Professional Documents
Culture Documents
2013
DATA FOR MRM CPA's status till dated
Sr. No Site CPA's raised CPA's Closed out % Compliance
Distribution
1 MUL-D 8 7 88
2 SKP-D 5 5 100
3 GUJ-D 16 16 100
4 SWL-D 4 0 0
5 BWP-D 3 2 67
6 PSR-D 7 5 71
7 FSD-D 15 14 93
8 LHR-D 2 2 100
9 ISD-D 10 10 100
10 ABT-D 2 2 100
11 SGD-D 1 1 100
73 64 87.67
Transmission
1 LHR-T 4 3 75
2 WAH-T 6 5 83
3 FSD-T 19 19 100
4 MUL-T 14 11 79
43 38 88.37
Compression
1 MUL-C 13 11 85
2 FSD-C 12 12 100
25 23 92
Projects
1 CP- Uch 9 8 89
CS-S Kacha Khu
2 Camp 18 15 83
3 ISD / Wah Camp 0 0 0
4 Manga Ws 4 3 75
5 Gujranwala Camp 9 8 89
6 Phoolnagar Camp 0 0 0
7 Nowshera Camp 5 5 100
45 39 86.67
FSD Telecom
1 FSD-Telecom 4 4 100
Metering Workshop
1 CMS 5 5 100
Manga Stores
1 CBS Manga 7 2 29
Civil HO
1 Civil HO 13 11 85
As of 12.08.2020
Type of
Sr. Capacity Custodain of Plant
Site Indenter installed PO No and Date PO Amount (Rs) Brand Vendor Asset Code No Remarks
No LPH (At present)
Filtration plant
1
As of 30.01.18
Status of RO Plants Across Company