Professional Documents
Culture Documents
Seaman Job Study Center Inc.: Training Plan
Seaman Job Study Center Inc.: Training Plan
TRAINING PLAN
Qualification: COMPUTER SYSTEMS AND SERVICING NC II
Trainees’ Facilities/
Training Activity/ Mode of Assessme Date and
Training Staff Tools and Venue
Task Training nt Method Time
Requirement Equipment
CORE COMPETENCIES
1 Install and Assemble Lecture John Carlo CBLM Comp Written M–F
configure computer Capistrano Learning uter examinati 7:00 –
Discuss
computer hardware elements Labora on 2:00
ion
systems and tory
Install operating Demon Practical
manuals
system and stration examinati
drivers for Working on
Viewing area/bench
peripherals/
multim
devices.
edia
Install the
computer
application
software
Conduct testing
and
documentation
2 Set-up Install network Lecture John CBLM Comp Written M–F
Learning
computer cables Discuss Carlo uter examinat 7:00 –
Training Plan in CSS NC Date developed: Document No.
II
Unit of Competency:
Developed by: Issued by:
Setting-Up Computer
John Carlo
Networks
Capistrano
SEAMAN JOB STUDY CENTER INC.
4 Maintain and Plan and prepare Lecture John Carlo CBLM Comp Written M–F
repair for maintenance Capistrano Learning uter examinati 7:00 –
Discuss
computer and repair elements Labora on 2:00
ion
systems and and tory
Maintain Demon Practical
Training Plan in CSS NC Date developed: Document No.
II
Unit of Competency:
Developed by: Issued by:
Setting-Up Computer
John Carlo
Networks
Capistrano
SEAMAN JOB STUDY CENTER INC.
Unit of Competency:
Developed by: Issued by:
Setting-Up Computer
John Carlo
Networks
Capistrano
SEAMAN JOB STUDY CENTER INC.
Unit of Competency:
Developed by: Issued by:
Setting-Up Computer
John Carlo
Networks
Capistrano