Asphalt Cement Pump Calibration

Proj. No. S.P. 69-609-032 Date: 7/30/2013

Contractor: Northland Construction Pit: Levine Pit

Asphalt Tank Stickings


Begin End
Temperature Degree F 273 270
Inches down in tank 2.5 60
Tank Volume in Gallons A 10000 10000
Gallons Out B 210 5000
Gallons Asphalt in Tank A-B=C 9790 5000
Temperature Correction Factor D 0.92763 0.92862
Corrected Gallons @ 60 F. C*D=E 9081 4643
Weight Per Gallon @ 60 F. F 8.605 8.605
Lbs. at 60 F E*F=G 78146 39954
Tons at 60 F G/2000=H 39.073 19.977
Total AC Hauled In I 21.75
Total Asphalt (Begin) H+I=J 60.823
Total Asphalt (End) K 19.977
Total Asphalt Used (sticking) J-K=L 41.727
Total Asphalt Used (meter) M 41.327
Accuracy of Tank Stickings to ((J-
Asphalt Meter K)/J)*100 0.96
Tolerance is plus or minus 1%

MEETS CALIBRATION

NOTES: 1st day of production, Tanks stuck before start up and again after 1
hour of production. The asphalt pump meets the calibration
requirements. Signed by producer and inspector.
Asphalt Plant Calibration
Project Date:

Contractor Pit:

Asphalt Pump Calibration


Begin End
Temperature Degree F 275 275
Inches down in tank
Tank Volume in Gallons A
Gallons Out of Tank B
Gallons left in Tank A-B=C
Temperature Correction Factor* D 0.92697 0.92697
Corrected Gallons @ 60 F. C*D=E 0 0
Wt. / Gal. @ 60 F,see Bill of Lading. F
Asphalt Lbs. at 60 F E*F=G 0 0
Asphalt Tons at 60 F G/2000=H 0.000 0.000
Total Asphalt Hauled In, Tons I -
Total Asphalt (Begin) Tons H+I=J 0.000 % Asphalt
Total Asphalt (End) Tons K 0.000
Total Asphalt Used (sticking) J-K=L 0.000 (L/P)*100
Total Asphalt Used (meter) M

((L-M)
Accuracy of Tank Stickings to Asphalt Meter /M)*100

Tolerance is plus or minus 1% FAILS CALIBRATION REQUIREMENTS

Bituminous Scale Calibration


Tons of Bituminous Mixture
(Certified Scale Tickets, include tons in the silo) (P)
Tons of Bituminous Mixture
(Plant Recordation Report, see 2360.2G8) (Q)
Accuracy of Certified Scale to Plant ((P-Q/P)*100
Recordation print out
Tolerance is plus or minus 1% FAILS CALIBRATION REQUIREMENTS

NOTES: 1st day of production, Tanks stuck before start up and again after approximately
1,000 tons of production. Signed and dated by Agency and Producer
Asphalt Plant Calibration Instructions

The purpose of the Asphalt Plant Calibration is to verify the accuracy of +/- 1
percent for the asphalt pump and scales.

1. Prior to plant start up on the first day of production, determine the quantity
of gallons with the assistance of the plant operator. Calculations in the "Begin
Column".

2. When approximately 1,000 tons of mixture has been produced the asphalt
volume used must be determined. This can be done by shutting down the plant
and sticking the asphalt tank, reading the certified scale weights, including any
additional asphalt hauled in, verifying any weight in the silo and verifying the
weights on the recordation print out. It will be beneficial to time the plant
shutdown with the recordation print out. The decision to shut the plant down
during the calibration process is that of the producer. If the pump calibration or
the scale calibrations fail to meet the requirements, production will be halted
until the calibration requirements are met as detailed in the specifications. The
accuracy of the belt scale calibration is dependant on the accuracy of the
moisture contents of the stockpiles.
Asphalt Plant Calibration
Project Date:

Contractor Pit:

Asphalt Pump Calibration


Begin End
Temperature Degree F
Inches down in tank
Tank Volume in Gallons A
Gallons Out B
Gallons Asphalt in Tank A-B=C
Temperature Correction Factor D
Corrected Gallons @ 60 F. C*D=E
Weight Per Gallon @ 60 F. F
Lbs. at 60 F E*F=G
Tons at 60 F G/2000=H
Total AC Hauled In, Tons I -
Total Asphalt (Begin) Tons H+I=J % Asphalt
Total Asphalt (End) Tons K
Total Asphalt Used (sticking) J-K=L (L/P)*100
Total Asphalt Used (meter) M

Accuracy of Tank Stickings to Asphalt Meter ((J-K)/J)*100

Tolerance is plus or minus 1%

Bituminous Scale Calibration


Tons of Bituminous Mixture
(Certified Scale Tickets, include tons in the silo) (A)
Tons of Bituminous Mixture
(Plant Recordation Report, see 2360.2G8) (B)
Accuracy of Certified Scale to Plant ((A-B/A)*100
Recordation print out
Tolerance is plus or minus 1%
* See Table 5-693.240 in Bituminous Manual for correction factor.
NOTES: 1st day of production, Tanks stuck before start up and again after approximately
1,000 tons of production. Signed and dated by Agency and Producer
Asphalt Plant Calibration
Project Example Date: 3/3/2014

Contractor Pit:

Asphalt Pump Calibration


Begin End
Temperature Degree F 273 270
Inches down in tank 2.5 60
Tank Volume in Gallons A 10000 10000
Gallons Out of Tank B 210 5000
Gallons left in Tank A-B=C 9790 5000
Temperature Correction Factor* D 0.92763 0.92862
Corrected Gallons @ 60 F. C*D=E 9081 4643
Wt / Gal. @ 60 F,see Bill of Lading. F 8.605 8.605
Asphalt Lbs. at 60 F E*F=G 78146 39954
Asphalt Tons at 60 F G/2000=H 39.073 19.977
Total Asphalt Hauled In, Tons I 21.05 -
Total Asphalt (Begin) Tons H+I=J 60.123 % Asphalt
Total Asphalt (End) Tons K 19.977 4.59
Total Asphalt Used (sticking) J-K=L 40.146 (L/P)*100
Total Asphalt Used (meter) M 39.895
((L-M)
Accuracy of Tank Stickings to Asphalt Meter 0.63 /M)*100

Tolerance is plus or minus 1% MEETS CALIBRATION REQUIREMENTS

Bituminous Scale Calibration


Tons of Bituminous Mixture
875.00
(Certified Scale Tickets, include tons in the silo) (P)
Tons of Bituminous Mixture
880.00
(Plant Recordation Report, see 2360.2G8) (Q)
Accuracy of Certified Scale to Plant -0.57 ((P-Q/P)*100
Recordation print out
Tolerance is plus or minus 1% MEETS CALIBRATION REQUIREMENTS

NOTES: 1st day of production, Tanks stuck before start up and again after approximately
1,000 tons of production. Signed and dated by Agency and Producer