PROJECT PROPOSAL

General Information

Project Title : Goat Raising


Project Site : Municipality of Licuan-Baay, Province of Abra _____
Sitio : Barangay : Bulbulala_______
Municipality : Licuan-Baay Congressional District : Lone _____
Province : Abra Region : CAR

Total Project Cost : P 50,000.00


Direct : _ 43,478.26_______
Indirect : _ 6,521.74_____

Source of Fund: ___________________________________________________

Beneficiary/Convergence Agency(ies) Counterpart (if any): Bayuya Multi-purpose Cooperative Agency:


NATIONAL COMMISSION on INDIGENOUS PEOPLES___

Estimated Beneficiaries:
No. & Tribe of Direct Beneficiaries: 16 Binongan tribe No. &
Tribe of Indirect Beneficiaries:

Project Type : Livelihood Project Status


: New
Project Linkages and Address : _________________________
Proponent(s) and Address : _Bayuya Multi-purpose Cooperative_____________
Period of Implementation : __4th Quarter 2008 _____ ______
Target Date of Start :
Target Date of Completion :
Mode of Implementation : Administration
Implementor(s) and Address: NCIP Abra Provincial Office, Calaba, Bangued, Abra

Prepared by: Recommended to the Reviewed and Endorsed to


Provincial Office: the Regional Office:

CARLO D. LABUGUEN REYNALDA T. TIMBREZA ATTY. RUSSELL A. BRAGAS


CSC-Staff CSC Head Provincial Officer

Recommended to the Regional Director:

RECTO C. ALAWAS
Chief, TMD

Endorsed:

ATTY. AMADOR P. BATAY-AN ATTY. EUGENIO INSIGNE


Regional Director Chairman
Republic of the Philippines
OFFICE OF THE PRESIDENT

National Commission on Indigenous Peoples


ABRA PROVINCIAL OFFICE
Abra Tingguian Center, Abra-Ilocos Norte Road,
Calaba, Bangued, Abra

PROJECT PROPOSAL

1. GENERAL INFORMATION

1.1 Project Title : Repair & Improvement

1.2 Project Location/Site : Abra Tingguian Center, Calaba, Bangued, Abra

1.3 Total Project Cost : P500,000.00

1.4 Source of Fund : National Commission on Indigenous

Peoples

1.5 Estimated Total No. of


Beneficiaries : ICCs/ IPs Populace of Abra (Tingguians)

1.6 Project Type :

1.7 Project Status : New

1.8 Project Linkages & Address:

1.9 Proponents & Address : NCIP-Abra

1.10 Period of Implementation :

1.11 Implementor’s Address : NCIP-Calaba, Bangued, Abra

2. PROJECT DESCRIPTION

2.1 Background/Community Profile


The Abra Tingguian Center was constructed way back 1997, the main building’s
original purpose was to serve as NCIP-Abra’s Half-way/ transient house, and it was designed
as a residential building and not an office building. It currently houses the office of the
Provincial Officer and Provincial Office Staff. An annex building: a one storey structure
with two rooms. This was intended as the work space of our staff from the three Service
Centers when they report at the Provincial Office. The Tingguian Center Multi-purpose Hall:
situated between the two buildings. It is very useful and convenient for meetings/
conferences, programs/ ceremonies of all occasions and other activities. The hall is also often
used by different Tingguian Organizations in their meetings/ conferences.

2.2 Rationale / Basic Assumptions / Justification for the Undertaking of the Project
Having our own buildings and multi-purpose hall spare us from having to rent an
office space or meeting venue every time we need one. However, there is no fund allocated
for their maintenance and/ or repair. The buildings now appear neglected and much older for
their age. Of the three buildings, only the main building had a taste of paint.

It is therefore on this premise that the allocation of funds for the repair and
improvement of the Abra Tingguian Center to enhance the working atmosphere of the NCIP
staff in the province of Abra as well as the clientele, thus, this proposal.

3. OBJECTIVES

General: To enhance the working condition of the NCIP staff and facilitate the
reception of the clientele of the office.

Specific:
a) Proposal number one, the main building: to tear up the dividing wall in the
ground floor to make the whole ground floor one big space enough to accommodate all
Provincial Office staffs (with provision for an enclosed pantry near the existing
restroom) and reception area for the public callers; Install air-conditioning units in the
ground and second floors; Make the first room in the second floor as the office of the
Provincial Officer and conference area, the other room to remain as guest room for
visiting NCIP officials and employees; Repaint the whole building (external and
internal), repair the leaks in the roof, replace broken windows, repair the restrooms;
Provide additional three (3) office desk and chairs, one executive table and chair.

b. Proposal number two, the annex building: construction of restrooms; Repaint


the whole building, replace broken windows; Three (3) office desks and chairs, three
clerical desks and chairs.

c. Proposal number three, the multi-purpose hall: Paint the posts and stage;
install electrical outlets and lighting fixtures; install two (2) units ceiling fans.

4. PROJECT DESCRIPTION

The repair and improvement of the Abra Tingguian Center is a small


infrastructure project.

The actual implementation of the project shall be undertaken by NCIP staff. The
recipients/beneficiaries of the stocks shall be responsible of raising the said goats and
shall be turned over to the next set of beneficiaries after one kidding to ensure the
continuity of the project, thus benefiting a greater number of beneficiaries.

5. IMPLEMENTING STRATEGIES

7. SCHEDULE OF ACTIVITY/PROJECTED TIME FRAME

4th QUARTER
ACTIVITY OCTOBER NOVEMBER DECEMBER
1 2 3 4 1 2 3 4 1 2 3 4
1.Pre-implementation stage
a. Coordination/consultation 1 day
b. Organizing 1 day
2. Implementation Stage
a. Awarding of Project 1 day
b. Training 1 day
c. Distribution of stocks 1 wk
d. Monitoring 1 wk
3. Post Implementation Stage
a. Evaluation 1 day
b. Turn-over & acceptance
- - - - - - -

8. Attachment/s