As of 22.04.

2013
DATA FOR MRM CPA's status till dated
Sr. No Site CPA's raised CPA's Closed out % Compliance
Distribution
1 MUL-D 8 7 88
2 SKP-D 5 5 100
3 GUJ-D 16 16 100
4 SWL-D 4 0 0
5 BWP-D 3 2 67
6 PSR-D 7 5 71
7 FSD-D 15 14 93
8 LHR-D 2 2 100
9 ISD-D 10 10 100
10 ABT-D 2 2 100
11 SGD-D 1 1 100
73 64 87.67
Transmission
1 LHR-T 4 3 75
2 WAH-T 6 5 83
3 FSD-T 19 19 100
4 MUL-T 14 11 79
43 38 88.37
Compression
1 MUL-C 13 11 85
2 FSD-C 12 12 100
25 23 92
Projects
1 CP- Uch 9 8 89
CS-S Kacha Khu
2 Camp 18 15 83
3 ISD / Wah Camp 0 0 0
4 Manga Ws 4 3 75
5 Gujranwala Camp 9 8 89
6 Phoolnagar Camp 0 0 0
7 Nowshera Camp 5 5 100
45 39 86.67
FSD Telecom
1 FSD-Telecom 4 4 100

Metering Workshop
1 CMS 5 5 100

Manga Stores
1 CBS Manga 7 2 29

Corrosion Control Centre


1 CCC 24 23 96

Civil HO
1 Civil HO 13 11 85
As of 12.08.2020

Status of RO / Water Filtration Plants insatalled by HSE Department Company vide

Type of
Sr. Capacity Custodain of Plant
Site Indenter installed PO No and Date PO Amount (Rs) Brand Vendor Asset Code No Remarks
No LPH (At present)
Filtration plant

1
As of 30.01.18
Status of RO Plants Across Company

Total RO Plants Installed

RO Plants Under RO Plants for


Under Un operational / Procurement for FY Future
Installed Installation Operational Expansion Required 2017-18 Procurement Remarks

Plant at B-III Shahdara is


operational on 30.01.18
after necessary
maintenance however
expansion requried.
Proposal awaited. Budget
31 4 30 arranged by Transmission 25 12