2 6
W1 2
04 COORDINATION
03 COORDINATION
CBA1 MC1 1 02 COORDINATION
A1 C2 G D 01 INFORMATION
E-STOP CBA1 3 1 CBA2 NO. DESCRIPTION
[1989]

C3
1"
6'-64

E-STOP C1
ALL INFORMATION
CONTAINED ON THESE PLANS
3
MAY NOT BE USED FOR
PLANNING, CONSTRUCTION
D
B OR INSTALLATION PURPOSES
G
C2,C1
2 ELECTRICAL DIAGRAM
- SCALE: N.T.S.
C3
E CEILING

7'-9" CONDUIT INSIDE NEW


FUR OUT WALL
[2362]
4
B 1-866-888-0885

CLIENT
4"
[1515]
4'-113

BULKLEY VALLEY
C2 DISTRICT
C3
C1 HOPSITAL
[610]
E
2'

[306] PROJECT
1'
FLOOR

1 SUITE
-

MARK ROXBOROUGH
DRAFTMAN
KK, CV
SCALE
1/4''=1'-0''
DATE
18/05/08
PROJECT No.
BVH2018-02
0 1 2 3 4 5 6 7 8 9 10
PAGE
04 07
NOTE

PRELIMINARY SPECIFICATIONS TO BE
APPROVED BY THE DEPARTMENT OF
SERVICE OF Christie Innomed Inc.

THE PLAN SHOULD BE APPROVED BY


THE PHYSICIST FOR THE PHYSICAL
POSITIONING OF THE EQUIPMENT AND
INCOMING DEDICATED LINE REQUIREMENTS BOXES AND CONDUITS: SPECIFICATIONS OF THE SHIELDING.

POSITIONING OF THE EQUIPMENT TO BE


Box C3: 24"x24"x6" flush mount bottom at 12" from the finish floor with a removable APPROVED BY THE CLINICAL PERSON IN
CHARGE OF THE DEPARTMENT.
Power transformer 75 kVA minimum. Recommended Delta, Bemag cover.
Power transformer with copper/copper winding.
Box B: 6"x6"x4" flush mount to the floor with removable cover.

Line maximum impedance of 0,16 the run of the Box D: 6"x6"x4" flush mount , bottom at 12" from the finish floor with removable
cover.
May 17, 2018
feeder.
L1, L2, L3, neutral, dedicated and isolated ground from transformer and regular Box E: 8"x8"x6" in the ceiling, with removable cover. 04 COORDINATION
ground.Copper wires. Box G: 6"x6"x4" surface mount, bottom at 36" from the finish floor with removable 03 COORDINATION
cover. 02 COORDINATION
Isolated ground same gage as feeder. Regulard ground per code 01 INFORMATION
W1: Hexagonal boxes and XRAY warning indicators at the door. Contact and power
Wire size per code, maximum impedance and run. (120VAC) from XRAY generator. NO. DESCRIPTION
ALL INFORMATION
Run 0" to 50'-0" , 5 Cupper conductor #3 AWG,
CONTAINED ON THESE PLANS
Run 50'-0" to 100'-0", #1 AWG, 100'-0" to 200'-0", #00 AWG MAY NOT BE USED FOR
PLANNING, CONSTRUCTION
OR INSTALLATION PURPOSES

Conduit #4: 4"x4" duct conduit inside new fur out wall between box E and box C3.

Conduit #5: NA
Conduit #6: conduit and/or conductor for warning indicators X-Ray at the doors
Generator short term 120 kVA , long term 500 VA between W1 and box C2.

No screws protruding into the ducts will be accepted


All boxes with screwed cover
1-866-888-0885
Pull rope in all the conduits
A2:120/208 or 120/240Vac Single phase Any change of position or specifications must be approved by CLIENT
CHRISTIE INNOMED INC.
BULKLEY VALLEY
DISTRICT
Circuit 1: 120Vac 15 A circuit breaker, L, N, GND for XRAY warning light HOPSITAL
Circuit 2: 120Vac 15 A circuit breaker, L, N, GND for internal use
PROJECT
Circuit 3: 208/240Vac 15 A circuit breaker, L1,L2, N,GND for table
Circuit 4: 208/240Vac 15 A circuit breaker, L1, L2,,N,GND for tube support SUITE
cover and terminals blocks for the 4 circuits (CBA2) and 2 terminal blocks for
W1.
Install 4 connectors 21
MARK ROXBOROUGH
ELECTRICAL NOTES DRAFTMAN
SCALE: N.T.S.
KK, CV
SCALE
1/4''=1'-0''
DATE
18/05/08
PROJECT No.
BVH2018-02
0 1 2 3 4 5 6 7 8 9 10
PAGE
05 07
May 17, 2018
NOTE

PRELIMINARY SPECIFICATIONS TO BE
APPROVED BY THE DEPARTMENT OF
SERVICE OF Christie Innomed Inc.

THE PLAN SHOULD BE APPROVED BY


THE PHYSICIST FOR THE PHYSICAL
17'-11" POSITIONING OF THE EQUIPMENT AND
SPECIFICATIONS OF THE SHIELDING.
[5461] POSITIONING OF THE EQUIPMENT TO BE
APPROVED BY THE CLINICAL PERSON IN
CHARGE OF THE DEPARTMENT.

4' 2'-8"
[1219] [813]

NEW
May 17, 2018
EX 30 x70 EX 40 x70 28 x70
DOOR LEADED DOOR 04 COORDINATION
DOOR 03 COORDINATION
02 COORDINATION
01 INFORMATION
NO. DESCRIPTION
ALL INFORMATION
CONTAINED ON THESE PLANS
MAY NOT BE USED FOR
PLANNING, CONSTRUCTION
EX 28 x70 OR INSTALLATION PURPOSES
DOOR
[5251]
4"
17'-23

1-866-888-0885

CLIENT
BULKLEY VALLEY
DISTRICT
HOPSITAL
PROJECT

ROOM LAYOUT SUITE


SCALE: 1/4'' = 1'-0''

MARK ROXBOROUGH
SHIELDING:
DRAFTMAN
FOR RECOMMENDATION OF THE PHYSICIST KK, CV
SCALE
1/4''=1'-0''
DATE
18/05/08
PROJECT No.
BVH2018-02
0 1 2 3 4 5 6 7 8 9 10
PAGE
07 07